70T05026R5900N005 AMD 0003.pdf

PDF 171 KB Posted

Attached to
TSA Gold+ COMMERCIAL SERVICES IDIQ CONTRACT SOLICITATION
Solicitation number
70T05026R5900N005
Issued by

About this file

This is Amendment 0003 to Solicitation 70T05026R5900N005, issued by Mission Essentials on July 24, 2026, with an effective date of July 24, 2026. The amendment revises Section I.2.6.2 of the RFP regarding Volume II submission requirements for Security Screening Operations (Factor 2). The revision clarifies that Volume II constitutes the offeror's technical approach in response to technical requirements specified in the Performance Work Statement (PWS), Attachment 1, sections 1.6.2.1 through 1.6.2.7, and that this volume includes one-part, Security Screening Operations (Factor 2).

Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation by completing items 8 and 15 and returning copies of the amendment, by acknowledging receipt on each copy of the offer submitted, or by separate letter or electronic communication referencing the solicitation and amendment numbers. Failure to acknowledge receipt at the designated place prior to the specified deadline may result in rejection of the offer. All other terms and conditions of the referenced solicitation remain unchanged and in full force and effect.

View the file

Other files

File Type Posted
70T05026R5900N005 Questions and Answers Set 8.pdf PDF
70T05026R5900N005 Questions and Answers Set 7.pdf PDF
70T05026R5900N005 AMD 0004.pdf PDF
70T05026R5900N005 Questions and Answers Set 6.pdf PDF
70T05026R5900N005 Questions and Answers Set 5.pdf PDF
70T05026R5900N005 AMD 0002.pdf PDF
70T05026R5900N005 Questions and Answers Set 4.pdf PDF
70T05026R5900N005 AMD 0001.pdf PDF
AMD 0001 REVISION SUMMARY.pdf PDF
1 Gold_CM Req_Attachment_7.16.26.pdf PDF
43 H RTM Template 5May21.pdf PDF
70T05026R5900N005 Questions and Answers Set 3.pdf PDF
70T05026R5900N005 Questions and Answers Set 2.pdf PDF
70T05026R5900N005 Questions and Answers Set 1.pdf PDF
42 Airport Task Order Summary - Sample.docx DOCX document
12 Attachment C - Failure Mode Indicator Codes.pdf PDF
22 PGDS v8.0 Appendices.pdf PDF
5 L004 - Request for Deviation.pdf PDF
32 TSA MD1900.8, FINAL, 231025, eff231105.pdf PDF
41 Gold Performance Metrics.xlsx XLSX spreadsheet
17 Gold_Maintenance Req_Attachment_4.13.26.pdf PDF
27 OD-400-50-1-5H Reporting Customer Thruput-Wait_Times_111220_FINAL_sig.pdf PDF
31 TSA MD 1900.18, FINAL, eff 24.12.04.pdf PDF
36 ESTIMATED CONSUMABLES LIST.pdf PDF
33 TSA-RTWT-Requirements_Final_2026-04-27.pdf PDF
7 L007 - Configuration Status Accounting Report.pdf PDF
20.1 Attachment E - cap_acceptable_capability_list _R.pdf PDF
4 L003 - Engineering Change Proposal.pdf PDF
23 PGDS v8.0 Main.pdf PDF
6 L005 - Request for Waiver.pdf PDF
Attachment 1 Performance Work Statement.pdf PDF
40 - DHS Form 700-23.pdf PDF
38 SUITABILITY DETERMINATIONS.pdf PDF
1 Gold_CM Req_Attachment_4.13.26.pdf PDF
21 checkpoint-requirements-and-planning-guide.pdf PDF
9 L009 - Configuration Audit Summary Report.pdf PDF
30 TSA MD 1000.15, FINAL, 221118, 508C.pdf PDF
8 L008 - Configuration Audit Plan.pdf PDF
18 Attachment C - SSI Policies and Procedures Handbook.pdf PDF
37 TRAINING REQUIREMENTS.pdf PDF
15 Attachment F - TSE RMA Metrics.pdf PDF
13 Attachment D - TSE Database.pdf PDF
10 Attachment A - Radiation Survey and Radioactive Leak Test Rec.pdf PDF
29 TSA MD 200.52, FINAL, 2, 160829.pdf PDF
2 L001 - Configuration Management Plan.pdf PDF
24 Attachment G - TSA T and E Guidebook Rev 6 - Final.pdf PDF
3 L002 - Master Configuration Item List.pdf PDF
14 Attachment E -SLA Performance Metrics.pdf PDF
16 Attachment G - TSA Media Sanitization Certificate.pdf PDF
19 Attachment D - ITAR_Terms-Conditions GOLD.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

70T05026R5900N0050003 70T050

The purpose of this amendment is to make revisions to Section I.2.6.2 Please see continuation page for full details.

70T050

MISSION ESSENTIALS

6595 Springfield Center Drive Springfield, VA, 20598, US

Same As Issuing Office

70T05026R5900N005

1 2

07/24/2026

07/24/2026

70T05026R5900N0050003

Summary of Changes

Section I.2.6.2 Volume II: Security Screening Operations (Factor 2) is revised as follows with the changed portion bolded:

I.2.6.2 Volume II: Security Screening Operations (Factor 2)

Volume II is the oƯeror’s technical approach in response to the technical requirements in the PWS (Attachment 1; sections 1.6.2.1 through 1.6.2.7) of this RFP. This volume includes one-part, Security Screening Operations (Factor 2).

All other terms and conditions remain unchanged.

End of Amendment 0003.

File details come from the government source that posted it. Updated .