About this file

This is a basement demolition plan drawing (AD100) for the Sheridan Building renovation project at the Armed Forces Retirement Home in Washington, DC. The drawing shows a detailed floor plan of the basement level with room numbers, labels, and dimensions, including spaces such as a post office, beauty salon, wood shop, hobby rooms, bowling alley, bank, thrift shop, mechanical rooms, and various storage areas.

The drawing includes 15 general demolition notes detailing contractor requirements, including verification of existing conditions, protection of remaining construction, dust control measures, and material disposal procedures. A key specification states that all ceilings from the first through seventh floors are to be removed entirely, including associated light fixtures, ductwork, vents, grilles and ceiling-mounted items. The drawing is dated February 18, 2025, was prepared by AE Works Ltd., and is part of the construction bid documents for project number AFRH-033. The drawing is drawn at a scale of 1/16" = 1'-0" and includes a recent bid addendum dated February 12, 2025.

View the file

Other files

File Type Posted
Amendment 0006 Solicitation 47PM0325R0002 2025 03 25.pdf PDF
Amendment 0005 RFI Responses 150 - 336 2025 03 18.pdf PDF
Amendment 0005 Solicitation 47PM0325R0002 2025 03 18 (2).pdf PDF
Amendment 0004 Solicitation 47PM0325R0002 2025 03 13.pdf PDF
H103 - CHILLER PLANT.pdf PDF
Amendment 0003 Technical Evaluation Factors-Best Value_ Trade Off 2025 03 04.pdf PDF
Amendment 0003 Solicitation 47PM0325R0002 2025 03 04.pdf PDF
A517 - EXTERIOR PLAN DETAILS.pdf PDF
A516 - EXTERIOR PLAN DETAILS.pdf PDF
087113 - Automatic Door Operator.pdf PDF
079500 - Exterior Expansion Control.pdf PDF
A427 - SPA ROOMS AND LAUNDRY ROOMS.pdf PDF
084113 - Aluminum-Framed Entrances and Storefronts.pdf PDF
A406 - CLINICAL AREAS- NURSE STATIONS - FIRST FLOOR.pdf PDF
AD100A - BASEMENT DEMOLITION PLAN A.pdf PDF
Amendment 0003 Solicitation_GC AFRH 2025 03 04.pdf PDF
236416 FL - Centrifugal Water Chillers- Addendum 3.pdf PDF
AI407 - TYPICAL ELEVATOR LOBBY FINISH PLANS AND ELEVATIONS (FLOORS 2-7).pdf PDF
107113 - Exterior Sun Control Devices.pdf PDF
088700 - Window Film.pdf PDF
AD100B - BASEMENT DEMOLITION PLAN B.pdf PDF
A405 - CLINICAL AREAS-NURSE STATIONS - FIRST FLOOR.pdf PDF
HD103 - CHILLER PLANT DEMO PLAN.pdf PDF
AI408 - TYPICAL NORTH- SOUTH ELEVATOR LOBBY FINISH PLANS (FLOORS 2-7).pdf PDF
A409 - ENLARGED TOILET ROOM PLANS AND ELEVATIONS.pdf PDF
087100 - Door Hardware.pdf PDF
101423.16 - Panel Signage.pdf PDF
A504 - EXTERIOR WALL SECTION DETAILS.pdf PDF
000110 Table of Contents.pdf PDF
H603 - HVAC DETAILS.pdf PDF
AFRH-Sheridan Pre-Bid Addendum 2-12-25.pdf PDF
081416 - Flush Wood Doors.pdf PDF
A601 - DOOR SCHEDULE TYPES DETAILS.pdf PDF
S542 - STRUCTURAL BALCONY ENCLOSURE DETAILS.pdf PDF
A560 - TYPICAL ROOF DETAILS.pdf PDF
A503 - EXTERIOR WALL SECTION DETAILS.pdf PDF
A602 - DOOR SCHEDULE TYPES DETAILS.pdf PDF
S521 - STRUCTURAL ANNEX FRAMING DETAILS.pdf PDF
095000 - Wood Panel Ceiling.pdf PDF
S552 - STRUCTURAL TRASH CHUTE GENERATOR ENCLSOURE BALCONY ENCLOSURE DETAILS.pdf PDF
Amendment 0003 RFI Responses 1-149 2025 03 04.pdf PDF
235700 FL - Heat Exchangers for HVAC.pdf PDF
S401 - STRUCTURAL ROOF FRAMING PARTIAL PLANS.pdf PDF
Amendment 0003 Solicitation 47PM0325R0002 2025 03 04.pdf PDF
H804 - CONTROL DIAGRAMS.pdf PDF
AEWLA22050. Geotechnical Report. 10142022.pdf PDF
A412 - ENLARGED RESIDENT ROOM SHOWERS.pdf PDF
089119 - Fixed Louvers.pdf PDF
A112B - SECOND FLOOR REFLECTED CEILING PLAN B.pdf PDF
AI406 - FIRST FLOOR TOILET ROOM FINISH PLANS AND ELEVATIONS.pdf PDF
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

2N

2N

3N

3N

4N

4N 5 6 7 8 10 12

14 15 16 17 18

19 21 23 25 26 27

NN

MM

LL

KK

JJ

G

F

E

D

C

B

A

HN

GN

FN

EN

DN

CN

BN

AN

HS

FS

ES

DS

CS

BS

AS

NSNN

1N

1N

29S

29S

30S 31S

31S

32S

32S

13119 22

2215.5 16.5

6.2

A.5A.5

B.5B.5

C.5 C.5

D.5D.5

E.5E.5

F.5F.5

26.5

26.5248.8

G.6

24.2

H.1 H.1

P A

R T

B A

D

0B

P A

R T

A A

D

0A

5.5 17.5

27.85.3

P A

R T

B A

D

0B

P A

R T

A A

D

0A

CORRIDOR

G111D

POST OFFICE

G111

VESTIBULE

G111C

STAIRS

G-1

SORTING

G111B

POSTAL SERVICE

G111A

MECHANICAL

G110MECHANICAL

G107

WRAPPING RM

G105

ELEV EQUIP

G104

STOR

G106

BEAUTY SALON

G105A

STOR

G103

TOILET

G101 STORAGE

G102

CORRIDOR

G100

TRANSFORMER

ROOM

G001

LAUNDRY

G002

STAIRS

G-6

CORRIDOR

G003

MECHANICAL

G202

ELEC

G006

STORAGE

G004

WOMEN'S

G007

JC

G008

CORRIDOR

G209

RESIDENT

COMPUTER GAME

ROOM

G211A

WOOD SHOP

G211

HOBBY ROOM

G206

FAN ROOM

G207

HOBBY ROOM

G205

WOOD SHOP

G210

PAINT ROOM

G213

STAIRS

G-2

WOOD SHOP

G208

STOR

G010

CORRIDOR

G011

STOR

G302

STOR

G304

CORRIDOR

G315

JC

G306

EQUIP

G308

OFFICE

G312

STOR

G316

ELEC

G316A

MECHANICAL

G314

SAUNA

G311

SAUNA

G305

WOMEN'S

LOCKERS

G310

TOILETS

G309

TOILETS

G307

MEN'S LOCKERS

G303

STORAGE

G301

BANK

G014

ELEVATOR LOBBY

G013

MECHANICAL

G323

OFFICE

G322AVESTIBULE

G322

JC

G321

CANTEEN

G317

THRIFT SHOP

G324A

FAN ROOM

G320

STAIRS

G-3

MEN'S

G015 JC

G017

PHONE BOOTH

G016

CORRIDOR

G024

TRASH ROOM

G021

STAIRS

G-7

TRANSFORMER

ROOM

G023

MECHANICAL

G022

FIRE PUMP RM

G020

STORAGE

G023

STORAGE

G018

STORAGE

G012A

MECHANICAL

G405

ELECTRICAL

G403

MECHANICAL

G404

KILN ROOM

G408

OFFICE

G411

CERAMICS ROOM

G409

TOILET

G410

ELEVATOR LOBBY

G026

CORRIDOR

G401

STORAGE

G407

CORRIDOR

G029

ELEV RM

G028

SERVICE

CORRIDOR

G030

STAIRS

G-4

STEAM TUNNEL

G031

CORRIDOR

G005

STORAGE

G012

VESTIBULE

G007A

VESTIBULE

G015A

CORRIDOR

G019

STAIRS

G-5

DEMARC

G022A

G315C

OFFICE

G315D

CONF/BREAK

G315B

OFFICE

G315A

OFFICE/STORAGE

G315

FACILITY

MAINTENANCE

AREA

G201

BOWLING ALLEY

G201A

PIN SETTING

G326

SUPPLY

G325

SUPPLYG329

FREEZER

G330

SUPPLY

G328

SUPPLY

G327

TOILET

G324B

MECHANICAL

G324

P/X STORE

AD202

AD2022

AD201 2

AD201

TO

SCOTT

BLDG

SEE CS-SERIES

AND MECH

HD107

14' - 10"

15' - 6"

A B

N

DATE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

CLIENT:

418 BEAVER STREET

SEWICKLEY, PA 15143

PH: 412.287.7333

www.aeworks.com

PROFESSIONAL:

COPYRIGHT 2024 BY AE WORKS LTD ALL RIGHTS RESERVED.

SUBMISSION:

CONSTRUCTION BID

DOCUMENTS

AE WORKS®

A u to d e s k D o c s

/A F

R H

-0

S h e ri d a n /A

F R

H -0

A R

C H

-2

.r v t

/1

/2

:5

:2

P

M

AD100

TW

DC

AFRH-033

OVERALL BASEMENT

DEMOLITION PLAN

AFRH SHERIDAN

RENOVATION

140 ROCK CREEK

CHURCH ROAD,

NORTHWEST,

WASHINGTON, DC

ARMED FORCES

RETIREMENT HOME -

WASHINGTON D.C.

11/13/24

1/16" = 1'-0"

OVERALL BASEMENT DEMOLITION PLAN

GENERAL DEMOLITION NOTES

1 VERIFY ALL EXISTING CONDITIONS AND COORDINATE ALL DEMOLITION ACTIVITIES

WITH ANY NEW CONSTRUCTION AS INDICATED WITHIN THE CONSTRUCTION

DOCUMENTS. DO NOT SCALE DRAWINGS.

2 PERFORM ALL NECESSARY DEMOLITION ACTIVITIES AS REQUIRED FOR INSTALLATION

OF NEW CONSTRUCTION AS INDICATED WITHIN THE CONSTRUCTION DOCUMENTS.

COORDINATE WITH THOSE DOCUMENTS FOR EXACT DIMENSIONS AND LOCATIONS OF

FINISHED WORK.

3 ALL DEMOLITION NOT SPECIFICALLY INDICATED, BUT NECESSARY TO COMPLETE THE

PROJECT AS INDICATED ON THE CONSTRUCTION DOCUMENTS, TO BE THE

RESPONSIBILITY OF THE CONTRACTOR.

4 INSPECT AND ACCESS EACH SPACE AND FULFILL THE INTENT OF THE WORK

REQUIRED BY THE CONTRACT DOCUMENTS. DEVIATIONS REQUIRED BY EXISTING

FIELD CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR

TO PROCEEDING WITH THE WORK.

5 ANY CUTTING AND REMOVAL INDICATED ON THE CONSTRUCTION DOCUMENTS ARE

GENERAL INDICATIONS ONLY AND MAY NOT NECESSARILY SHOW THE FULL EXTENT

OF CUTTING AND REMOVAL NECESSARY.

6 THROUGHOUT THE COURSE OF DEMOLITION ACTIVITIES, PROPERLY PROTECT AND

EXISTING CONSTRUCTION INDICATED TO REMAIN. EXCERCISE CARE WHEN REMOVING

ADJACENT CONSTRUCTION AND PROPERLY REPAIR (TO ORIGINAL CONDITION) ANY

AREAS SCHEDULED TO REMAIN THAT SUSTAIN DAMAGE AS A RESULT OF DEMOLITION

ACTIVITIES.

7 CONSTRUCT DUST PROOF PROTECTIVE BARRIERS AS NECESSARY AT AREAS OF

INTERIOR DEMOLITION TO PROTECT EXISTING CONSTRUCTION AND EQUIPMENT

SCHEDULED TO REMAIN.

8 PERFORM ALL WORK REQUIRED TO PROTECT BUILDING OCCUPANTS AND EXISTING

BUILDING UTILITIES. THE BUILDING WILL REMAIN IN OPERATION THROUGHOUT THE

COURSE OF DEMOLITION AND CONSTRUCTION ACTIVITIES.

9 PROVIDE ALL NECESSARY TEMPORARY BRACING AND SHORING AS REQUIRED TO

MAINTAIN THE INTEGRITY AND STRUCTURAL STABILITY OF THE BUILDING AND ITS

INDIVIDUAL ELEMENTS.

10 EXCEPT AS NOTED OTHERWISE, REMOVE ALL DEMOLISHED MATERIALS FROM THE

SITE AND DISPOSE OF IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL LAW

REGULATIONS. DO NOT BURN, BURY OR SELL MATERIALS ON THE PROJECT SITE. AT

THE COMPLETION OF EACH WORK DAY, CLEAN THE ENTIRE WORK AREA AND LEAVE IN

A NEAT CONDITION FREE OF DEBRIS AND RUBBISH.

11 STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, TELECOMMUNICATION, AND

CIVIL DOCUMENTS PROVIDE ADDITIONAL DEMOLITION REQUIREMENTS. THE

CONTRACTOR IS RESPONSIBLE FOR ALL DOCUMENTS THAT MAY PROVIDE ADDITIONAL

DEMOLITION REQUIREMENTS BEYOND THOSE SPECIFICALLY INDICATED ON THE

ARCHITECTURAL DEMOLITION PLANS.

12 THROUGHOUT THE COURSE OF DEMOLITION ACTIVITIES, PATCH, REPAIR AND

PREPARE EXISTING EXPOSED SURFACES AND/OR ADJACENT MATERIAL AS REQUIRED

TO RECEIVE NEW FINISHES.

13 CAREFULLY REMOVE AND DELIVER TO THE OWNER ANY EXISTING FIRE

EXTINGUISHERS OR OTHER IDENTIFIED ITEMS FOUND WITHIN THE LIMIT OF

DEMOLITION ACTIVITIES.

14 THE OWNER RESERVES THE RIGHT TO REMOVE ITEMS SCHEDULED FOR DEMOLITION

PRIOR TO THE START OF DEMOLITION ACTIVITIES AND MAY CLAIM ANY ITEMS

REMOVED BY THE CONTRACTOR THROUGHOUT THE COURSE OF DEMOLITION.

15 ALL CEILINGS FROM THE FIRST FLOOR THROUGH THE SEVENTH TO BE REMOVED

ENTIRELY. THE MAJORITY OF THE CEILINGS ON THESE FLOORS IS ACT GRID AND

DRYWALL BULKHEADS. ALL ASSOCIATED LIGHT FIXTURES, DUCTWORK, VENTS,

GRILLES AND CEILING MOUNTED ITEMS TO BE REMOVED. FOR DEMOLITION OF THE

BASEMENT LEVEL, REFER TO THE PARTIAL DEMO PLANS KEYNOTES.

NO DATE REVISION

1 02/12/2025 BID ADDENDUM

Sheets
AD100 - OVERALL BASEMENT DEMOLITION PLAN

File details come from the government source that posted it. Updated .