10 Attachment A - Radiation Survey and Radioactive Leak Test Rec.pdf
PDF 100 KB Posted
- Solicitation number
- 70T05026R5900N005
About this file
This document is an attachment that serves as a template and submittal instruction guide for Radiation Survey (RS) and Radioactive Leak Test (RLT) records related to TSA equipment.
The attachment establishes the standardized format and procedures that OEMs and Maintenance Service Providers (MSPs) must follow when documenting completion of radiation surveys and radioactive leak tests on TSA equipment in compliance with federal regulatory requirements. MSPs are responsible for conducting RSs and RLTs on all required technologies and ensuring that a Radiation Safety Officer or qualified individual reviews each record, performs a quality check, and signs the form to confirm proper completion. Submissions must include copies of RS and RLT records to local staff or facility points of contact, as well as record copies to designated Contractor representatives. The submittal package must contain two primary components: a Summary Checklist documenting at minimum the serial number, airport code and location, manufacturer, model, dates of last and current surveys, filename, calibration due dates, and reason for survey (PM, CM, SAT/ORT, or other); and the Body section containing copies of actual RS/RLT forms using standard filename conventions from the TSE Maintenance Language. If corrections or changes are required before final TSA acceptance, rejected records and explanations of changes must be attached to the revised version. All records are approved for public release with unlimited distribution.
View the file
Other files
Show 40 more
Latest 50 of 56 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment A: Radiation Survey and Radioactive Leak Test Record Submittal
1. TITLE 2. IDENTIFICATION NUMBER
Radiation Survey and Radioactive Leak Test Record Submittal N/A
3. DESCRIPTION/PURPOSE
3.1. Radiation Survey (RS) and Radioactive Leak Test (RLT) records submittals are the method the OEM or MSP uses to provide documentation of the completion of RSs and RLTs on TSA equipment in accordance with regulatory requirements.
4. APPROVAL DATE (YYMMDD) 5. OFFICE OF PRIMARY RESPONSIBILITY (OPR) 6a. DTC APPLICABLE 6b. GIDEP APPLICABLE
N/A
7. APPLICATION/INTERRELATIONSHIP
7.1. This attachment contains the format and submittal instructions for RSs and RLTs.
8. APPROVAL LIMITATION 9a. REFERENCES 9b. AMSC NUMBER
10. PREPARATION INSTRUCTIONS
10.1. FORMAT. RS and RLT records are prepared using a standardized form by technology and approved by the TSA Occupational Safety, Health, and Environment Division (OSHE). The form must address the requirements required by the Federal regulations.
10.2. SUBMITTAL.
10.2.1. The MSP ensures the following terms are met when submitting RS and RLT records:
a. Conducts RSs and RLTs on all required technologies in accordance with the regulatory and TSA requirements;
b. MSP Radiation Safety Officer or qualified individual reviews each RS and RLT record, performs a quality check, and signs the form confirming it has been completed correctly;
c. Submits copies of RS and RLT records to the local staff or point of contact for non-airport facilities;
d. Provides record copies of all completed and approved RSs and RLTs to designated Contractor representatives.
If any corrections or changes to a RS or RLT are required before final TSA acceptance, the rejected RS(s) or RLT(s)and an explanation of the changes shall be attached to the new version of the RS or RLT.
10.2.2. SUMMARY.
Summary Checklist for all RSs / RLTs on the disk, to include, at a minimum, the following fields:
a. Serial Number;
b. Airport Code;
c. Airport Location;
d. Manufacturer;
e. Model;
f. Date of Last RS/RLT;
g. Date current RS/RLT completed;
h. RS/RLT on disk (Y/N);
i. RS/RLT provided for prior period (Y/N);
j. RS/RLT filename;
k. Survey meter calibration due date;
l. Reason for survey (PM, CM, SAT/ORT, other (fill in the blank)).
10.2.3. BODY.
Copies of RSs/RLTs using the standard filename convention in section 1.3, Radiation Surveys (RS) and Radioactive Leak Tests (RLTs), of the TSE Maintenance Language.
11. DISTRIBUTION STATEMENT
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
| Attachment A: Radiation Survey and Radioactive Leak Test Record Submittal |
| 1. TITLE |
| 2. IDENTIFICATION NUMBER |
| 3. DESCRIPTION/PURPOSE |
| 4. APPROVAL DATE (YYMMDD) |
| 5. OFFICE OF PRIMARY RESPONSIBILITY (OPR) |
| 6a. DTC APPLICABLE |
| 6b. GIDEP APPLICABLE |
| 7. APPLICATION/INTERRELATIONSHIP |
| 8. APPROVAL LIMITATION |
| 9a. REFERENCES |
| 9b. AMSC NUMBER |
| 10. PREPARATION INSTRUCTIONS |
| 11. DISTRIBUTION STATEMENT |
File details come from the government source that posted it. Updated .