A102 - OVERALL SECOND FLOOR PLAN.pdf
PDF 1 MB Posted
- Solicitation number
- 47PM0325R0002
About this file
This is an architectural floor plan drawing (A102) showing the overall second floor layout for the Armed Forces Retirement Home Sheridan Building renovation project in Washington, DC. The drawing, dated November 13, 2024, was created by AE Works and shows detailed room layouts, dimensions, and unit configurations for residential living spaces.
The floor plan includes multiple types of residential units ranging from 350-800 square feet, including Unit Types A1-A3, C1-C2, D1-D9, and E1. The layout features common areas such as elevator lobbies, stairwells, laundry rooms, lounges, and utility spaces. The plan includes general construction notes regarding partition types, blocking requirements, and moisture protection specifications. The drawing provides comprehensive measurements, room numbers, and designations for ADA-compliant units. A resident room type schedule details the specific unit configurations across floors 2-7, including room numbers, descriptions, dwelling types, size ranges, and references to enlarged detail plans.
View the file
Other files
Show 40 more
Latest 50 of 90 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2N
2N
3N
3N
4N
4N 5 6 7 8 10 12
14 15 16 17 18
19 21 23 25 26 27 28
NN
MM
LL
K
JJ
H
H
GG
FF
EE
DD
CC
BB
AA
HN
GN
FN
EN
DN
CN
BN
AN
HS
GS
FS
ES
DS
CS
BS
AS
NSNN
KN
1N
1N
29S
29S
30S 31S
31S
32S
32S
9 22
15.5 16.5
P P
Q Q
A210 1
A2112
A211
D.5D.5
2415.6
CORRIDOR
UNIT E1
UNIT D9
STAIRS
2-5
ELEVATOR LOBBY
ELEC
JANITOR
UNIT A2
UNIT A2
UNIT A2
UNIT A2
STAIRS
2-1
UNIT A1
LAUNDRY
UNIT D8
TRASH
CORRIDOR
UNIT E1
UNIT D9
UNIT A2 OPP
UNIT A2 OPP
UNIT A2 OPP
UNIT A2 OPP
UNIT D8
UNIT A1
LAUNDRY
TRASH
JANITOR
ELEVATOR LOBBY
ELEC
STAIRS
2-4
UNIT A2 OPP
UNIT A2
UNIT D8
UNIT A2 OPP
UNIT C1
UNIT C2
UNIT D1
UNIT D1
LOUNGE
UNIT C2
UNIT C1
UNIT A2 OPP
2011 UNIT D8
UNIT A2
UNIT A2 OPP
ELEC.
TELECOM
ELEVATOR LOBBY
TELECOM
ELEC
STAIRS
2-6
STAIRS
2-7
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
STAIRS
2-2
UNIT D2
UNIT D7
UNIT D4 OPP
UNIT D4
UNIT D5
LAUNDRY
UNIT D6
UNIT D6 OPP
UNIT A3
CORRIDOR
UNIT D7
UNIT D2
UNIT D3 OPP
UNIT D3
UNIT D4
UNIT D4 OPP
UNIT D5 OPP
LAUNDRY
STAIRS
2-3
UNIT D6
2307 UNIT D6 OPP
UNIT A3
CORRIDOR
CORRIDOR
A301
A301
A301
A302
A302
P A
R T
B
A B
P A
R T
A
A A
VESTIBULE
17.5
17.6 20
D.6D.6
E.6E.6
F.6F.6
G.3G.3
UNIT D3 OPP
TLT
2414A
A210
16' - 8" 16' - 8"
/8
/8
5" 42' - 4" 295' - 10" 42' - 4" 5"
/2
381' - 4"
395' - 4"
/2
7' - 0" 50' - 9 3/8" 51' - 0 1/4" 8' - 1 3/8" 42' - 8" 8' - 1 3/8"
6' - 6 5/8" 46' - 10" 6' - 6 5/8"
8' - 1 3/8" 42' - 8" 59' - 1 5/8" 50' - 9 3/8" 7' - 0"
/8
/2
/8
/8
"UNIT D3
SPA
ROOF TYPE
R3. SEE A560
ROOF TYPE
R5. SEE A560
ROOF TYPE
R5. SEE A560
A B
N
DATE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DRAWING NO:
DRAWING TITLE:
PROJECT NAME:
CLIENT:
418 BEAVER STREET
SEWICKLEY, PA 15143
PH: 412.287.7333
www.aeworks.com
PROFESSIONAL:
COPYRIGHT 2024 BY AE WORKS LTD ALL RIGHTS RESERVED.
SUBMISSION:
CONSTRUCTION BID
DOCUMENTS
AE WORKS®
A u to d e s k D o c s
/A F
R H
-0
S h e ri d a n /A
F R
H -0
A R
C H
-2
.r v t
/1
/2
:3
:5
P
M
A102
AC
RS
AFRH-033
OVERALL SECOND
FLOOR PLAN
AFRH SHERIDAN
RENOVATION
140 ROCK CREEK
CHURCH ROAD,
NORTHWEST,
WASHINGTON, DC
ARMED FORCES
RETIREMENT HOME -
WASHINGTON D.C.
11/13/24
1/16" = 1'-0"
OVERALL SECOND FLOOR PLAN
GENERAL CONSTRUCTION NOTES
1. PARTITION TYPES: UNLESS OTHERWISE NOTED, NEW PARTITIONS SHALL BE TYPE A3.
AT EXISTING COLUMNS AND PERIMETER NEW PARTITIONS SHALL BE D3 UNLESS NOTED
OTHERWISE.
2. CONTRACTOR TO COORDINATE ALL BLOCKING FOR CASEWORK , ACCESSORIES, ETC.
3. PROVIDE ADEQUATE BACKUP AND BLOCKING FOR ALL WALL OR CEILING MOUNTED
EQUIPMENT, ARCHITECTURAL WOODWORK, HANDRAILS, LIGHTING, OR OTHER
MISCELLANEOUS ITEMS AS SHOWN ON DRAWINGS.
4. REFER TO REFLECTED CEILING PLANS FOR THE CEILING TYPE AND HEIGHT.
COORDINATE HEIGHTS OF GYPSUM BOARD WITH CEILING HEIGHT AND WITH PARTITION
DETAILS SHOWN HERE.
5. REFER TO FINISH SCHEDULE, INTERIOR ELEVATIONS, AND ARCHITECTURAL
CASEWORK DETAILS FOR WALL FINISHES AND WALL MOUNTED ACCESSORIES TO
COORDINATE BLOCKING REQUIREMENTS.
6. AT CERAMIC TILE, INSTALL CEMENTITIOUS BACKER BOARD. SHIM BACKER BOARD AS
REQUIRED TO RESULT IN A FLUSH TRANSITION TO NON-BACKER BOARD.
7. IN TOILET ROOMS, PROVIDE MOISTURE RESISTANT GYPSUM BOARD ON ALL WALLS.
8. PARTITION THICKNESS DIMENSIONS AS SHOWN ARE MINIMUM NOMINAL DIMENSIONS.
ACTUAL DIMENSIONS MAY DIFFER SLIGHTLY TO SUIT FIELD CONDITIONS.
2-7 X101, X401 INDEPENDENT LIVING - UNIT E1 TYPE A 350-400 SF A425
2-7 X102, X402 INDEPENDENT LIVING - UNIT D9 TYPE A 450-500 SF A425
2-7 X003, X107, X012, X407 INDEPENDENT LIVING - UNIT D8 TYPE A 450-500 SF A424
2-7 X202,X301 INDEPENDENT LIVING - UNIT D7 TYPE A 450-500 SF A425
2-7 X208, X209, X307, X310 INDEPENDENT LIVING - UNIT D6 TYPE B 450-500 SF A424
2-7 X207, X308 INDEPENDENT LIVING - UNIT D5 TYPE B 450-500 SF A423
2-7 X205, X206, X305, X306 INDEPENDENT LIVING - UNIT D4 TYPE B 450-500 SF A423
2-7 X203, X204, X303, X304 INDEPENDENT LIVING - UNIT D3 TYPE B 450-500 SF A422
2-7 X201, X302 INDEPENDENT LIVING - ACCESSIBLE UNIT D2 TYPE A 450-500 SF A421
2-7 X007, X008 INDEPENDENT LIVING - UNIT D1 TYPE B 450-500 SF A422
2-7 X005, X009 INDEPENDENT LIVING - UNIT C2 TYPE B 550-600 SF A426
2-7 X006, X010 INDEPENDENT LIVING - UNIT C1 TYPE B 550-600 SF A426
2-7 X210, X309 INDEPENDENT LIVING - UNIT A3 TYPE B 750-800 SF A421
2-7 X001, X004, X011, X013 INDEPENDENT LIVING - UNIT A2 OPP DOOR TYPE B 650-700 SF A419
2-7
X002, X014, X103, X104, X105, X106, X403, X404, X405, X406 INDEPENDENT LIVING - UNIT A2 TYPE B 650-700 SF A419
2-7 X108, X408 INDEPENDENT LIVING - ACCESSIBLE UNIT A1 TYPE A 650-700 SF A420
FLOORS ROOM NUMBERS ROOM DESCRIPTION
ANSI 117.1 CH11
DWELLING TYPE SIZE RANGE 1/4" ENLARGED PLAN
RESIDENT ROOM TYPE SCHEDULE - FLOORS 2-7
NO DATE REVISION
1 02/12/2025 BID ADDENDUM
| Sheets |
| A102 - OVERALL SECOND FLOOR PLAN |
| A102B - SECOND FLOOR PLAN B |
| A112B - SECOND FLOOR REFLECTED CEILING PLAN B |
| A405 - CLINICAL AREAS/NURSE STATIONS - FIRST FLOOR |
| A406 - CLINICAL AREAS/ NURSE STATIONS - FIRST FLOOR |
| A407 - NORTH SERVERY |
| A408 - SOUTH SERVERY |
| A409 - ENLARGED TOILET ROOM PLANS AND ELEVATIONS |
| A412 - ENLARGED RESIDENT ROOM SHOWERS |
| A427 - SPA ROOMS AND LAUNDRY ROOMS |
| A601 - DOOR SCHEDULE, TYPES, DETAILS |
| A602 - DOOR SCHEDULE, TYPES, DETAILS |
| AI401 - ENTRANCE LOBBY FINISH PLAN AND ELEVATIONS |
| AI402 - FIRST FLOOR ELEVATOR LOBBY FINISH PLANS AND ELEVATIONS |
| AI403 - SERVERY FINISH PLAN AND ELEVATIONS |
| AI405 - FIRST FLOOR ENLARGED CORRIDOR PLANS AND ELEVATIONS |
| AI406 - FIRST FLOOR TOILET ROOM FINISH PLANS AND ELEVATIONS |
| AI408 - TYPICAL NORTH/ SOUTH ELEVATOR LOBBY FINISH PLANS (FLOORS 2-7) |
| AS-101 - FIRST FLOOR SIGNAGE PLAN |
| AS-102 - TYPICAL FLOOR SIGNAGE PLAN (FLOORS 2-7) |
File details come from the government source that posted it. Updated .