SPECIFICATIONS 2023-0405 - 506-20-102.pdf

PDF 12 MB Posted

Attached to
Z2DA--506-20-102 Upgrade Basement Building 1W (23NR9KA30)
Solicitation number
36C25023B0027
Issued by

About this file

This pre-solicitation announcement provides details for an upcoming invitation for bids to renovate basement spaces at the LTC Charles S. Kettles Veterans Administration Medical Center in Ann Arbor, Michigan. The project scope includes interior renovation of approximately 14,000 square feet to upgrade mechanical, electrical, and plumbing systems as well as improve layout, flow, and function. Work will include asbestos abatement. The estimated cost is between $1,000,000 and $5,000,000. The solicitation is anticipated to be issued on or about March 20, 2023 via the System for Award Management website. The resulting firm fixed price contract will be set aside for qualified Service-Disabled Veteran Owned Small Businesses and awarded within 120 days of bid opening. Offerors must be registered in both the Vendor Information Pages and System for Award Management databases prior to submitting a proposal. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10 is the contracting agency.

View the file

Other files

File Type Posted
Notice of Award Contract 36C25024C0025 Oct 31 - 506-20-102.pdf PDF
36C25023B0027 0007.pdf PDF
36C25023B0027 0006.pdf PDF
14.15_E602 - PANELBOARD SCHEDULES RFI 28 - 506-20-102.pdf PDF
1-AE114 - PHASE A5 NEW WORK PLAN RFI 29 - 506-20-102.pdf PDF
105126 Plastic Lockers for RFI 29 Answer - 506-20-102.pdf PDF
1-AE112 - PHASE A3 NEW WORK PLAN RFI 29 - 506-20-102.pdf PDF
123100 Metal Casework for RFI 29 Answer - 506-20-102.pdf PDF
000110 TOC for RFI 29 Answer - 506-20-102.pdf PDF
36C25023B0027 0005.pdf PDF
14.03_1-EP101 - BASEMENT POWER PLAN - NEW WORK - RFI 28 - 506-20-102.pdf PDF
36C25023B0027 0004.pdf PDF
S04 - Pre-Bid 2nd Site Visit Agenda - 506-20-102.pdf PDF
S04 - Pre Bid 2nd Site Visit Attendance Log - 506-20-102 signed.pdf PDF
BID SPECIFICATIONS 2023-0510 Update - 506-20-102.pdf PDF
36C25023B0027 0003.pdf PDF
Addendum 01 Section 11 41 21 - 506-20-102.pdf PDF
36C25023B0027 0002.pdf PDF
RFI No. 14 Drawing Q and A - 506-20-102.pdf PDF
Asbestos Assessment-07.2022 - 506-20-102.pdf PDF
Addendum 01 Section 11 73 00 - 506-20-102.pdf PDF
Addendum 01 Section 01 00 00 - 506-20-102.pdf PDF
S04 - Pre-Bid Walk Through Attendance Sheet signed - 506-20-102.pdf PDF
36C25023B0027 0001 - 506-20-102.pdf PDF
S04 - Pre-Bid Site Visit Agenda signed - 506-20-102.pdf PDF
RFI Form - 506-20-102.pdf PDF
EMR Certification Form - 506-20-102.pdf PDF
Brand Name Only Justification Security Cameras - 506-20-102.pdf PDF
Brand Name Only Justification Fire Alarm System - 506-20-102.pdf PDF
Brand Name Only Justification Nuclear Storage Flooring - 506-20-102.pdf PDF
Drawings - 506-20-102.pdf PDF
Brand Name Only Justification Building Controls - 506-20-102.pdf PDF
36C25023B0027 Apr 6 - 506-20-102.pdf PDF
Wage Determination MI20230101 Feb 24 - 506-20-102.pdf PDF
36C25023B0027.docx DOCX document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF VETERANS AFFAIRS

ANN ARBOR, MI

2215 Fuller Rd

Ann Arbor, MI 48105

Upgrade Basement Building 1-West VA Project No.: #506-20-102

Bid Documents

Prepared By:

January 2023 quinn Stamp

Ann Arbor VAMC: Project #506-20-102 Upgrade Basement Bldg. 1-West

09-01-19

00 01 10-1

TABLE OF CONTENTS

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

DIVISION 00 - SPECIAL SECTIONS DATE

00 01 15 List of Drawing Sheets 07-15

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 12-18 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 04-13 01 33 23 Shop Drawings, Product Data, and Samples 05-17 01 35 26 Safety Requirements 02-17 01 42 19 Reference Standards 09-19 01 45 00 Quality Control 03-19 01 45 29 Testing Laboratory Services 11-18 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 09-13 01 81 13 Sustainable Construction Requirements 10-17 01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17 02 82 11 Asbestos Abatement 04-19 02 82 13.13 Glovebag Asbestos Abatement 09-15 02 82 13.19 Asbestos Floor Tile and Mastic Abatement 09-15 02 83 33.13 Lead-Based Paint Removal and Disposal 08-16

DIVISION 03 – CONCRETE

03 30 53 (Short-Form) Cast-in-Place Concrete 02-16

DIVISION 04 – MASONRY

04 05 13 Masonry Mortaring 10-17 04 05 16 Masonry Grouting 02-16 04 20 00 Unit Masonry 08-17 04 72 00 Cast Stone Masonry 02-15

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-18 05 21 00 Steel Joist Framing 11-18

09-01-19

00 01 10-2

TABLE OF CONTENTS

05 50 00 Metal Fabrications 08-18

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17 06 16 63 Cementitious Sheathing 02-16 06 20 00 Finish Carpentry 08-16

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 13 Thermal Insulation 10-17 07 81 00 Applied Fireproofing 10-17 07 84 00 Firestopping 02-16 07 92 00 Joint Sealants 10-17 07 95 13 Expansion Joint Cover Assemblies 02-16

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 08-16 08 14 00 Interior Wood Doors 02-16 08 31 13 Access Doors and Frames 02-16 08 41 13 Aluminum-Framed Entrances and Storefronts 01-21 08 71 00 Door Hardware 08-19 08 71 13 Automatic Door Operators 02-16 08 80 00 Glazing 10-15 08 90 00 Louvers and Vents 05-15

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 02-15 09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 06-18 09 30 13 Ceramic/Porcelain Tiling 09-15 09 51 00 Acoustical Ceilings 12-18 09 54 23 Linear Metal Ceilings 10-15 09 65 13 Resilient Base and Accessories 02-16 09 65 16 Resilient Sheet Flooring 05-18 09 65 19 Resilient Tile Flooring 05-18 09 67 23.30 Resinous (Epoxy Resin Composition) Mortar Flooring (RES-3) 07-14 09 67 23.60 Resinous (Urethane and Epoxy Mortar) Flooring (RES-6) 07-14 09 91 00 Painting 01-16 09 96 59 High-Build Glazed Coatings 07-14

DIVISION 10 – SPECIALTIES

10 14 00 Signage 10-15 10 26 00 Wall and Door Protection 10-15

09-01-19

00 01 10-3

TABLE OF CONTENTS

10 28 00 Toilet, Bath, and Laundry Accessories 02-16 10 44 13 Fire Extinguisher Cabinets 08-18

DIVISION 11 – EQUIPMENT

11 41 21 Walk-In Coolers and Freezers (VA Furnished, Contractor Installed) 05-15 11 73 00 Ceiling Mounted Patient Lift System 01-17 11 78 00 Mortuary Equipment 11-11 11 78 13 Mortuary Refrigerators (VA Furnished, Contractor Installed) 11-11

DIVISION 12 – FURNISHINGS

12 32 00 Manufactured Wood Casework 09-15 12 36 00 Countertops 12-18

DIVISION 13 - SPECIAL CONSTRUCTION

Not Used

DIVISION 14– CONVEYING EQUIPEMENT

Not Used

DIVISION 21- FIRE SUPPRESSION

21 08 00 Commissioning of Fire Suppression System 11-16 21 13 13 Wet-Pipe Sprinkler Systems 06-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 07-16 22 05 23 General-Duty Valves for Plumbing Piping 09-15 22 07 11 Plumbing Insulation 09-19 22 11 00 Facility Water Distribution 09-15 22 13 00 Facility Sanitary and Vent Piping 09-15 22 40 00 Plumbing Fixtures 09-15 22 66 00 Chemical-Waste Systems for Laboratory and Healthcare Facilities 09-20

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 02-20 23 05 12 General Motor Requirements for HVAC and Steam Generation Equipment 02-20 23 05 41 Noise and Vibration Control for HVAC Piping and Equipment 02-20 23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20 23 07 11 HVAC and Boiler Plant Insulation 02-20 23 08 00 Commissioning of HVAC Systems 02-20

09-01-19

00 01 10-4

TABLE OF CONTENTS

23 09 23 Direct-Digital Control System for HVAC 09-11 23 21 13 Hydronic Piping 02-20 23 21 23 Hydronic Pumps 02-20 23 22 13 Steam and Condensate Heating Piping 02-20 23 23 00 Refrigerant Piping 02-20 23 25 00 HVAC Water Treatment 02-20 23 31 00 HVAC Ducts and Casings 02-20 23 34 00 HVAC Fans 02-20 23 36 00 Air Terminal Units 02-20 23 37 00 Air Outlets and Inlets 02-20 23 40 00 HVAC Air Cleaning Devices 03-20 23 65 00 Cooling Towers 03-20 23 73 00 Indoor Central-Station Air-Handling Units 03-20 23 82 00 Convection Heating and Cooling Units 03-20 23 82 16 Air Coils 03-20

DIVISION 25 – INTEGRATED AUTOMATION

Not Used.

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16 26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 01-18 26 05 73 Overcurrent Protective Device Coordination Study 01-18 26 08 00 Commissioning of Electrical Systems 11-16 26 09 23 Lighting Controls 01-18 26 22 00 Low-Voltage Transformers 01-18 26 24 16 Panelboards 01-18 26 27 26 Wiring Devices 01-18 26 29 11 Motor Controllers 01-18 26 51 00 Interior Lighting 01-18 26 55 71 Medical and Surgical Lighting Fixtures 01-18

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19 27 05 26i Grounding and Bonding for Communications Systems 12-22 27 05 33i Raceways and Boxes for Communications Systems 12-22 27 05 53i Identification of Communication Systems 12-22 27 08 00 Commissioning of Communications Systems 11-16 27 10 00i Structured Cabling 12-22 27 13 13i Communication Copper Terminations 12-22 27 15 13i Communications Copper Horizontal Cabling 12-22 27 16 19i Communications Patch Cords 12-22

09-01-19

00 01 10-5

TABLE OF CONTENTS

27 51 16 Public Address and Mass Notification Systems 10-18

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18 28 05 13 Conductors and Cables for Electronic Safety and Security 10-18 28 05 28.33 Conduits and Backboxes for Electronic Safety and Security 09-11 28 08 00 Commissioning of Electronic Safety and Security Systems 11-16 28 13 00 Physical Access Control System 10-11 28 16 00 Intrusion Detection System 10-11 28 23 00 Video Surveillance 09-11 28 31 00 Fire Detection and Alarm 10-11

DIVISION 31 – EARTHWORK

31 20 11 Earthwork (Short Form) 10-12

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 31 13 Chain Link Fences and Gates 06-18

DIVISION 33 – UTILITIES

Not Used

DIVISION 34 – TRANSPORTATION

Not Used

DIVISION 48 – Electrical Power Generation

Not Used

07-01-15

00 01 15 - 1

LIST OF DRAWING SHEETS

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

GENERAL

GI000 COVER SHEET, SHEET INDEX

GI001 LIFE SAFETY PLAN

GI002 WALL TYPES AND NOTES

GI003 ICRA CLASS III REQUIREMENTS

GI101 CONTRACTOR STAGING

STRUCTURAL

28-S101 STRUCTURAL NEW WORK

28-S501 STRUCTURAL DETAILS AND SECTIONS

ARCHITECTURAL

1-AD100 OVERALL DEMOLITION PLAN

1-AD110 PHASE A1 DEMOLITION PLAN

28-AD111 PHASE A2 DEMOLITION PLAN

1-AD112 PHASE A3 DEMOLITION PLAN

1-AD113 PHASE A4 DEMOLITION PLAN

1-AD114 PHASE A5 DEMOLITION PLAN

1-AD115 PHASE B1 DEMOLITION PLAN

1-AD116 PHASE B2 DEMOLITION PLAN

1-AD117 PHASE B3 DEMOLITION PLANS

1-AD118 PHASE B4 DEMOLITION PLAN

28-AD141 PHASE A2 DEMOLITION REFLECTED CEILING PLAN

1-AE101 OVERALL NEW WORK AND PHASING PLAN

1-AE110 PHASE A1 NEW WORK PLAN

28-AE111 PHASE A2 NEW WORK PLAN

1-AE112 PHASE A3 NEW WORK PLAN

1-AE113 PHASE A4 NEW WORK PLAN

1-AE114 PHASE A5 NEW WORK PLAN

07-01-15

00 01 15 - 2

LIST OF DRAWING SHEETS

1-AE115 PHASE B1 NEW WORK PLAN

1-AE116 PHASE B2 NEW WORK PLAN

1-AE117 PHASE B3 NEW WORK PLAN

1-AE118 PHASE B4 NEW WORK PLAN

1-AC140 REFLECTED CEILING PHASING PLAN

28-AC141 REFLECTED CEILING PLAN

1-AC142 REFLECTED CEILING PLANS

1-AC143 REFLECTED CEILING PLANS

28-AE311 WALL SECTIONS AND DETAILS

1-AE312 WALL SECTIONS

1-AE401 MILLWORK SECTIONS AND ELEVATIONS

1-AE601 ROOM FINISH SCHEDULE AND FINISH PLAN

1-AE602 DOOR SCHEDULE AND DETAILS

1-AE603 MISCELLANEOUS DETAILS

1-AE611 SIGNAGE PLAN AND SCHEDULE

FIRE PROTECTION

1-FX101 FIRE SUPRESSION PLAN

28-FX101 GROUND FLOOR FIRE SUPPRESSION PLAN

PLUMBING

P100 PLUMBING LEGEND AND GENERAL NOTES

1-PD101 SUB BASEMENT PLUMBING - DEMOLITION

1-PD102 BASEMENT PLUMBING PLAN - DEMOLITION

1-PL101 SUB BASEMENT PLUMBING - NEW WORK

1-PL102 BASEMENT & TENTH FLOOR PLUMBING PLAN - NEW

WORK

1-PL501 PLUMBING DETAILS & SCHEDULES

1-PL601 PLUMBING ISOMETRICS

28-PD101 UNDERGROUND PLUMBING DEMOLITION PLAN

28-PD102 GROUND FLOOR PLUMBING DEMOLITION PLAN

28-PL101 UNDERGROUND PLUMBING NEW WORK PLAN

28-PL102 GROUND FLOOR PLUMBING NEW WORK PLAN

28-PL501 PLUMBING DETAILS AND SCHEDULES

28-PL601 PLUMBING ISOMETRICS

07-01-15

00 01 15 - 3

LIST OF DRAWING SHEETS

MECHANICAL

M001 MECHANICAL LEGEND SHEET

1-MD101 BASEMENT MECHANICAL PLAN - DEMOLITION

1-MD110 TENTH FLOOR MECHANICAL PLAN - DEMOLITION

1-MH101 BASEMENT MECHANICAL PLAN - NEW WORK

1-M104 FOURTH FLOOR OVERALL PLAN - NEW WORK

1-M109 NINTH FLOOR MECHANICAL PLAN - NEW WORK

1-M110 TENTH FLOOR MECHANICAL PLAN - NEW WORK

1-MP101 BASEMENT MECHANICAL PIPING PLAN - NEW WORK

28-MD101 BASEMENT MECHANICAL PLAN - DEMOLITION

28-MH101 BASEMENT MECHANICAL PLAN - NEW WORK

28-M102 SECOND FLOOR MECHANICAL PLAN - NEW WORK

28-MP101 BASEMENT MECHANICAL PIPING PLAN - NEW WORK

M301 MECHANICAL SECTIONS

M401 MECHANICAL ENLARGED PLANS

M402 MECHANICAL ENLARGED PLANS

M501 MECHANICAL DETAILS I

M502 MECHANICAL DETAILS II

M503 MECHANICAL DETAILS III

M601 MECHANICAL SCHEDULES

M602 MECHANICAL SCHEDULES

M701 MECHANICAL CONTROLS

M702 MECHANICAL CONTROLS

M703 MECHANICAL CONTROLS

ELECTRICAL

E001 LEGEND

1-ED101 BASEMENT ELECTRICAL DEMOLITION PLAN

1-EL101 BASEMENT LIGHTING PLAN - NEW WORK

1-EP101 BASEMENT POWER PLAN - NEW WORK

1-EY101 BASEMENT TECHNOLOGY & FIRE ALARM PLAN - NEW

WORK

1-EP104 FOURTH FLOOR POWER PLAN - NEW WORK

1-EP109 NINTH FLOOR POWER PLAN - NEW WORK

07-01-15

00 01 15 - 4

LIST OF DRAWING SHEETS

1-E110 ELECTRICAL PLANS - TENTH FLOOR

28-ED101 ELECTRICAL DEMOLITION PLAN

28-EL101 ELECTRICAL LIGHTING PLAN

28-EP101 ELECTRICAL POWER PLAN

28-EY101 ELECTRICAL TECHNOLOGY & FIRE ALARM PLAN

E501 ELECTRICAL DETAILS

E502 ELECTRICAL DETAILS

E601 PANELBOARD SCHEDULES

E602 PANELBOARD SCHEDULES

E603 PANELBOARD SCHEDULES

E604 PANELBOARD SCHEDULES

- - - E N D - - -

03-01-20

01 00 00 -1

GENERAL REQUIREMENTS

SECTION 01 00 00

GENERAL REQUIREMENTS

1.1 SAFETY REQUIREMENTS

Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Visits to the site by Bidders shall be made only by appointment with the Medical Center

Contracting Officers Representative (COR).

B. Offices of FFE Inc. at 4445 Lake Forest Dr., Suite 600, Cincinnati, OH 45242, as

Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.

C. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

1.3 STATEMENT OF BID ITEM(S)

A. ITEM I, BASE BID: Work includes general construction, renovation, and alterations as shown on the Contract Drawings. All phases of work including closeout documents shall be completed within 450 calendar days after receipt of Notice to Proceed.

B. ALTERNATE NO.1: Work includes BASE BID, except omit parts of Phase B3 and Phase B4 shown within the Contract Documents. All phases of work including closeout documents shall be completed within 405 calendar days after receipt of Notice to Proceed.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

03-01-20

01 00 00 -2

GENERAL REQUIREMENTS

1. General Contractor’s employees shall not enter the project site without appropriate badge.

They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting

Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting

Officer.

4. VA reserves the right to close down or shut down the project site and order General

Contractor’s employees off the premises in the event of a national emergency. The General

Contractor shall return to the site only with the written approval of the Contracting Officer.

C. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the COR for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71 00, DOOR HARDWARE and coordinate.

D. Document Control:

1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law

Enforcement Sensitive” or “Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

03-01-20

01 00 00 -3

GENERAL REQUIREMENTS

7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document Management Software (EDMS).

a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.

b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

E. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

2. A limited number of (2 to 5) permits shall be issued for General Contractor and its employees for parking in designated areas only.

1.6 OPERATIONS AND STORAGE AREAS

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities shall be erected by the

Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the

Contractor at its expense upon completion of the work. With the written consent of the

Contracting Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

(FAR 52.236-10)

D. Working space and space available for storing materials shall be as shown on the drawings

E. Workers are subject to rules of Medical Center applicable to their conduct.

03-01-20

01 00 00 -4

GENERAL REQUIREMENTS

F. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

G. Phasing:

The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service shall be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.

To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR three weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof.

Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to COR and Contractor, as follows:

PHASE A1

PREPARE THE 10TH FLOOR FOR THE NEW ELECTRICAL SHOP RELOCATION PRIOR TO

DEMOLITION OF ITEMS WITHIN THE EXISTING ELECTRICAL SHOP.

MECHANICAL EQUIPMENT ON THE 4TH FLOOR ASSOCIATED WITH OTHER PHASES OF

WORK CAN BE PREPARED DURING THIS PHASE TO THE EXTENT ALLOWABLE AS TO NOT

INTERFERE WITH FACILITY OPERATIONS.

03-01-20

01 00 00 -5

GENERAL REQUIREMENTS

INSTALLATION OF THE ACCESS PANEL INTO SHAFT-9 ON THE SECOND FLOOR SHALL

OCCUR IN THIS PHASE AND WORK COMPLETED OUTSIDE OF NORMAL BUSINESS HOURS.

SEE PLAN ON THIS SHEET.

PHASE A2

AFTER COMPLETION OF PHASE A1, DEMOLISH EXISTING ROOMS AND ASSOCIATED

ITEMS PER SHEET 28-AD111: ELECTRICAL SHOP, ELECTRICAL SHOP STORAGE (FG02),

ELECTRICAL SHOP (FG01A), RECREATIONAL THERAPY (FG10C), OFFICE (FG10C1), OFFICE

(FG10C2).

PROVIDE NEW CORRIDOR THAT CONNECTS BUILDING 1W WITH NEW MORGUE AND

BUILDING 28. SEE PHASE A3 FOR CONNECTION.

PROVIDE NEW ROOMS AND ASSOCIATED WORK PER SHEETS 28-AE111 AND 28-AC141:

MORGUE CORRIDORS, WAITING ROOM, VIEWING ROOM, MORGUE COOLER,

MECHANICAL ROOM, AUTOPSY OFFICE, AUTOPSY ROOM, ANTE ROOM, SINGLE USER

RESTROOM, SINGLE USER SHOWER.

CONTRACTOR SHALL SEQUENCE THE WORK SO THAT THE NEW MORGUE COOLER IS

OPERATIONAL PRIOR TO SHUTDOWN OF THE EXISTING MORTUARY SPACES IN

BUILDING 1W. FINAL MECHANICAL CONNECTIONS ARE REQUIRED WITHIN BUILDING 1W

DURING THIS PHASE AND SHALL BE COORDINATED WITH THE VA TO MINIMIZE

DOWNTIME OF THE AUTOPSY ROOM, PRIVATE VIEWING ROOM, AND MORGUE COOLER.

NIGHTS AND WEEKEND WORK IS EXPECTED FOR THESE FINAL MECHANICAL

CONNECTIONS.

PHASE A3

DEMOLISH EXISTING ROOMS AND ASSOCIATED ITEMS PER SHEET 1-AD112: CORRIDOR

(C1), STORAGE (AB39), MECHANICAL (AB42), RESTROOM (AB43), PRIVATE VISITATION

ROOM (AB45), AUTOPSY ROOM (AB46), AUTOPSY OFFICE (AB48).

PROVIDE NEW ROOMS AND ASSOCIATED WORK PER SHEETS 1-AE113 AND 1-AC142:

SOUTH CORRIDOR – EAST, MISC. STORAGE, NUCLEAR WASTE STORAGE, SOUTH

CORRIDOR – WEST.

PHASE A4

REMOVE ACCOUSTIC CEILING TILE FROM GRID PRIOR TO NEW MECHANICAL WORK:

MEN'S LOCKERS (AB94), MEN'S TOILET (AB94A), EVS BREAK ROOM (AB92), AND TOILET

ROOM (AB92A).

REPLACE CEILING TILES AT COMPLETION OF MECHANICAL WORK.

PHASE A5

03-01-20

01 00 00 -6

GENERAL REQUIREMENTS

CONTRACTOR SHALL PROVIDE FOUR-MONTH'S NOTICE TO VA C.O.R. PRIOR TO

DEMOLITION OF THIS SPACE FOR PROPER DECOMMISSIONING OF THE EXISTING

RADIATION SAFETY SPACES. RELOCATE AND DEMOLISH EXISTING ROOMS AND

ASSOCIATED ITEMS PER SHEET 1-AD114: RADIATION SAFETY STORAGE (AB31),

RADIATION SAFETY STORAGE (AB33).

PROVIDE NEW ROOMS AND ASSOCIATED WORK PER SHEETS 1-AE114, 1-AC142, 1-AC143:

SOUTH CORRIDOR -WEST, EMERGENCY PREP STORAGE, MECHANICAL, SLIDE STORAGE.

PHASE B1

EXISTING BIO MED (BB09B) IS TO BE CLEARED BY VA PRIOR TO START OF PROJECT. AN

OPENING IS TO BE CREATED BETWEEN EXISTING BIO MED (BB09B) AND EXISTING

MECHANICAL (AB21A) PROVIDING ACCESS TO THE NEW MECHANICAL ROOM (AB21A)

DURING DEMOLITION. ACCESS WILL NOT BE ALLOWED THROUGH RADIATION SAFETY

STORAGE.

DEMOLISH EXISTING ROOMS AND ASSOCIATED ITEMS PER SHEET 1-AD115: STAGING

AREA (BB18), CANTEEN VENDING (BB19), MECHANICAL (AB21A).

PROVIDE NEW ROOMS AND ASSOCIATED WORK PER SHEETS 1-AE115 AND 1-AE142: N&FS

DRY STORAGE, FREEZER, COOLER.

PHASE B2

CONTENTS WITHIN EXISTING FREEZERS SHALL BE MOVED BY THE VA TO EXISTING

FREEZERS AND COOLERS ON NORTH SIDE OF DOCK CORRIDOR FOR THE DURATION OF

THIS PHASE WORK.

DEMOLISH EXISTING ROOMS AND ASSOCIATED ITEMS PER SHEET 1-AD113: N&FS AND

BIO MED VESTIBULE (BB09), N&FS FREEZER (BB09A), N&FS STORAGE (BB09A), BIO MED

(BB09B), PATRIOT CAFÉ STORAGE (BB13), CANTEEN FREEZER (BB13A), CANTEEN COOLER

(BB13B).

PROVIDE NEW ROOMS AND ASSOCIATED WORK PER SHEETS 1-AE116 AND 1-AC142:

CANTEEN DRY STORAGE, CANTEEN FREEZER, CANTEEN COOLER, AND CANTEEN

VENDING.

ACCESS TO MECHANICAL AB21A SHALL NOT BE THROUGH RADIATION SAFETY

STORAGE AB31. CONTRACTOR SHALL SEQUENCE THE WORK SO THAT ALL WORK

WITHIN MECHANICAL AB21A BE ACCESSED FROM THE TEMPORARY OPENING PROVIDED

AT THE NORTH WALL OR THROUGH THE CRAWLSPACE FLOOR ACCESS LEADING FROM

STAIR 5.

PHASE B3

03-01-20

01 00 00 -7

GENERAL REQUIREMENTS

DEMOLISH EXISTING ROOMS AND ASSOCIATED ITEMS PER SHEET 1-AD117: N&FS DRY

STORAGE (BB07), N&FS COOLER (BB07A), N&FS FREEZER (BB07B).

PROVIDE NEW ROOMS AND ASSOCIATED WORK PER SHEETS 1-AE117, 1-AE143: LINEN

CACHE AND CANTEEN RETAIL. RELOCATE EXISTING CANTEEN RETAIL INTO FUTURE

LINEN CACHE AT CONCLUSION OF PHASE.

PHASE B4

DEMOLISH EXISTING ROOMS AND ASSOCIATED ITEMS PER SHEET 1-AD118: DOCK

CORRIDOR, CORRIDOR (C4), MECHANICAL (BB03), CANTEEN RETAIL (BB05A, BB05B) AND

N&FS STORAGE (BB05C).

PROVIDE NEW ROOMS AND ASSOCIATED WORK PER SHEETS 1-AE118 AND 1-AE143:

LINEN CACHE, CANTEEN RETAIL, BIO MED, STORAGE, NORTH CORRIDOR – WEST AND

NORTH CORRIDOR – EAST.

Scheduled work in each phase, specific area of the site, building, or portion thereof shall not commence until the VA has notified the Contractor in writing that the prior phase or phases have been completed to the VA's satisfaction, and the Contractor has provided the required advanced written notice of their intent to progress to the next phase.

1. The following are instructions for obtaining approval to transition from one phase to the next. The activities described below do not replace or alter commissioning requirements.

a. To obtain the VA's confirmation that a phase is complete, the Contractor must first request a pre-final inspection by the VA, in writing. The purpose of the pre-final inspection is to ensure no significant, outstanding work remaining that may delay acceptance and occupancy by the VA. Pre-final inspection will be performed by the

COR and subject-matter experts selected by the VA, as needed.

b. A punch list will be created by the VA to provide feedback to the Contractor on what needs to be addressed prior to the final inspection. This will be done to aid the

Contractor in receiving approval. The punch list will be transmitted to the Contractor in writing within five business days of receipt of the Contractor's written request to the VA for the pre-final inspection.

c. The Contractor shall complete the punch list items and notify the VA of their completion and request, in writing, that the space be re-evaluated with a final inspection.

d. The final inspection will be performed by the VA project team, including the Engineer of Record. The purpose is to verify that the work is satisfactorily complete and determine whether the space is ready for occupancy and utilization by the VA.

03-01-20

01 00 00 -8

GENERAL REQUIREMENTS

e. Within 5 business days, the Contract Officer will notify the Contractor in writing that either:

• the punch list items have been completed to the VA's satisfaction and the VA determined that the work is satisfactorily complete, the space is ready for occupancy and utilization, and that the Contractor may issue written notice that they are ready to proceed to the next construction phase, or;

• that the punch list items have not been completed, in which case, the Contractor shall request another pre-final inspection and the steps described above are repeated until the VA determines the work is satisfactorily complete.

f. If the VA issues written notice that the punch list items have been completed and that the work is complete and the space is ready for occupancy and utilization, the Contractor shall notify the COR three weeks in advance of the proposed date of starting work in each specific area of the site, building or portion thereof.

H. Buildings No. 1W and 28 will be occupied during performance of work; but immediate areas of alterations will be vacated.

Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered.

Contractor shall permit access to Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment.

These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc to facilitate patient and staff access.

Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical

Center operations will continue during the construction period.

I. When a construction area is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain in operating condition existing fire protection and alarm equipment.

In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.

J. Utilities Services: Maintain existing utility services for Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, 03-01-20

01 00 00 -9

GENERAL REQUIREMENTS

wires, cables, etc. of utility services or of fire protection systems and communications systems

(including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems shall be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR

ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR

COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS

FOR ELECTRONIC SAFETY AND SECURITY for additional requirements.

2. Contractor shall submit a request to interrupt any such services to COR, in writing, 7 days n advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center.

Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system shall be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.

5. In case of a contract construction emergency, service will be interrupted on approval of COR.

Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the

Contractor.

K. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

03-01-20

01 00 00 -10

GENERAL REQUIREMENTS

L. To minimize interference of construction activities with flow of Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.

M. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF

ROADWAYS.

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting Officer. This report shall list by rooms and spaces:

1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of buildings.

2. Existence and conditions of items required by drawings to be either reused or relocated, or both.

3. Shall note any discrepancies between drawings and existing conditions at site.

4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR

52.243-4).

C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:

1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workers in executing work of this contract.

03-01-20

01 00 00 -11

GENERAL REQUIREMENTS

D. Protection: Provide the following protective measures:

1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.

3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

1.8 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

1.9 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work.

Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR.

Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged. Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.)

03-01-20

01 00 00 -12

GENERAL REQUIREMENTS

disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243-4) and "DIFFERING SITE CONDITIONS" (FAR 52.236-2).

1.10 PHYSICAL DATA

A. Data and information furnished or referred to below is for the Contractor's information. The

Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

1. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by Terracon.

B. Government does not guarantee that other materials will not be encountered nor that proportions, conditions or character of several materials will not vary from those indicated by explorations.

Bidders are expected to examine site of work and logs of borings; and, after investigation, decide for themselves character of materials and make their bids accordingly. Upon proper application to

Department of Veterans Affairs, bidders will be permitted to make subsurface explorations of their own at site.

1.11 PROFESSIONAL SURVEYING SERVICES

A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the Contractor shall perform services specified herein and in other specification sections. The

Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the

Contractor, and that the land surveyor or civil engineer has no financial interest in this contract.

1.12 AS-BUILT DRAWINGS

A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.

B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR‘s review, as often as requested.

03-01-20

01 00 00 -13

GENERAL REQUIREMENTS

C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.

D. Paragraphs A, B, & C shall also apply to all shop drawings.

1.13 WARRANTY MANAGEMENT

A. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of Construction in at least 30 days before the planned pre-warranty conference, submit one set of the warranty management plan. Include within the warranty management plan all required actions and documents to assure that the Government receives all warranties to which it is entitled. The plan shall be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesman, or of engineering background, not necessarily familiar with this contract. The term

“status” as indicated below shall include due date and whether item has been submitted or was approved. Warranty information made available during the construction phase shall be submitted to the Contracting Officer for approval prior to each monthly invoice for payment. Assemble approved information in a binder and turn over to the Government upon acceptance of the work.

The construction warranty period will begin on the date of the project acceptance and continue for the product warranty period. A joint 4 month and 9 month warranty inspection will be conducted, measured from time of acceptance, by the Contactor and the Contracting Officer.

Include in the warranty management plan, but not limited to, the following:

1. Roles and responsibilities of all personnel associated with the warranty process, including points of contact and telephone numbers within the company of the Contractor, subcontractors, manufacturers or suppliers involved.

2. Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest project location.

3. Listing and status of delivery of all Certificates of Warranty for extended warranty items, to include roofs, HVAC balancing, pumps, motors, transformers and for all commissioned systems such as fire protection and alarm systems, sprinkler systems and lightning protection systems, etc.

4. A list for each warranted equipment item, feature of construction or system indicating:

a. Name of item.

b. Model and serial numbers.

c. Location where installed.

d. Name and phone numbers of manufacturers and suppliers.

03-01-20

01 00 00 -14

GENERAL REQUIREMENTS

e. Name and phone numbers of manufacturers or suppliers.

f. Names, addresses and phone numbers of sources of spare parts.

g. Warranties and terms of warranty. Include one-year overall warranty of construction, including the starting date of warranty of construction. Items which have extended warranties shall be indicated with separate warranty expiration dates.

h. Starting point and duration of warranty period.

i. Summary of maintenance procedures required to continue the warranty in force.

j. Cross-reference to specific pertinent Operation and Maintenance manuals.

k. Organizations, names and phone numbers of persons to call for warranty service.

l. Typical response time and repair time expected for various warranted equipment.

5. The plans for attendance at the 4 and 9-month post construction warranty inspections conducted by the government.

6. Procedure and status of tagging of all equipment covered by extended warranties.

7. Copies of instructions to be posted near selected pieces of equipment where operation is critical for warranty and/or safety reasons.

B. Performance Bond: The Performance Bond shall remain effective throughout the construction period.

1. In the event the Contractor fails to commence and diligently pursue any construction warranty work required, the Contracting Officer will have the work performed by others, and after completion of the work, will charge the remaining construction warranty funds of expenses incurred by the Government while performing the work, including, but not limited to administrative expenses.

2. In the event sufficient funds are not available to cover the construction warranty work performed by the Government at the contractor’s expenses, the Contracting Officer will have the right to recoup expenses from the bonding company.

3. Following oral or written notification of required construction warranty repair work, the

Contractor shall respond in a timely manner. Written verification will follow oral instructions. Failure to respond will be cause for the Contracting Officer to proceed against the Contractor.

C. Pre-Warranty Conference: Prior to contract completion, and at a time designated by the

Contracting Officer, the Contractor shall meet with the Contracting Officer to develop a mutual understanding with respect to the requirements of this section. Communication procedures for

Contractor notification of construction warranty defects, priorities with respect to the type of defect, reasonable time required for Contractor response, and other details deemed necessary by

03-01-20

01 00 00 -15

GENERAL REQUIREMENTS

the Contracting Officer for the execution of the construction warranty will be established/ reviewed at this meeting. In connection with these requirements and at the time of the

Contractor’s quality control completion inspection, furnish the name, telephone number and address of a licensed and bonded company which is authorized to initiate and pursue construction warranty work action on behalf of the Contractor. This point of contract will be located within the local service area of the warranted construction, be continuously available and be responsive to

Government inquiry on warranty work action and status. This requirement does not relieve the

Contractor of any of its responsibilities in conjunction with other portions of this provision.

D. Contractor’s Response to Construction Warranty Service Requirements:

Following oral or written notification by the Contracting Officer, the Contractor shall respond to construction warranty service requirements in accordance with the “Construction Warranty

Service Priority List” and the three categories of priorities listed below. Submit a report on any warranty item that has been repaired during the warranty period. Include within the report the cause of the problem, date reported, corrective action taken, and when the repair was completed.

If the Contractor does not perform the construction warranty within the timeframe specified, the

Government will perform the work and back charge the construction warranty payment item established.

1. First Priority Code 1. Perform onsite inspection to evaluate situation, and determine course of action within 4 hours, initiate work within 6 hours and work continuously to completion or relief.

2. Second Priority Code 2. Perform onsite inspection to evaluate situation, and determine course of action within 8 hours, initiate work within 24 hours and work continuously to completion or relief.

3. Third Priority Code 3. All other work to be initiated within 3 work days and work continuously to completion or relief.

4. The “Construction Warranty Service Priority List” is as follows:

Code 1-Life Safety Systems

a. Fire suppression systems.

b. Fire alarm system(s).

c. Coolers and Freezers.

Code 1-Air Conditioning Systems

a. Air conditioning leak in part of the building, if causing damage.

b. Air conditioning system not cooling properly.

Code 1 Doors

03-01-20

01 00 00 -16

GENERAL REQUIREMENTS

a. Interior, exterior personnel doors or hardware, not functioning properly, causing security, fire or safety problem.

Code 3-Doors

a. Interior/exterior personnel doors or hardware not functioning properly.

Code 1-Electrical

a. Power failure (entire area or any building operational after 1600 hours).

b. Security lights.

c. Smoke detectors.

Code 2-Electrical

a. Power failure (no power to a room or part of building).

b. Receptacles and lights not operational (in a room or part of building).

Code 3-Electrical

a. Exterior lights not operational.

Code 1-Gas and Steam

a. Leaks and pipeline breaks.

Code 1-Heat

a. Power failure affecting heat.

Code 1-Plumbing

a. Hot water heater failure.

b. Leaking water supply pipes.

Code 2-Plumbing

a. Flush valves not operating properly

b. Fixture drain, supply line or any water pipe leaking.

c. Toilet leaking at base.

Code 3- Plumbing

a. Leaky faucets.

Code 3-Interior

a. Floors damaged.

b. Paint chipping or peeling.

c. Casework damaged.

Code 1-Roof Leaks

a. Damage to property is occurring.

Code 2-Water (Exterior)

a. No water to facility.

03-01-20

01 00 00 -17

GENERAL REQUIREMENTS

Code 2-Water (Hot)

a. No hot water in portion of building listed.

Code 3

a. All work not listed above.

E. Warranty Tags: At the time of installation, tag each warranted item with a durable, oil and water-resistant tag approved by the Contracting Officer. Attach each tag with a copper wire and spray with a silicone waterproof coating. Also submit two record copies of the warranty tags showing the layout and design. The date of acceptance and the QC signature shall remain blank until the project is accepted for beneficial occupancy. Show the following information on the tag.

1.14 USE OF ROADWAYS

A. For hauling, use only established public roads and roads on Medical Center property.

1.15 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to written approval and compliance with the following provisions:

1. Permission to use each unit or system shall be given by COR in writing. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the COR will withdraw permission for use of the equipment.

03-01-20

01 00 00 -18

GENERAL REQUIREMENTS

2. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e.