36C25023B0027 0002.pdf

PDF 388 KB Posted

Attached to
Z2DA--506-20-102 Upgrade Basement Building 1W (23NR9KA30)
Solicitation number
36C25023B0027
Issued by

About this file

This document provides details for an upcoming federal contract opportunity to renovate basement spaces at a Veterans Affairs medical center. The project involves upgrading approximately 14,000 square feet of existing basement and sub-basement areas to improve efficiency and functionality. Renovations will include mechanical, electrical, and plumbing system upgrades, as well as asbestos abatement. The solicitation is planned for release on March 20, 2023 as a total SDVOSB set-aside with an anticipated award date within 120 days of bid opening. The estimated value is between $1-5 million. Interested vendors must be SDVOSB certified and registered in SAM and VIP databases. The document instructs vendors to monitor the identified website for solicitation details and amendments.

View the file

Other files

File Type Posted
Notice of Award Contract 36C25024C0025 Oct 31 - 506-20-102.pdf PDF
36C25023B0027 0007.pdf PDF
36C25023B0027 0006.pdf PDF
14.15_E602 - PANELBOARD SCHEDULES RFI 28 - 506-20-102.pdf PDF
1-AE114 - PHASE A5 NEW WORK PLAN RFI 29 - 506-20-102.pdf PDF
105126 Plastic Lockers for RFI 29 Answer - 506-20-102.pdf PDF
1-AE112 - PHASE A3 NEW WORK PLAN RFI 29 - 506-20-102.pdf PDF
123100 Metal Casework for RFI 29 Answer - 506-20-102.pdf PDF
000110 TOC for RFI 29 Answer - 506-20-102.pdf PDF
36C25023B0027 0005.pdf PDF
14.03_1-EP101 - BASEMENT POWER PLAN - NEW WORK - RFI 28 - 506-20-102.pdf PDF
36C25023B0027 0004.pdf PDF
S04 - Pre-Bid 2nd Site Visit Agenda - 506-20-102.pdf PDF
S04 - Pre Bid 2nd Site Visit Attendance Log - 506-20-102 signed.pdf PDF
BID SPECIFICATIONS 2023-0510 Update - 506-20-102.pdf PDF
36C25023B0027 0003.pdf PDF
Addendum 01 Section 11 41 21 - 506-20-102.pdf PDF
RFI No. 14 Drawing Q and A - 506-20-102.pdf PDF
Asbestos Assessment-07.2022 - 506-20-102.pdf PDF
Addendum 01 Section 11 73 00 - 506-20-102.pdf PDF
Addendum 01 Section 01 00 00 - 506-20-102.pdf PDF
S04 - Pre-Bid Walk Through Attendance Sheet signed - 506-20-102.pdf PDF
36C25023B0027 0001 - 506-20-102.pdf PDF
S04 - Pre-Bid Site Visit Agenda signed - 506-20-102.pdf PDF
RFI Form - 506-20-102.pdf PDF
EMR Certification Form - 506-20-102.pdf PDF
Brand Name Only Justification Security Cameras - 506-20-102.pdf PDF
Brand Name Only Justification Fire Alarm System - 506-20-102.pdf PDF
Brand Name Only Justification Nuclear Storage Flooring - 506-20-102.pdf PDF
Drawings - 506-20-102.pdf PDF
Brand Name Only Justification Building Controls - 506-20-102.pdf PDF
36C25023B0027 Apr 6 - 506-20-102.pdf PDF
SPECIFICATIONS 2023-0405 - 506-20-102.pdf PDF
Wage Determination MI20230101 Feb 24 - 506-20-102.pdf PDF
36C25023B0027.docx DOCX document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25023B0027 – P0002 – 506-20-102 – Upgrade Basement Building 1W – Ann Arbor VAMC

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 5

0002 04-27-2023 506-20-102

36C250

Department of Veterans Affairs

Network Contracting Office (NCO) 10

5500 Armstrong Rd., Bldg. 9 Rm. 105

Battle Creek MI 49037

36C250

Department of Veterans Affairs

Network Contracting Office (NCO) 10

24 Frank Lloyd Wright Dr. Lobby M2200

Ann Arbor MI 48105

To all Offerors/Bidders 36C25023B0027

04-27-2023 X

X X

**HOUR & DATE for Receipt of Offers is EXTENDED to:***May 30, 2023, at 1:00pm***

X 1

The purpose of this Amendment is:

1. To provide responses to the Request for Information (RFIs).

2. To change the Bid Opening Date to May 30, 2023,at 1:00pm

3. To add a second Site Visit to be held May 4 at 11:00am. Ann Arbor VAMC, 2215 Fuller Rd., Bldg. 3 Room 106A

End of Amendment 0002

SCOTT D. BRENNAN

Contracting Specialist

NCO1115LE-0962

Question 1: Is there any off-hours work?

Answer 1: Yes, reference to Nights and Weekend work can be found at note #10 on sheet M-

001 in reference to utility shutdown and Sheets 28-AD111, 28-AD141, 1- AE101, and 28-

AE111 for mechanical shutdown within Phase A2.

Question 2: Will there be a second Site Visit?

Answer 2: There will be a second Pre-Bid Site Visit. It is scheduled for May 4, 2023, at

11:00am. Location: Ann Arbor VAMC, 2215 Fuller Rd., Building 3, Room 106A, 48105

Question 3: On the drawings it is shown where our staging area is at as well as job trailer, are we allowed to park their as well?

Answer 3: Contractors will not be allowed to park at the staging area/job trailer location shown on the plans. See Specifications 01 00 00 General Requirements Part 1.5(E) for parking requirements. See Addendum 01 Section 01 00 00 – 506-20-102 for further clarification.

Question 4: Is the paint to be considered lead based and treated as that for demo? Answer 4:

The Contractor will have to comply with OSHA for all hazardous materials encountered, including lead in any amount. Because the existing report was limited to identifying quantities above 5,000 ppm (XRF analyzer), to comply with OSHA the Contractor should presume paint is lead-containing unless tested to not contain lead by the Contractor during construction.

Question 5: Are we to move all the boxes of material from the original electrical shop to the new electrical shop on the 10th floor, or is it just the shelfs themselves?

Answer 5: Loose items like boxes, equipment, etc. will be moved by VA personnel.

Contractor will need to give Three (3) weeks’ notice prior to beginning demolition in Phase

A2 so the VA can move items. See drawing notes on 28-AD111 for items that are to be removed by the Contractor. Unless noted otherwise, these items are not being relocated, just removed (e.g., Notes 19, 20, 21, etc.).

Question 6: Can you please provide us with a correct wage determination?

Answer 6: If there is an update to Wage Determination MI20230101 it will be posted in an

Amendment.

Question 7: Has an Asbestos Survey been performed?

Answer 7: A campus-wide asbestos survey was performed in 2019 and is referenced in the

Division 2 Asbestos specifications. What is not covered in this report will be an unforeseen condition during construction. See Asbestos Assessment-07.2022 –506-20-102

Question 8: On drawing 1-AE114 drawing note 4 it calls for a handrail/crash rail combo, but it doesn't specify what it is.

Answer 8: Note 4 on 1-AE114 calls for a RESILIENT WALL GUARD HANDRAIL

COMBINATION. Specification 10 26 00 Wall and Door Protection, Part 2.3.A shows requirements for "Resilient Wall Guards and Handrails"... Item 1 of this section if for "Handrail/Wall Guard Combination". Detail 10 on sheet 28-AE311 shows what this combination product looks like, including dimensions.

Question 9: On drawing 1-AE116 drawing note 11 it calls out a stainless-steel wall mounted guard object, is there a detail on this so that I can see what it looks like? Answer 9: A detail was not provided. However, installation will be similar to Detail 10 on sheet 28-AE311. The intent is that devices such as card readers are not ripped off the wall when a passing cart gets too close to the wall. A stainless-steel wedge/curve of some sort (as dimensioned) would suffice. These features are entirely serving non- patient space and are for functional purposes.

There are several options for wall guards that curve back to the wall and protrude 3" from the wall, thus meeting the intent. Install per manufacturer’s requirements.

Question 10: Will CPIH be required on this project? If so, to what extent? Survey? Air

Monitoring?

Answer 10: Specification 02 82 11, Part 1.5.2 shows the responsibilities of the Contractor regarding Asbestos Abatement and shows the contractor will need to provide a CIH. See definition of CPIH/CIH. Part 2.2 describes monitoring, inspection , and testing. Contractor must comply with OSHA and additional specifications not mentioned within this response.

Question 11: Is there DOAS-1 or 1-AHU-1 scheduled?

Answer 11: DOAS-1 is scheduled on sheet M601 (Air Handling Unit Schedule). 1-AHU- 2 is also in this schedule. There is not a 1-AHU-1 in this project.

Question 12: Part 2 Products/Section 2.2 Lift Unit/B-1, Page: 11 73 00-3. Will an 800 lb. lift be acceptable for the morgue?

Answer 12: A 800 lb. lift is acceptable. Refer to 2.2 LIFT UNIT in attachment Addendum 01

Section 11 73 00 – 506-20-102.

Question 13: Part 2 Products/Section 2.5 Charger A. Charger, Page 11 73 00-4. Is the VA looking for a wall charger, or in-rail charging for the patient lifts?

Answer 13: In-rail charging. Refer to 2.5 CHARGER in the attachment Addendum 01 Section

11 73 00 – 506-20-102.

Question 14: Please clarify the intent: Attached are snips from Three (3) separate drawing that all relate to the same are in the building. The demolition drawing shows key note #3, ceiling and grid demolition. The RCP shows new ceiling. The Fire Protection drawing appears to identify adding a dry pendant sprinkler head in the new morgue cooler. Is the fire protection contractor to interpret the variation of patterns (shown in the fire protection legend) as the full area to consider rework and revision of the fire suppression system?

Answer 14: Please note, first snip is showing demolition in Phase A3, and the next two snips are showing new work in Phase A2 (not the same areas). The fire protection drawings show a dry pendant head in the morgue cooler, yes. Full fire protection criteria is shown on sheets

1-FX101, 28-FX101, and specifications. Criteria documents provided are to assist contractor with the modification of the existing system to accommodate the new architectural layout.

Fire protection design will be sealed by a fire protection engineer by the Contractor.

ATTACHMENTS:

See attached document: RFI No. 14 Drawing Q and A - 506-20-102.

See attached document: Addendum 01 Section 11 73 00 - 506-20-102.

See attached document: Addendum 01 Section 01 00 00 - 506-20-102.

See attached document: Addendum 01 Section 11 41 21 - 506-20-102.

See attached document: Asbestos Assessment-07.2022 - 506-20-102.

File details come from the government source that posted it. Updated .