About this file

This is an architectural drawing showing the entrance lobby finish plan and elevations for the Armed Forces Retirement Home (AFRH) Sheridan Building renovation in Washington D.C. The drawing (AI401) includes detailed floor pattern plans, elevator lobby elevations, and finish specifications for the main entrance area.

The drawing includes material legends and specifications for wall finishes, floor patterns, and a 6-foot high green wall feature with preserved plants and moss in mixed patterns. Key components shown include waiting rooms, vestibules, elevator lobby details, and specific finish materials designated as T-1, CPT-1, CPT-3, WC-1, WC-2, and various other material codes. The drawing provides precise measurements and installation details, including tile patterns, wall sconce locations, and finishing specifications around elevator doors and panels. The document is dated February 12, 2025, marked as a Construction Bid Document, and was prepared by AE Works Ltd. located in Sewickley, PA.

View the file

Other files

File Type Posted
Amendment 0006 Solicitation 47PM0325R0002 2025 03 25.pdf PDF
Amendment 0005 RFI Responses 150 - 336 2025 03 18.pdf PDF
Amendment 0005 Solicitation 47PM0325R0002 2025 03 18 (2).pdf PDF
Amendment 0004 Solicitation 47PM0325R0002 2025 03 13.pdf PDF
H103 - CHILLER PLANT.pdf PDF
Amendment 0003 Technical Evaluation Factors-Best Value_ Trade Off 2025 03 04.pdf PDF
Amendment 0003 Solicitation 47PM0325R0002 2025 03 04.pdf PDF
A517 - EXTERIOR PLAN DETAILS.pdf PDF
A516 - EXTERIOR PLAN DETAILS.pdf PDF
087113 - Automatic Door Operator.pdf PDF
079500 - Exterior Expansion Control.pdf PDF
A427 - SPA ROOMS AND LAUNDRY ROOMS.pdf PDF
084113 - Aluminum-Framed Entrances and Storefronts.pdf PDF
A406 - CLINICAL AREAS- NURSE STATIONS - FIRST FLOOR.pdf PDF
AD100A - BASEMENT DEMOLITION PLAN A.pdf PDF
Amendment 0003 Solicitation_GC AFRH 2025 03 04.pdf PDF
236416 FL - Centrifugal Water Chillers- Addendum 3.pdf PDF
AI407 - TYPICAL ELEVATOR LOBBY FINISH PLANS AND ELEVATIONS (FLOORS 2-7).pdf PDF
107113 - Exterior Sun Control Devices.pdf PDF
088700 - Window Film.pdf PDF
AD100B - BASEMENT DEMOLITION PLAN B.pdf PDF
A405 - CLINICAL AREAS-NURSE STATIONS - FIRST FLOOR.pdf PDF
HD103 - CHILLER PLANT DEMO PLAN.pdf PDF
AI408 - TYPICAL NORTH- SOUTH ELEVATOR LOBBY FINISH PLANS (FLOORS 2-7).pdf PDF
A409 - ENLARGED TOILET ROOM PLANS AND ELEVATIONS.pdf PDF
087100 - Door Hardware.pdf PDF
101423.16 - Panel Signage.pdf PDF
A504 - EXTERIOR WALL SECTION DETAILS.pdf PDF
000110 Table of Contents.pdf PDF
H603 - HVAC DETAILS.pdf PDF
AFRH-Sheridan Pre-Bid Addendum 2-12-25.pdf PDF
081416 - Flush Wood Doors.pdf PDF
A601 - DOOR SCHEDULE TYPES DETAILS.pdf PDF
S542 - STRUCTURAL BALCONY ENCLOSURE DETAILS.pdf PDF
A560 - TYPICAL ROOF DETAILS.pdf PDF
A503 - EXTERIOR WALL SECTION DETAILS.pdf PDF
A602 - DOOR SCHEDULE TYPES DETAILS.pdf PDF
S521 - STRUCTURAL ANNEX FRAMING DETAILS.pdf PDF
095000 - Wood Panel Ceiling.pdf PDF
S552 - STRUCTURAL TRASH CHUTE GENERATOR ENCLSOURE BALCONY ENCLOSURE DETAILS.pdf PDF
Amendment 0003 RFI Responses 1-149 2025 03 04.pdf PDF
235700 FL - Heat Exchangers for HVAC.pdf PDF
S401 - STRUCTURAL ROOF FRAMING PARTIAL PLANS.pdf PDF
Amendment 0003 Solicitation 47PM0325R0002 2025 03 04.pdf PDF
H804 - CONTROL DIAGRAMS.pdf PDF
AEWLA22050. Geotechnical Report. 10142022.pdf PDF
A412 - ENLARGED RESIDENT ROOM SHOWERS.pdf PDF
089119 - Fixed Louvers.pdf PDF
A112B - SECOND FLOOR REFLECTED CEILING PLAN B.pdf PDF
AI406 - FIRST FLOOR TOILET ROOM FINISH PLANS AND ELEVATIONS.pdf PDF
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WAITING ROOM

1019B

VESTIBULE

1019A

WAITING ROOM

1019C

FIRE

1017 MECH

AI401

T-1

CPT-1

T-1

CPT-1

T-1

CPT-3

AI401

C O

N C

T-

40' - 1"

/4

C O

N C

T-

OPP HAND

EQ-29 EQ-29

AI401 7

VESTIBULE

1019D

P-1

RB-1

CPT-3

WC-2/T-2

RB-1

CPT-1

P-1

RB-1

CPT-3

WC-2/T-2

RB-1

CPT-1

WC-1/T-2/T-3

RB-1

T-1

WC-1

RB-1

T-1

P-1

RB-3

CONC

WC-1

RB-1

T-1

P-1

RB-3

CONC

P-3/T-6/T-7

TR-1

T-1

P-3/T-6/T-7

TR-1

T-1

ELEVATOR LOBBY

T-3

TYP.

1' - 0"

TYP.

1' - 0"

T-2

WC-1

RB-1

WALL SCONCE;

REF. ELEC DWGS

EQ. EQ.

EQ. EQ.

TR-2 TYPICAL AT ALL WALL TILE

OUTSIDE CORNERS

TR-1 TYPICAL AT ALL WALL TILE

TO FLOOR TILE TRANSITIONS

SEE DRAWINGS AS-101 FOR SIGNAGE LOCATIONS

START FULL SIZED TILE AT SIDE

AND TOP OF ELEVATOR DOORS

COORDINATE FINISH INSTALLATION

AROUND EXISTING ELEVATOR

INDICATOR BUTTONS AND PANELS - TYP.

RB-1

T-2

WC-2 BEYOND

WALL SCONCE;

REF. ELEC DWGS

/8

EQ.1' - 0"EQ.

FE

TR-2 AT COLUMN

EDGES

WC-1

WC-2

RB-1

T-2 WRAPPED ON ALL SIDES OF COLUMN

WC-1

GREEN WALL 6' HIGH,

FULL WIDTH OF WALL

WC-2 ABOVE AND BELOW

GREEN WALL IN WAITING

ROOM

EQ-29

AI401

TR-2 AT EDGES

WC-2RB-1

CG-2 NOTE: PROVIDE WC-1 WALL FINISH IN ALL AREAS

AND ALCOVES UNLESS OTHERWISE NOTED.

T-1D

T-1C

T-1B

1' - 0"

2' - 0"

2' - 0"

1' - 0"

2' - 0"

4' - 0"

8"

T-1A

EXISTING SUB FLOOR

FINISHED FLOOR

RB-1

WALL TYPE

PER PLAN

WC-2

1/4" THICK

BACKING BOARD

P A

N E

L

P A

N E

L

ATTACH WITH

SCREW ANCHORS

TO FASTEN PANEL

/2

/2

PRESERVED

PLANTS; 6" MAX

WC-2

WRAP WC-2 ON

HORIZONTAL EDGE

WRAP WC-2 ON

HORIZONTAL EDGE

PRESERVED PLANTS AND MOSS MIXED PATTERN

BALL MOSS

BALL MOSS

FLAT MOSS

LICHEN MOSS LIGHT GREEN

FLOOR MATERIAL LEGEND AI401

T-1

CPT-1

CONCRETE

TILE DIMENSIONS AS SHOWN.

CENTER FLOOR PATTERN IN

CENTER OF AREAS.

GRAIN DIRECTION

WALL MATERIAL LEGEND AI401

T-2

T-3

FINISH SYMBOL LEGEND

NOTE: PROVIDE WALL AND FLOOR FINISH PER SYMBOL IN ROOM

AND PER FLOOR PATTERN. ACCENT WALL FINISHES NOTED ON

ELEVATIONS. FINISH LEGEND ON AI601, AI602, AI603.

FLOOR

BASE

WALL

N

DATE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

CLIENT:

418 BEAVER STREET

SEWICKLEY, PA 15143

PH: 412.287.7333

www.aeworks.com

PROFESSIONAL:

COPYRIGHT 2024 BY AE WORKS LTD ALL RIGHTS RESERVED.

SUBMISSION:

CONSTRUCTION BID

DOCUMENTS

AE WORKS®

A u to d e s k D o c s

/A F

R H

-0

S h e ri d a n /A

F R

H -0

A R

C H

-2

.r v t

/1

/2

:4

:5

P

M

AI401

CR

BAS

AFRH-033

ENTRANCE LOBBY

FINISH PLAN AND

ELEVATIONS

AFRH SHERIDAN

RENOVATION

140 ROCK CREEK

CHURCH ROAD,

NORTHWEST,

WASHINGTON, DC

ARMED FORCES

RETIREMENT HOME -

WASHINGTON D.C.

11/13/241/4" = 1'-0"

ENLARGED MAIN ENTRANCE - FLOOR PATTERN PLAN

1/4" = 1'-0"

ELEVATOR LOBBY ELEVATOR ELEVATION

1/4" = 1'-0"

ELEVATOR LOBBY ENTRANCE ELEVATION

1/4" = 1'-0"

ELEVATOR LOBBY WEST ELEVATION

1/2" = 1'-0"

ENTRANCE LOBBY TILE DETAIL

3/4" = 1'-0"

ENTRANCE LOBBY GREEN WALL DETAIL AND ELEVATION

NO DATE REVISION

1 02/12/2025 BID ADDENDUM

Sheets
A102 - OVERALL SECOND FLOOR PLAN
A102B - SECOND FLOOR PLAN B
A112B - SECOND FLOOR REFLECTED CEILING PLAN B
A405 - CLINICAL AREAS/NURSE STATIONS - FIRST FLOOR
A406 - CLINICAL AREAS/ NURSE STATIONS - FIRST FLOOR
A407 - NORTH SERVERY
A408 - SOUTH SERVERY
A409 - ENLARGED TOILET ROOM PLANS AND ELEVATIONS
A412 - ENLARGED RESIDENT ROOM SHOWERS
A427 - SPA ROOMS AND LAUNDRY ROOMS
A601 - DOOR SCHEDULE, TYPES, DETAILS
A602 - DOOR SCHEDULE, TYPES, DETAILS
AI401 - ENTRANCE LOBBY FINISH PLAN AND ELEVATIONS
AI402 - FIRST FLOOR ELEVATOR LOBBY FINISH PLANS AND ELEVATIONS
AI403 - SERVERY FINISH PLAN AND ELEVATIONS
AI405 - FIRST FLOOR ENLARGED CORRIDOR PLANS AND ELEVATIONS
AI406 - FIRST FLOOR TOILET ROOM FINISH PLANS AND ELEVATIONS
AI408 - TYPICAL NORTH/ SOUTH ELEVATOR LOBBY FINISH PLANS (FLOORS 2-7)
AS-101 - FIRST FLOOR SIGNAGE PLAN
AS-102 - TYPICAL FLOOR SIGNAGE PLAN (FLOORS 2-7)

File details come from the government source that posted it. Updated .