AD101 - OVERALL FIRST FLOOR DEMOLITION PLAN.pdf
PDF 588 KB Posted
- Solicitation number
- 47PM0325R0002
About this file
This is a demolition plan drawing showing the first floor layout of the Sheridan Building at the Armed Forces Retirement Home in Washington DC, with detailed general demolition notes. The drawing, created by AE Works and dated February 2025, shows a large H-shaped residential building floor plan with multiple residential units, corridors, common areas, and support spaces like laundry rooms, tub rooms, and mechanical spaces.
The demolition notes specify that all ceilings from the first through seventh floors are to be removed entirely, including ACT grid, drywall bulkheads, light fixtures, ductwork, vents, grilles and ceiling-mounted items. The contractor must verify existing conditions, coordinate demolition with new construction, provide dust-proof barriers, maintain building operations during work, and protect existing construction scheduled to remain. The notes emphasize proper disposal of materials, daily cleanup requirements, and the owner's right to remove or claim items prior to demolition. The drawing scale is 1/16" = 1'-0" and includes room numbers and labels for all spaces on the first floor.
View the file
Other files
Show 40 more
Latest 50 of 90 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2N
2N
3N
3N
4N
4N
8 10 12
19 21 23
NN
MM
LL
KK
JJ
HH
GG
FF
EE
DD
CC
BB
AA
HNHN
GNGN
FNFN
ENEN
DNDN
CNCN
BNBN
ANAN
HS HS
GS GS
FS FS
ES ES
DS DS
CS CS
BS BS
AS AS
NSNN
1N
1N
29S
29S
30S
30S
31S
31S
32S
32S
15.5
15.5
16.5
16.5
A.5A.5
B.5B.5
C.5C.5
D.5D.5
E.5E.5
F.5F.5
G.6 G.6
P A
R T
B A
D
1B
P A
R T
A A
D
1A
17.5
17.5
5.3
5.3
LAUNDRY
ACTIVITY
CORRIDOR
VESTIBULE
ACTIVITY
HOUSE KEEPING
1-5
STAIRS
UNIT
UNIT
UNIT
UNIT
1-1
STAIRS
UNIT
TUB ROOM
UNIT
UNIT
UNIT
UNIT
UNIT
1-6
STAIRS
TUB ROOM
TOILET
LAUNDRY 1014
TOILET
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
1-2
STAIRS
UNIT
UNIT
UNIT
CORRIDOR
FIRE
LOBBY
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
1-3
STAIRS
UNIT
UNIT
UNIT
UNIT
CORRIDOR
ELEC.
VENDING
LOUNGE 1029
TUB ROOM
J.C.
BLDG. MGMT.
UNIT 1032
FACILITY
MAINTENANCE
UNIT
1-7
STAIRS
UNIT
GENERAL
PURPOSE
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
1-4
STAIRS 1413
UNIT
UNIT
UNIT
TUB ROOM
LAUNDRY
CORRIDOR
CORRIDOR
ELEVATOR LOBBY 1041
VESTIBULE
FIRE
STORAGE1002
GEN. PURPOSE
LOUNGE 1022
MECH. RM.
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
ELEC.
UNIT
TLT.
TUB RM.
ELEC.
CLT.
ELEC.
AD201 2
AD201
AD202
AD2022
A B
N
DATE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DRAWING NO:
DRAWING TITLE:
PROJECT NAME:
CLIENT:
418 BEAVER STREET
SEWICKLEY, PA 15143
PH: 412.287.7333
www.aeworks.com
PROFESSIONAL:
COPYRIGHT 2024 BY AE WORKS LTD ALL RIGHTS RESERVED.
SUBMISSION:
CONSTRUCTION BID
DOCUMENTS
AE WORKS®
A u to d e s k D o c s
/A F
R H
-0
S h e ri d a n /A
F R
H -0
A R
C H
-2
.r v t
/1
/2
:5
:4
P
M
AD101
TW
DC
AFRH-033
OVERALL FIRST FLOOR
DEMOLITION PLAN
AFRH SHERIDAN
RENOVATION
140 ROCK CREEK
CHURCH ROAD,
NORTHWEST,
WASHINGTON, DC
ARMED FORCES
RETIREMENT HOME -
WASHINGTON D.C.
11/13/24
1/16" = 1'-0"
OVERALL FIRST FLOOR DEMOLITION PLAN
GENERAL DEMOLITION NOTES
1 VERIFY ALL EXISTING CONDITIONS AND COORDINATE ALL DEMOLITION ACTIVITIES
WITH ANY NEW CONSTRUCTION AS INDICATED WITHIN THE CONSTRUCTION
DOCUMENTS. DO NOT SCALE DRAWINGS.
2 PERFORM ALL NECESSARY DEMOLITION ACTIVITIES AS REQUIRED FOR INSTALLATION
OF NEW CONSTRUCTION AS INDICATED WITHIN THE CONSTRUCTION DOCUMENTS.
COORDINATE WITH THOSE DOCUMENTS FOR EXACT DIMENSIONS AND LOCATIONS OF
FINISHED WORK.
3 ALL DEMOLITION NOT SPECIFICALLY INDICATED, BUT NECESSARY TO COMPLETE THE
PROJECT AS INDICATED ON THE CONSTRUCTION DOCUMENTS, TO BE THE
RESPONSIBILITY OF THE CONTRACTOR.
4 INSPECT AND ACCESS EACH SPACE AND FULFILL THE INTENT OF THE WORK
REQUIRED BY THE CONTRACT DOCUMENTS. DEVIATIONS REQUIRED BY EXISTING
FIELD CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR
TO PROCEEDING WITH THE WORK.
5 ANY CUTTING AND REMOVAL INDICATED ON THE CONSTRUCTION DOCUMENTS ARE
GENERAL INDICATIONS ONLY AND MAY NOT NECESSARILY SHOW THE FULL EXTENT
OF CUTTING AND REMOVAL NECESSARY.
6 THROUGHOUT THE COURSE OF DEMOLITION ACTIVITIES, PROPERLY PROTECT AND
EXISTING CONSTRUCTION INDICATED TO REMAIN. EXCERCISE CARE WHEN REMOVING
ADJACENT CONSTRUCTION AND PROPERLY REPAIR (TO ORIGINAL CONDITION) ANY
AREAS SCHEDULED TO REMAIN THAT SUSTAIN DAMAGE AS A RESULT OF DEMOLITION
ACTIVITIES.
7 CONSTRUCT DUST PROOF PROTECTIVE BARRIERS AS NECESSARY AT AREAS OF
INTERIOR DEMOLITION TO PROTECT EXISTING CONSTRUCTION AND EQUIPMENT
SCHEDULED TO REMAIN.
8 PERFORM ALL WORK REQUIRED TO PROTECT BUILDING OCCUPANTS AND EXISTING
BUILDING UTILITIES. THE BUILDING WILL REMAIN IN OPERATION THROUGHOUT THE
COURSE OF DEMOLITION AND CONSTRUCTION ACTIVITIES.
9 PROVIDE ALL NECESSARY TEMPORARY BRACING AND SHORING AS REQUIRED TO
MAINTAIN THE INTEGRITY AND STRUCTURAL STABILITY OF THE BUILDING AND ITS
INDIVIDUAL ELEMENTS.
10 EXCEPT AS NOTED OTHERWISE, REMOVE ALL DEMOLISHED MATERIALS FROM THE
SITE AND DISPOSE OF IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL LAW
REGULATIONS. DO NOT BURN, BURY OR SELL MATERIALS ON THE PROJECT SITE. AT
THE COMPLETION OF EACH WORK DAY, CLEAN THE ENTIRE WORK AREA AND LEAVE IN
A NEAT CONDITION FREE OF DEBRIS AND RUBBISH.
11 STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, TELECOMMUNICATION, AND
CIVIL DOCUMENTS PROVIDE ADDITIONAL DEMOLITION REQUIREMENTS. THE
CONTRACTOR IS RESPONSIBLE FOR ALL DOCUMENTS THAT MAY PROVIDE ADDITIONAL
DEMOLITION REQUIREMENTS BEYOND THOSE SPECIFICALLY INDICATED ON THE
ARCHITECTURAL DEMOLITION PLANS.
12 THROUGHOUT THE COURSE OF DEMOLITION ACTIVITIES, PATCH, REPAIR AND
PREPARE EXISTING EXPOSED SURFACES AND/OR ADJACENT MATERIAL AS REQUIRED
TO RECEIVE NEW FINISHES.
13 CAREFULLY REMOVE AND DELIVER TO THE OWNER ANY EXISTING FIRE
EXTINGUISHERS OR OTHER IDENTIFIED ITEMS FOUND WITHIN THE LIMIT OF
DEMOLITION ACTIVITIES.
14 THE OWNER RESERVES THE RIGHT TO REMOVE ITEMS SCHEDULED FOR DEMOLITION
PRIOR TO THE START OF DEMOLITION ACTIVITIES AND MAY CLAIM ANY ITEMS
REMOVED BY THE CONTRACTOR THROUGHOUT THE COURSE OF DEMOLITION.
15 ALL CEILINGS FROM THE FIRST FLOOR THROUGH THE SEVENTH TO BE REMOVED
ENTIRELY. THE MAJORITY OF THE CEILINGS ON THESE FLOORS IS ACT GRID AND
DRYWALL BULKHEADS. ALL ASSOCIATED LIGHT FIXTURES, DUCTWORK, VENTS,
GRILLES AND CEILING MOUNTED ITEMS TO BE REMOVED. FOR DEMOLITION OF THE
BASEMENT LEVEL, REFER TO THE PARTIAL DEMO PLANS KEYNOTES.
NO DATE REVISION
1 02/12/2025 BID ADDENDUM
| Sheets |
| AD101 - OVERALL FIRST FLOOR DEMOLITION PLAN |
File details come from the government source that posted it. Updated .