AD100 - OVERALL BASEMENT DEMOLITION PLAN.pdf
PDF 555 KB Posted
- Solicitation number
- 47PM0325R0002
About this file
This is a basement demolition plan drawing (AD100) for the Sheridan Building renovation project at the Armed Forces Retirement Home in Washington, DC. The drawing shows a detailed floor plan of the basement level with room numbers, labels, and dimensions, including spaces such as a post office, beauty salon, wood shop, hobby rooms, bowling alley, bank, thrift shop, mechanical rooms, and various storage areas.
The drawing includes 15 general demolition notes detailing contractor requirements, including verification of existing conditions, protection of remaining construction, dust control measures, and material disposal procedures. A key specification states that all ceilings from the first through seventh floors are to be removed entirely, including associated light fixtures, ductwork, vents, grilles and ceiling-mounted items. The drawing is dated February 18, 2025, was prepared by AE Works Ltd., and is part of the construction bid documents for project number AFRH-033. The drawing is drawn at a scale of 1/16" = 1'-0" and includes a recent bid addendum dated February 12, 2025.
View the file
Other files
Show 40 more
Latest 50 of 90 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
2N
2N
3N
3N
4N
4N 5 6 7 8 10 12
14 15 16 17 18
19 21 23 25 26 27
NN
MM
LL
KK
JJ
G
F
E
D
C
B
A
HN
GN
FN
EN
DN
CN
BN
AN
HS
FS
ES
DS
CS
BS
AS
NSNN
1N
1N
29S
29S
30S 31S
31S
32S
32S
13119 22
2215.5 16.5
6.2
A.5A.5
B.5B.5
C.5 C.5
D.5D.5
E.5E.5
F.5F.5
26.5
26.5248.8
G.6
24.2
H.1 H.1
P A
R T
B A
D
0B
P A
R T
A A
D
0A
5.5 17.5
27.85.3
P A
R T
B A
D
0B
P A
R T
A A
D
0A
CORRIDOR
G111D
POST OFFICE
G111
VESTIBULE
G111C
STAIRS
G-1
SORTING
G111B
POSTAL SERVICE
G111A
MECHANICAL
G110MECHANICAL
G107
WRAPPING RM
G105
ELEV EQUIP
G104
STOR
G106
BEAUTY SALON
G105A
STOR
G103
TOILET
G101 STORAGE
G102
CORRIDOR
G100
TRANSFORMER
ROOM
G001
LAUNDRY
G002
STAIRS
G-6
CORRIDOR
G003
MECHANICAL
G202
ELEC
G006
STORAGE
G004
WOMEN'S
G007
JC
G008
CORRIDOR
G209
RESIDENT
COMPUTER GAME
ROOM
G211A
WOOD SHOP
G211
HOBBY ROOM
G206
FAN ROOM
G207
HOBBY ROOM
G205
WOOD SHOP
G210
PAINT ROOM
G213
STAIRS
G-2
WOOD SHOP
G208
STOR
G010
CORRIDOR
G011
STOR
G302
STOR
G304
CORRIDOR
G315
JC
G306
EQUIP
G308
OFFICE
G312
STOR
G316
ELEC
G316A
MECHANICAL
G314
SAUNA
G311
SAUNA
G305
WOMEN'S
LOCKERS
G310
TOILETS
G309
TOILETS
G307
MEN'S LOCKERS
G303
STORAGE
G301
BANK
G014
ELEVATOR LOBBY
G013
MECHANICAL
G323
OFFICE
G322AVESTIBULE
G322
JC
G321
CANTEEN
G317
THRIFT SHOP
G324A
FAN ROOM
G320
STAIRS
G-3
MEN'S
G015 JC
G017
PHONE BOOTH
G016
CORRIDOR
G024
TRASH ROOM
G021
STAIRS
G-7
TRANSFORMER
ROOM
G023
MECHANICAL
G022
FIRE PUMP RM
G020
STORAGE
G023
STORAGE
G018
STORAGE
G012A
MECHANICAL
G405
ELECTRICAL
G403
MECHANICAL
G404
KILN ROOM
G408
OFFICE
G411
CERAMICS ROOM
G409
TOILET
G410
ELEVATOR LOBBY
G026
CORRIDOR
G401
STORAGE
G407
CORRIDOR
G029
ELEV RM
G028
SERVICE
CORRIDOR
G030
STAIRS
G-4
STEAM TUNNEL
G031
CORRIDOR
G005
STORAGE
G012
VESTIBULE
G007A
VESTIBULE
G015A
CORRIDOR
G019
STAIRS
G-5
DEMARC
G022A
G315C
OFFICE
G315D
CONF/BREAK
G315B
OFFICE
G315A
OFFICE/STORAGE
G315
FACILITY
MAINTENANCE
AREA
G201
BOWLING ALLEY
G201A
PIN SETTING
G326
SUPPLY
G325
SUPPLYG329
FREEZER
G330
SUPPLY
G328
SUPPLY
G327
TOILET
G324B
MECHANICAL
G324
P/X STORE
AD202
AD2022
AD201 2
AD201
TO
SCOTT
BLDG
SEE CS-SERIES
AND MECH
HD107
14' - 10"
15' - 6"
A B
N
DATE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DRAWING NO:
DRAWING TITLE:
PROJECT NAME:
CLIENT:
418 BEAVER STREET
SEWICKLEY, PA 15143
PH: 412.287.7333
www.aeworks.com
PROFESSIONAL:
COPYRIGHT 2024 BY AE WORKS LTD ALL RIGHTS RESERVED.
SUBMISSION:
CONSTRUCTION BID
DOCUMENTS
AE WORKS®
A u to d e s k D o c s
/A F
R H
-0
S h e ri d a n /A
F R
H -0
A R
C H
-2
.r v t
/1
/2
:5
:2
P
M
AD100
TW
DC
AFRH-033
OVERALL BASEMENT
DEMOLITION PLAN
AFRH SHERIDAN
RENOVATION
140 ROCK CREEK
CHURCH ROAD,
NORTHWEST,
WASHINGTON, DC
ARMED FORCES
RETIREMENT HOME -
WASHINGTON D.C.
11/13/24
1/16" = 1'-0"
OVERALL BASEMENT DEMOLITION PLAN
GENERAL DEMOLITION NOTES
1 VERIFY ALL EXISTING CONDITIONS AND COORDINATE ALL DEMOLITION ACTIVITIES
WITH ANY NEW CONSTRUCTION AS INDICATED WITHIN THE CONSTRUCTION
DOCUMENTS. DO NOT SCALE DRAWINGS.
2 PERFORM ALL NECESSARY DEMOLITION ACTIVITIES AS REQUIRED FOR INSTALLATION
OF NEW CONSTRUCTION AS INDICATED WITHIN THE CONSTRUCTION DOCUMENTS.
COORDINATE WITH THOSE DOCUMENTS FOR EXACT DIMENSIONS AND LOCATIONS OF
FINISHED WORK.
3 ALL DEMOLITION NOT SPECIFICALLY INDICATED, BUT NECESSARY TO COMPLETE THE
PROJECT AS INDICATED ON THE CONSTRUCTION DOCUMENTS, TO BE THE
RESPONSIBILITY OF THE CONTRACTOR.
4 INSPECT AND ACCESS EACH SPACE AND FULFILL THE INTENT OF THE WORK
REQUIRED BY THE CONTRACT DOCUMENTS. DEVIATIONS REQUIRED BY EXISTING
FIELD CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR
TO PROCEEDING WITH THE WORK.
5 ANY CUTTING AND REMOVAL INDICATED ON THE CONSTRUCTION DOCUMENTS ARE
GENERAL INDICATIONS ONLY AND MAY NOT NECESSARILY SHOW THE FULL EXTENT
OF CUTTING AND REMOVAL NECESSARY.
6 THROUGHOUT THE COURSE OF DEMOLITION ACTIVITIES, PROPERLY PROTECT AND
EXISTING CONSTRUCTION INDICATED TO REMAIN. EXCERCISE CARE WHEN REMOVING
ADJACENT CONSTRUCTION AND PROPERLY REPAIR (TO ORIGINAL CONDITION) ANY
AREAS SCHEDULED TO REMAIN THAT SUSTAIN DAMAGE AS A RESULT OF DEMOLITION
ACTIVITIES.
7 CONSTRUCT DUST PROOF PROTECTIVE BARRIERS AS NECESSARY AT AREAS OF
INTERIOR DEMOLITION TO PROTECT EXISTING CONSTRUCTION AND EQUIPMENT
SCHEDULED TO REMAIN.
8 PERFORM ALL WORK REQUIRED TO PROTECT BUILDING OCCUPANTS AND EXISTING
BUILDING UTILITIES. THE BUILDING WILL REMAIN IN OPERATION THROUGHOUT THE
COURSE OF DEMOLITION AND CONSTRUCTION ACTIVITIES.
9 PROVIDE ALL NECESSARY TEMPORARY BRACING AND SHORING AS REQUIRED TO
MAINTAIN THE INTEGRITY AND STRUCTURAL STABILITY OF THE BUILDING AND ITS
INDIVIDUAL ELEMENTS.
10 EXCEPT AS NOTED OTHERWISE, REMOVE ALL DEMOLISHED MATERIALS FROM THE
SITE AND DISPOSE OF IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL LAW
REGULATIONS. DO NOT BURN, BURY OR SELL MATERIALS ON THE PROJECT SITE. AT
THE COMPLETION OF EACH WORK DAY, CLEAN THE ENTIRE WORK AREA AND LEAVE IN
A NEAT CONDITION FREE OF DEBRIS AND RUBBISH.
11 STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, TELECOMMUNICATION, AND
CIVIL DOCUMENTS PROVIDE ADDITIONAL DEMOLITION REQUIREMENTS. THE
CONTRACTOR IS RESPONSIBLE FOR ALL DOCUMENTS THAT MAY PROVIDE ADDITIONAL
DEMOLITION REQUIREMENTS BEYOND THOSE SPECIFICALLY INDICATED ON THE
ARCHITECTURAL DEMOLITION PLANS.
12 THROUGHOUT THE COURSE OF DEMOLITION ACTIVITIES, PATCH, REPAIR AND
PREPARE EXISTING EXPOSED SURFACES AND/OR ADJACENT MATERIAL AS REQUIRED
TO RECEIVE NEW FINISHES.
13 CAREFULLY REMOVE AND DELIVER TO THE OWNER ANY EXISTING FIRE
EXTINGUISHERS OR OTHER IDENTIFIED ITEMS FOUND WITHIN THE LIMIT OF
DEMOLITION ACTIVITIES.
14 THE OWNER RESERVES THE RIGHT TO REMOVE ITEMS SCHEDULED FOR DEMOLITION
PRIOR TO THE START OF DEMOLITION ACTIVITIES AND MAY CLAIM ANY ITEMS
REMOVED BY THE CONTRACTOR THROUGHOUT THE COURSE OF DEMOLITION.
15 ALL CEILINGS FROM THE FIRST FLOOR THROUGH THE SEVENTH TO BE REMOVED
ENTIRELY. THE MAJORITY OF THE CEILINGS ON THESE FLOORS IS ACT GRID AND
DRYWALL BULKHEADS. ALL ASSOCIATED LIGHT FIXTURES, DUCTWORK, VENTS,
GRILLES AND CEILING MOUNTED ITEMS TO BE REMOVED. FOR DEMOLITION OF THE
BASEMENT LEVEL, REFER TO THE PARTIAL DEMO PLANS KEYNOTES.
NO DATE REVISION
1 02/12/2025 BID ADDENDUM
| Sheets |
| AD100 - OVERALL BASEMENT DEMOLITION PLAN |
File details come from the government source that posted it. Updated .