TSA Gold+ COMMERCIAL SERVICES IDIQ CONTRACT SOLICITATION
Solicitation number
70T05026R5900N005
Issued by

About this file

This is a Configuration Management Requirements attachment for Transportation Security Equipment (TSE) systems under a federal contract. The document establishes mandatory configuration management standards that the Contractor must require the equipment manufacturer to implement and maintain throughout the contract lifecycle.

The requirements encompass five key areas: (1) Configuration Management Program establishment with organizational structure and control methods; (2) Configuration Identification through a Master Configuration Item List (MCIL) identifying all system Configuration Items, with initial submission required within 30 business days of contract award and updates prior to scheduled audits; (3) Configuration Control including change management via Engineering Change Proposals (ECP), Requests for Deviation (RFD), and Requests for Waiver (RFW) submitted to CTOCM@tsa.dhs.gov using DD Forms 1692 and 1694, maintained at the Lowest Replaceable Unit (LRU) level for hardware and version level for software; (4) Configuration Status Accounting (CSA) with mandatory monthly Configuration Status Accounting Reports (CSAR) identifying all deviations from the MCIL by serial number, with failure to submit resulting in corrective action; and (5) Configuration Audits including Functional Configuration Audits (FCA) and Physical Configuration Audits (PCA) with a Configuration Audit Plan (CAP) and Configuration Audit Summary Reports (CASR). The document references four Contract Data Requirements Lists (CDRLs): L001 (Configuration Management Plan), L002 (Master Configuration Item List), L007 (Configuration Status Accounting Report), and L008 (Configuration Audit Plan). All TSE systems and CIs must be uniquely identified and map to the Original Equipment Manufacturer baseline without alteration without express Government approval.

View the file

Other files

File Type Posted
70T05026R5900N005 Questions and Answers Set 8.pdf PDF
70T05026R5900N005 Questions and Answers Set 7.pdf PDF
70T05026R5900N005 AMD 0004.pdf PDF
70T05026R5900N005 Questions and Answers Set 6.pdf PDF
70T05026R5900N005 Questions and Answers Set 5.pdf PDF
70T05026R5900N005 AMD 0002.pdf PDF
70T05026R5900N005 Questions and Answers Set 4.pdf PDF
AMD 0001 REVISION SUMMARY.pdf PDF
70T05026R5900N005 AMD 0001.pdf PDF
43 H RTM Template 5May21.pdf PDF
70T05026R5900N005 Questions and Answers Set 2.pdf PDF
21 checkpoint-requirements-and-planning-guide.pdf PDF
20.1 Attachment E - cap_acceptable_capability_list _R.pdf PDF
14 Attachment E -SLA Performance Metrics.pdf PDF
15 Attachment F - TSE RMA Metrics.pdf PDF
9 L009 - Configuration Audit Summary Report.pdf PDF
37 TRAINING REQUIREMENTS.pdf PDF
4 L003 - Engineering Change Proposal.pdf PDF
7 L007 - Configuration Status Accounting Report.pdf PDF
70T05026R5900N005.pdf PDF
22 PGDS v8.0 Appendices.pdf PDF
19 Attachment D - ITAR_Terms-Conditions GOLD.pdf PDF
17 Gold_Maintenance Req_Attachment_4.13.26.pdf PDF
31 TSA MD 1900.18, FINAL, eff 24.12.04.pdf PDF
35 SAFETY ACT BLOCK DESIGNATION NOTICE.pdf PDF
11 Attachment B - TSE Metrics Terms and Definitions and RMA Metrics.pdf PDF
25 Attachment H - TSA Handbook 1100.73-2, FINAL, 201218.pdf PDF
39 ACRONYMS AND DEFINITIONS.pdf PDF
27 OD-400-50-1-5H Reporting Customer Thruput-Wait_Times_111220_FINAL_sig.pdf PDF
28 TSA MD 200.51, FINAL, 171114.pdf PDF
5 L004 - Request for Deviation.pdf PDF
12 Attachment C - Failure Mode Indicator Codes.pdf PDF
42 Airport Task Order Summary - Sample.docx DOCX document
24 Attachment G - TSA T and E Guidebook Rev 6 - Final.pdf PDF
18 Attachment C - SSI Policies and Procedures Handbook.pdf PDF
33 TSA-RTWT-Requirements_Final_2026-04-27.pdf PDF
30 TSA MD 1000.15, FINAL, 221118, 508C.pdf PDF
10 Attachment A - Radiation Survey and Radioactive Leak Test Rec.pdf PDF
3 L002 - Master Configuration Item List.pdf PDF
8 L008 - Configuration Audit Plan.pdf PDF
Attachment 1 Performance Work Statement.pdf PDF
41 Gold Performance Metrics.xlsx XLSX spreadsheet
40 - DHS Form 700-23.pdf PDF
23 PGDS v8.0 Main.pdf PDF
1 Gold_CM Req_Attachment_4.13.26.pdf PDF
36 ESTIMATED CONSUMABLES LIST.pdf PDF
32 TSA MD1900.8, FINAL, 231025, eff231105.pdf PDF
38 SUITABILITY DETERMINATIONS.pdf PDF
2 L001 - Configuration Management Plan.pdf PDF
16 Attachment G - TSA Media Sanitization Certificate.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Transportation Security Equipment Configuration Management Requirements

Attachment: Configuration Management Requirements

1.1 Configuration Management Program

All Transportation Security Equipment (TSE) systems shall be maintained under strict configuration management. All system Configuration Items (CIs) and hardware and software CIs shall be uniquely identified and map back to the Original Equipment Manufacturer’s (OEM) configuration baseline. The Contractor shall require the equipment manufacturer not to alter these systems in any way without the express approval of the Government.

The Contractor shall require the equipment manufacturer to establish, implement, and maintain a Configuration Management (CM) Program based on the requirements of this statement of work. Should the OEM already have a TSA-approved CM plan, the Contractor shall maintain the TSA-approved CM plan for the life of this contract. The CM program shall provide an organizational structure with configuration identification and control methods, configuration audits, and Configuration Status Accounting (CSA) procedures for system hardware, software, firmware and deliverables. The CM requirements are applicable to all deliverables under this contract and associated task orders.

The Contractor shall require the equipment manufacturer to prepare and deliver the Configuration Management Plan in accordance with the referenced CDRL.

CDRL L001 – Configuration Management Plan

1.1.1 Configuration Baselines

The Contractor shall require the equipment manufacturer to establish and maintain the configuration baseline for each TSE configuration and establish and maintain the required documentation to support this configuration, referred to as the Product Baseline (PBL).

1.1.2 Configuration Identification

The PBL shall retain all documentation for identification, control and status accounting of any Configuration Item (CI) throughout the program life cycle. The CI identification shall be available in a Master Configuration Item List (MCIL). All system CIs and top level hardware and software CIs shall be uniquely identified.

The Contractor shall require the equipment manufacturer to prepare and deliver a MCIL per TSE in accordance with the referenced CDRL. The Contractor shall require the equipment manufacturer to prepare and submit the initial MCIL to the Government thirty (30) business days after contract award;

updated MCILs will be required prior to scheduled configuration audits and ASREQ.

CDRL L002 - Master Configuration Item List

1.1.3 Configuration Control

The Contractor shall require the equipment manufacturer to apply configuration change management measures to each baseline CI and its configuration documentation. The configuration change management system shall provide effective means, as applicable, for proposing changes to CIs and ensuring implementation of the approved change. The Contractor shall require the equipment manufacturer to maintain configuration change management of hardware, software, firmware, and developmental/commercial and training documentation. The Contractor shall require the equipment manufacturer to maintain configuration change management of hardware to the Lowest Replaceable Unit (LRU) level and software to the version level.

Changes represent opportunities for improvement or correction of deficiencies. Desired changes are documented in Requests for Change (RFC) in the form of Engineering Change Proposals (ECP), Requests for Deviation (RFD), and Requests for Waiver (RFW), which are uniquely identified. All change requests are entered, tracked, controlled, and documented and the Contractor shall require the equipment manufacturer to establish and maintain a system for tracking, controlling, and submitting all changes.

The equipment manufacturer is encouraged to voluntarily develop, prepare, and submit Value Engineering Change Proposals (VECP). The VECP shall include a clear description and related schedule on how the Contractor plans on incorporating the VECP into fielded Transportation Security Equipment (TSE) units without adversely affecting operational availability of the EDS.

ECPs are requests to incorporate a permanent change to product configuration, which produces a new baseline. RFDs are requests to temporarily incorporate a known departure from product requirements. Authorized deviations are a temporary departure from requirements and do not constitute a permanent change. RFDs must state actions to be taken at the end of the temporary deviation (e.g. restoration to original configuration). RFWs are requests to incorporate a known departure from product requirements. Authorized waivers are for specific quantities of product and do not constitute a change to the baseline configuration or its documentation.

The Contractor shall require the equipment manufacturer to deliver configuration control data submittals directly to government via email at CTOCM@tsa.dhs.gov using the following formats:

ECP DD FORM1692, AUG 96 (EG), Pages 1-7 as applicable

RFD / RFW: DD FORM 1694, AUG 96 (EG)

The Contractor shall require the equipment manufacturer to deliver all supporting documentation directly to the government via email at CTOCM@tsa.dhs.gov and link it to the appropriate

ECP/RFD/RFW.

1.1.4 Configuration Status Accounting

The Contractor shall require the equipment manufacturer to maintain a Configuration Status Accounting (CSA) Information System to assure accurate identification of each CI. The Contractor shall require the equipment manufacturer to ensure that the CSA information is provided to the Government upon request. The CSA information shall be provided as a monthly Configuration Status Accounting Report (CSAR). Failure to submit the CSAR on a recurring monthly basis will result in a corrective action report against the Contractor that will document the negative performance and may led to Government consideration. The CSA System shall be described in the CMP. The CSAR shall identify all deviations from the MCIL for each unit, i.e. for all serial numbers.

The Contractor shall require the equipment manufacturer to prepare and deliver the CSAR in accordance with the referenced CDRL.

CDRL L007 - Configuration Status Accounting Report

1.1.5 Configuration Audits

The Contractor shall require the equipment manufacturer to support PBL Audits and shall perform internal configuration audits. The Contractor shall require the equipment manufacturer to prepare and submit a Configuration Audit Plan (CAP) that describes procedures for conducting the audit, including Functional Configuration Audit (FCA) and Physical Configuration Audit (PCA). When proposed and approved in the CAP, the Contractor may invite SubContractors, vendors, and suppliers to participate in the configuration audits, as proposed and approved via the CAP.

The FCA shall verify system functional performance requirements; the PCA shall verify system physical performance requirements. The Contractor shall require the equipment manufacturer to prepare and submit a Configuration Audit Summary Report (CASR) documenting the results of each audit and the resolution for each finding.

The Contractor shall require the equipment manufacturer to prepare and deliver the CAP in accordance with the referenced CDRL.

CDRL L008 - Configuration Audit Plan