About this file

This is a demolition plan drawing showing the first floor layout of the Sheridan Building at the Armed Forces Retirement Home in Washington DC, with detailed general demolition notes. The drawing, created by AE Works and dated February 2025, shows a large H-shaped residential building floor plan with multiple residential units, corridors, common areas, and support spaces like laundry rooms, tub rooms, and mechanical spaces.

The demolition notes specify that all ceilings from the first through seventh floors are to be removed entirely, including ACT grid, drywall bulkheads, light fixtures, ductwork, vents, grilles and ceiling-mounted items. The contractor must verify existing conditions, coordinate demolition with new construction, provide dust-proof barriers, maintain building operations during work, and protect existing construction scheduled to remain. The notes emphasize proper disposal of materials, daily cleanup requirements, and the owner's right to remove or claim items prior to demolition. The drawing scale is 1/16" = 1'-0" and includes room numbers and labels for all spaces on the first floor.

View the file

Other files

File Type Posted
Amendment 0006 Solicitation 47PM0325R0002 2025 03 25.pdf PDF
Amendment 0005 RFI Responses 150 - 336 2025 03 18.pdf PDF
Amendment 0005 Solicitation 47PM0325R0002 2025 03 18 (2).pdf PDF
Amendment 0004 Solicitation 47PM0325R0002 2025 03 13.pdf PDF
H103 - CHILLER PLANT.pdf PDF
Amendment 0003 Technical Evaluation Factors-Best Value_ Trade Off 2025 03 04.pdf PDF
Amendment 0003 Solicitation 47PM0325R0002 2025 03 04.pdf PDF
A517 - EXTERIOR PLAN DETAILS.pdf PDF
A516 - EXTERIOR PLAN DETAILS.pdf PDF
087113 - Automatic Door Operator.pdf PDF
079500 - Exterior Expansion Control.pdf PDF
A427 - SPA ROOMS AND LAUNDRY ROOMS.pdf PDF
084113 - Aluminum-Framed Entrances and Storefronts.pdf PDF
A406 - CLINICAL AREAS- NURSE STATIONS - FIRST FLOOR.pdf PDF
AD100A - BASEMENT DEMOLITION PLAN A.pdf PDF
Amendment 0003 Solicitation_GC AFRH 2025 03 04.pdf PDF
236416 FL - Centrifugal Water Chillers- Addendum 3.pdf PDF
AI407 - TYPICAL ELEVATOR LOBBY FINISH PLANS AND ELEVATIONS (FLOORS 2-7).pdf PDF
107113 - Exterior Sun Control Devices.pdf PDF
088700 - Window Film.pdf PDF
AD100B - BASEMENT DEMOLITION PLAN B.pdf PDF
A405 - CLINICAL AREAS-NURSE STATIONS - FIRST FLOOR.pdf PDF
HD103 - CHILLER PLANT DEMO PLAN.pdf PDF
AI408 - TYPICAL NORTH- SOUTH ELEVATOR LOBBY FINISH PLANS (FLOORS 2-7).pdf PDF
A409 - ENLARGED TOILET ROOM PLANS AND ELEVATIONS.pdf PDF
087100 - Door Hardware.pdf PDF
101423.16 - Panel Signage.pdf PDF
A504 - EXTERIOR WALL SECTION DETAILS.pdf PDF
000110 Table of Contents.pdf PDF
H603 - HVAC DETAILS.pdf PDF
AFRH-Sheridan Pre-Bid Addendum 2-12-25.pdf PDF
081416 - Flush Wood Doors.pdf PDF
A601 - DOOR SCHEDULE TYPES DETAILS.pdf PDF
S542 - STRUCTURAL BALCONY ENCLOSURE DETAILS.pdf PDF
A560 - TYPICAL ROOF DETAILS.pdf PDF
A503 - EXTERIOR WALL SECTION DETAILS.pdf PDF
A602 - DOOR SCHEDULE TYPES DETAILS.pdf PDF
S521 - STRUCTURAL ANNEX FRAMING DETAILS.pdf PDF
095000 - Wood Panel Ceiling.pdf PDF
S552 - STRUCTURAL TRASH CHUTE GENERATOR ENCLSOURE BALCONY ENCLOSURE DETAILS.pdf PDF
Amendment 0003 RFI Responses 1-149 2025 03 04.pdf PDF
235700 FL - Heat Exchangers for HVAC.pdf PDF
S401 - STRUCTURAL ROOF FRAMING PARTIAL PLANS.pdf PDF
Amendment 0003 Solicitation 47PM0325R0002 2025 03 04.pdf PDF
H804 - CONTROL DIAGRAMS.pdf PDF
AEWLA22050. Geotechnical Report. 10142022.pdf PDF
A412 - ENLARGED RESIDENT ROOM SHOWERS.pdf PDF
089119 - Fixed Louvers.pdf PDF
A112B - SECOND FLOOR REFLECTED CEILING PLAN B.pdf PDF
AI406 - FIRST FLOOR TOILET ROOM FINISH PLANS AND ELEVATIONS.pdf PDF
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2N

2N

3N

3N

4N

4N

8 10 12

19 21 23

NN

MM

LL

KK

JJ

HH

GG

FF

EE

DD

CC

BB

AA

HNHN

GNGN

FNFN

ENEN

DNDN

CNCN

BNBN

ANAN

HS HS

GS GS

FS FS

ES ES

DS DS

CS CS

BS BS

AS AS

NSNN

1N

1N

29S

29S

30S

30S

31S

31S

32S

32S

15.5

15.5

16.5

16.5

A.5A.5

B.5B.5

C.5C.5

D.5D.5

E.5E.5

F.5F.5

G.6 G.6

P A

R T

B A

D

1B

P A

R T

A A

D

1A

17.5

17.5

5.3

5.3

LAUNDRY

ACTIVITY

CORRIDOR

VESTIBULE

ACTIVITY

HOUSE KEEPING

1-5

STAIRS

UNIT

UNIT

UNIT

UNIT

1-1

STAIRS

UNIT

TUB ROOM

UNIT

UNIT

UNIT

UNIT

UNIT

1-6

STAIRS

TUB ROOM

TOILET

LAUNDRY 1014

TOILET

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

1-2

STAIRS

UNIT

UNIT

UNIT

CORRIDOR

FIRE

LOBBY

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

1-3

STAIRS

UNIT

UNIT

UNIT

UNIT

CORRIDOR

ELEC.

VENDING

LOUNGE 1029

TUB ROOM

J.C.

BLDG. MGMT.

UNIT 1032

FACILITY

MAINTENANCE

UNIT

1-7

STAIRS

UNIT

GENERAL

PURPOSE

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

1-4

STAIRS 1413

UNIT

UNIT

UNIT

TUB ROOM

LAUNDRY

CORRIDOR

CORRIDOR

ELEVATOR LOBBY 1041

VESTIBULE

FIRE

STORAGE1002

GEN. PURPOSE

LOUNGE 1022

MECH. RM.

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

ELEC.

UNIT

TLT.

TUB RM.

ELEC.

CLT.

ELEC.

AD201 2

AD201

AD202

AD2022

A B

N

DATE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

CLIENT:

418 BEAVER STREET

SEWICKLEY, PA 15143

PH: 412.287.7333

www.aeworks.com

PROFESSIONAL:

COPYRIGHT 2024 BY AE WORKS LTD ALL RIGHTS RESERVED.

SUBMISSION:

CONSTRUCTION BID

DOCUMENTS

AE WORKS®

A u to d e s k D o c s

/A F

R H

-0

S h e ri d a n /A

F R

H -0

A R

C H

-2

.r v t

/1

/2

:5

:4

P

M

AD101

TW

DC

AFRH-033

OVERALL FIRST FLOOR

DEMOLITION PLAN

AFRH SHERIDAN

RENOVATION

140 ROCK CREEK

CHURCH ROAD,

NORTHWEST,

WASHINGTON, DC

ARMED FORCES

RETIREMENT HOME -

WASHINGTON D.C.

11/13/24

1/16" = 1'-0"

OVERALL FIRST FLOOR DEMOLITION PLAN

GENERAL DEMOLITION NOTES

1 VERIFY ALL EXISTING CONDITIONS AND COORDINATE ALL DEMOLITION ACTIVITIES

WITH ANY NEW CONSTRUCTION AS INDICATED WITHIN THE CONSTRUCTION

DOCUMENTS. DO NOT SCALE DRAWINGS.

2 PERFORM ALL NECESSARY DEMOLITION ACTIVITIES AS REQUIRED FOR INSTALLATION

OF NEW CONSTRUCTION AS INDICATED WITHIN THE CONSTRUCTION DOCUMENTS.

COORDINATE WITH THOSE DOCUMENTS FOR EXACT DIMENSIONS AND LOCATIONS OF

FINISHED WORK.

3 ALL DEMOLITION NOT SPECIFICALLY INDICATED, BUT NECESSARY TO COMPLETE THE

PROJECT AS INDICATED ON THE CONSTRUCTION DOCUMENTS, TO BE THE

RESPONSIBILITY OF THE CONTRACTOR.

4 INSPECT AND ACCESS EACH SPACE AND FULFILL THE INTENT OF THE WORK

REQUIRED BY THE CONTRACT DOCUMENTS. DEVIATIONS REQUIRED BY EXISTING

FIELD CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR

TO PROCEEDING WITH THE WORK.

5 ANY CUTTING AND REMOVAL INDICATED ON THE CONSTRUCTION DOCUMENTS ARE

GENERAL INDICATIONS ONLY AND MAY NOT NECESSARILY SHOW THE FULL EXTENT

OF CUTTING AND REMOVAL NECESSARY.

6 THROUGHOUT THE COURSE OF DEMOLITION ACTIVITIES, PROPERLY PROTECT AND

EXISTING CONSTRUCTION INDICATED TO REMAIN. EXCERCISE CARE WHEN REMOVING

ADJACENT CONSTRUCTION AND PROPERLY REPAIR (TO ORIGINAL CONDITION) ANY

AREAS SCHEDULED TO REMAIN THAT SUSTAIN DAMAGE AS A RESULT OF DEMOLITION

ACTIVITIES.

7 CONSTRUCT DUST PROOF PROTECTIVE BARRIERS AS NECESSARY AT AREAS OF

INTERIOR DEMOLITION TO PROTECT EXISTING CONSTRUCTION AND EQUIPMENT

SCHEDULED TO REMAIN.

8 PERFORM ALL WORK REQUIRED TO PROTECT BUILDING OCCUPANTS AND EXISTING

BUILDING UTILITIES. THE BUILDING WILL REMAIN IN OPERATION THROUGHOUT THE

COURSE OF DEMOLITION AND CONSTRUCTION ACTIVITIES.

9 PROVIDE ALL NECESSARY TEMPORARY BRACING AND SHORING AS REQUIRED TO

MAINTAIN THE INTEGRITY AND STRUCTURAL STABILITY OF THE BUILDING AND ITS

INDIVIDUAL ELEMENTS.

10 EXCEPT AS NOTED OTHERWISE, REMOVE ALL DEMOLISHED MATERIALS FROM THE

SITE AND DISPOSE OF IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL LAW

REGULATIONS. DO NOT BURN, BURY OR SELL MATERIALS ON THE PROJECT SITE. AT

THE COMPLETION OF EACH WORK DAY, CLEAN THE ENTIRE WORK AREA AND LEAVE IN

A NEAT CONDITION FREE OF DEBRIS AND RUBBISH.

11 STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, TELECOMMUNICATION, AND

CIVIL DOCUMENTS PROVIDE ADDITIONAL DEMOLITION REQUIREMENTS. THE

CONTRACTOR IS RESPONSIBLE FOR ALL DOCUMENTS THAT MAY PROVIDE ADDITIONAL

DEMOLITION REQUIREMENTS BEYOND THOSE SPECIFICALLY INDICATED ON THE

ARCHITECTURAL DEMOLITION PLANS.

12 THROUGHOUT THE COURSE OF DEMOLITION ACTIVITIES, PATCH, REPAIR AND

PREPARE EXISTING EXPOSED SURFACES AND/OR ADJACENT MATERIAL AS REQUIRED

TO RECEIVE NEW FINISHES.

13 CAREFULLY REMOVE AND DELIVER TO THE OWNER ANY EXISTING FIRE

EXTINGUISHERS OR OTHER IDENTIFIED ITEMS FOUND WITHIN THE LIMIT OF

DEMOLITION ACTIVITIES.

14 THE OWNER RESERVES THE RIGHT TO REMOVE ITEMS SCHEDULED FOR DEMOLITION

PRIOR TO THE START OF DEMOLITION ACTIVITIES AND MAY CLAIM ANY ITEMS

REMOVED BY THE CONTRACTOR THROUGHOUT THE COURSE OF DEMOLITION.

15 ALL CEILINGS FROM THE FIRST FLOOR THROUGH THE SEVENTH TO BE REMOVED

ENTIRELY. THE MAJORITY OF THE CEILINGS ON THESE FLOORS IS ACT GRID AND

DRYWALL BULKHEADS. ALL ASSOCIATED LIGHT FIXTURES, DUCTWORK, VENTS,

GRILLES AND CEILING MOUNTED ITEMS TO BE REMOVED. FOR DEMOLITION OF THE

BASEMENT LEVEL, REFER TO THE PARTIAL DEMO PLANS KEYNOTES.

NO DATE REVISION

1 02/12/2025 BID ADDENDUM

Sheets
AD101 - OVERALL FIRST FLOOR DEMOLITION PLAN

File details come from the government source that posted it. Updated .