39 ACRONYMS AND DEFINITIONS.pdf

PDF 450 KB Posted

Attached to
TSA Gold+ COMMERCIAL SERVICES IDIQ CONTRACT SOLICITATION
Solicitation number
70T05026R5900N005
Issued by

About this file

This file is Attachment I containing acronyms and definitions for a Transportation Security Administration (TSA) federal contract opportunity related to airport security screening services. The document provides comprehensive reference material for understanding contract terminology and operational concepts specific to TSA screening programs.

The acronyms section defines over 100 terms relevant to TSA operations, including security technologies (Bottled Liquids Scanner, Explosive Detection System, Hand Held Metal Detector, Walk Through Metal Detector), personnel roles (Security Training Instructor, Transportation Security Officer, Supervisory Transportation Security Officer), and regulatory frameworks (Federal Acquisition Regulation, Homeland Security Acquisition Regulation, Aviation and Transportation Security Act). The definitions section clarifies key contract concepts including: Acceptable Quality Level (performance standards contractors must meet), Contract Performance Management Plan (TSA's monitoring oversight), Government Property (facilities and equipment provided to contractors), IDIO Program Manager (contractor's overall responsibility designee), Key Personnel (essential staff for contract execution), Kick-Off Meeting (post-award introduction to TSA personnel), On-boarding (new hire recruitment and assessment process), Operations Management Plan (contractor's processes and quality control procedures), Staffing Allocation Model (TSA's methodology for determining required screener numbers), and Transition (when contractor assumes screening operations responsibility). Additional definitions cover Performance Incentive Plans, Claims management procedures, SSI inventory protocols, and workforce succession strategies, establishing the operational framework for contractor management of checkpoint and baggage screening services at specific airports under task orders.

View the file

Other files

File Type Posted
70T05026R5900N005 Questions and Answers Set 7.pdf PDF
70T05026R5900N005 AMD 0003.pdf PDF
70T05026R5900N005 Questions and Answers Set 5.pdf PDF
70T05026R5900N005 Questions and Answers Set 4.pdf PDF
70T05026R5900N005 AMD 0001.pdf PDF
43 H RTM Template 5May21.pdf PDF
70T05026R5900N005 Questions and Answers Set 3.pdf PDF
70T05026R5900N005 Questions and Answers Set 2.pdf PDF
70T05026R5900N005 Questions and Answers Set 1.pdf PDF
Attachment 1 Performance Work Statement.pdf PDF
41 Gold Performance Metrics.xlsx XLSX spreadsheet
40 - DHS Form 700-23.pdf PDF
23 PGDS v8.0 Main.pdf PDF
1 Gold_CM Req_Attachment_4.13.26.pdf PDF
36 ESTIMATED CONSUMABLES LIST.pdf PDF
32 TSA MD1900.8, FINAL, 231025, eff231105.pdf PDF
38 SUITABILITY DETERMINATIONS.pdf PDF
2 L001 - Configuration Management Plan.pdf PDF
16 Attachment G - TSA Media Sanitization Certificate.pdf PDF
29 TSA MD 200.52, FINAL, 2, 160829.pdf PDF
13 Attachment D - TSE Database.pdf PDF
6 L005 - Request for Waiver.pdf PDF
42 Airport Task Order Summary - Sample.docx DOCX document
24 Attachment G - TSA T and E Guidebook Rev 6 - Final.pdf PDF
18 Attachment C - SSI Policies and Procedures Handbook.pdf PDF
33 TSA-RTWT-Requirements_Final_2026-04-27.pdf PDF
30 TSA MD 1000.15, FINAL, 221118, 508C.pdf PDF
10 Attachment A - Radiation Survey and Radioactive Leak Test Rec.pdf PDF
3 L002 - Master Configuration Item List.pdf PDF
8 L008 - Configuration Audit Plan.pdf PDF
70T05026R5900N005.pdf PDF
22 PGDS v8.0 Appendices.pdf PDF
19 Attachment D - ITAR_Terms-Conditions GOLD.pdf PDF
17 Gold_Maintenance Req_Attachment_4.13.26.pdf PDF
31 TSA MD 1900.18, FINAL, eff 24.12.04.pdf PDF
35 SAFETY ACT BLOCK DESIGNATION NOTICE.pdf PDF
11 Attachment B - TSE Metrics Terms and Definitions and RMA Metrics.pdf PDF
25 Attachment H - TSA Handbook 1100.73-2, FINAL, 201218.pdf PDF
27 OD-400-50-1-5H Reporting Customer Thruput-Wait_Times_111220_FINAL_sig.pdf PDF
28 TSA MD 200.51, FINAL, 171114.pdf PDF
5 L004 - Request for Deviation.pdf PDF
12 Attachment C - Failure Mode Indicator Codes.pdf PDF
21 checkpoint-requirements-and-planning-guide.pdf PDF
20.1 Attachment E - cap_acceptable_capability_list _R.pdf PDF
14 Attachment E -SLA Performance Metrics.pdf PDF
15 Attachment F - TSE RMA Metrics.pdf PDF
9 L009 - Configuration Audit Summary Report.pdf PDF
37 TRAINING REQUIREMENTS.pdf PDF
4 L003 - Engineering Change Proposal.pdf PDF
7 L007 - Configuration Status Accounting Report.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

https://www.acquisition.gov/ https://www.acquisition.gov/hsar

Attachment I

Kick-Off Meeting: (AKA: Post-Award Conference) The meeting held after award that serves to formally introduce the Contractor to key TSA Headquarters, Field and Airport personnel, provide the Contractor with the key materials to begin developing a screening workforce, open the lines of communications and discuss performance expectations.

On-boarding: The screener new hire process that includes recruiting, assessing, and EOD suitability determination. Training is considered a separate process from On-boarding.

Operations Management Plan: Inclusive of the Contractors program processes and procedures to manage the total work effort associated with the SOW, as described in section C.4.1. Also inclusive of the Contractors quality control processes to guide and document required management and quality control actions, including compliance with the CPMP, to achieve the contract specific results, as described in section C.4.1.2.1. Additionally inclusive of the Contractors training approach to coordinate the delivery and logistics of screener training according to TSA training requirements, as described in section C.5.1.

Passenger and Baggage Claims Plan: The Contractor’s plan to receive, manage, and address passenger claims related to the security screening process and baggage handling, as described the

SOW.

Performance Incentive Plan: An airport specific plan, if applicable to the contract, that identifies the process and criteria for awarding a monetary fee based on Contractor performance.

Performance Information Management System: The TSA web-based tool that supports performance and operational data reporting.

Performance Measurement Information System: The TSA web-based tool that supports performance and operational data collection and reporting.

Staffing Allocation Model: The Staffing Allocation Model (SAM) used by TSA to estimate the number of screeners required to staff the airport in accordance with TSA staffing and screening policies. It takes into consideration several factors such as: airport configuration, originating passenger load factors, equipment, training, administrative screening functions (i.e., screening related reporting), and personnel time off.

SSI Management Plan: The Contractor’s plan for the use and inventory of Sensitive Security Information (SSI).

Succession Strategy: Immediate and long-term strategy for the continued execution of the contract despite workforce changes.

Task Order: Task orders under this contract vehicle are initiated for Contractors to provide checkpoint and baggage screening services at a specific airport.

Transition: The milestone that occurs when the Transition phase requirements have been satisfied and the Contractor assumes responsibility for security screening operations.

Vetting: Term generally used to refer to the security review of individuals to determine eligibility to perform for TSA.

File details come from the government source that posted it. Updated .