14.03_1-EP101 - BASEMENT POWER PLAN - NEW WORK - RFI 28 - 506-20-102.pdf

PDF 727 KB Posted

Attached to
Z2DA--506-20-102 Upgrade Basement Building 1W (23NR9KA30)
Solicitation number
36C25023B0027
Issued by

About this file

This pre-solicitation notice announces the Department of Veterans Affairs' intent to issue an invitation for bids for an interior renovation project at the LTC Charles S. Kettles Veterans Administration Medical Center in Ann Arbor, Michigan. The project scope includes approximately 14,000 square feet of existing basement, sub-basement, electrical shop, and recreation therapy office space renovations to improve efficiency, layout, flow and function of the spaces. Mechanical, electrical and plumbing systems will be upgraded and asbestos abatement is included. The estimated cost is between $1,000,000 and $5,000,000. The NAICS code is 236220 and size standard is $45 million. The solicitation is set aside for qualified Service-Disabled Veteran Owned Small Businesses. The invitation for bid is planned for release on March 20, 2023 via SAM.gov. The resulting contract will be a firm fixed price award within 120 days of bid opening. Offerors must be registered in SAM.gov and Vendor Information Pages to be considered and the eventual awardee must have a current VETS-4212 report on file if applicable. Questions should be directed to the specified contracting officer by email.

View the file

Other files

File Type Posted
Notice of Award Contract 36C25024C0025 Oct 31 - 506-20-102.pdf PDF
36C25023B0027 0007.pdf PDF
36C25023B0027 0006.pdf PDF
14.15_E602 - PANELBOARD SCHEDULES RFI 28 - 506-20-102.pdf PDF
1-AE114 - PHASE A5 NEW WORK PLAN RFI 29 - 506-20-102.pdf PDF
105126 Plastic Lockers for RFI 29 Answer - 506-20-102.pdf PDF
1-AE112 - PHASE A3 NEW WORK PLAN RFI 29 - 506-20-102.pdf PDF
123100 Metal Casework for RFI 29 Answer - 506-20-102.pdf PDF
000110 TOC for RFI 29 Answer - 506-20-102.pdf PDF
36C25023B0027 0005.pdf PDF
36C25023B0027 0004.pdf PDF
S04 - Pre-Bid 2nd Site Visit Agenda - 506-20-102.pdf PDF
S04 - Pre Bid 2nd Site Visit Attendance Log - 506-20-102 signed.pdf PDF
BID SPECIFICATIONS 2023-0510 Update - 506-20-102.pdf PDF
36C25023B0027 0003.pdf PDF
Addendum 01 Section 11 41 21 - 506-20-102.pdf PDF
36C25023B0027 0002.pdf PDF
RFI No. 14 Drawing Q and A - 506-20-102.pdf PDF
Asbestos Assessment-07.2022 - 506-20-102.pdf PDF
Addendum 01 Section 11 73 00 - 506-20-102.pdf PDF
Addendum 01 Section 01 00 00 - 506-20-102.pdf PDF
S04 - Pre-Bid Walk Through Attendance Sheet signed - 506-20-102.pdf PDF
36C25023B0027 0001 - 506-20-102.pdf PDF
S04 - Pre-Bid Site Visit Agenda signed - 506-20-102.pdf PDF
RFI Form - 506-20-102.pdf PDF
EMR Certification Form - 506-20-102.pdf PDF
Brand Name Only Justification Security Cameras - 506-20-102.pdf PDF
Brand Name Only Justification Fire Alarm System - 506-20-102.pdf PDF
Brand Name Only Justification Nuclear Storage Flooring - 506-20-102.pdf PDF
Drawings - 506-20-102.pdf PDF
Brand Name Only Justification Building Controls - 506-20-102.pdf PDF
36C25023B0027 Apr 6 - 506-20-102.pdf PDF
SPECIFICATIONS 2023-0405 - 506-20-102.pdf PDF
Wage Determination MI20230101 Feb 24 - 506-20-102.pdf PDF
36C25023B0027.docx DOCX document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

DN

EM

EM

GF

GF

EM

A

A

EM

EM

EM

J

FRZ

EM

EMEM

EM

UM

G

H

Kl L N O P Q R T19

H.2 H.7

H.9H.1G.9G.7

D.1 E.2 F.1C.1

BB

BBA

RBB-1CRBB-1

CLBB-1

LSBB-1

LBB-1

CLBC-1

RBC-1

RBC-2

CRBC-1

EMBC-1

LBC-1

LSBC-1

LSBD-1 LBD-1

CLBD-1

RBD-1

RBD-2

CRBD-1

PBA

ATSB-C1

TCRC

ATSB-B1

TCRB

ATSB-A1

TCRA

ATSB-D1

TCRD

LINEN CACHE

BB50C

DOCK CORRIDOR WEST

C3.5

NORTH CORRIDOR - EAST

B1W.31

NORTH CORRIDOR - EAST

B1W.31

CANTEEN RETAIL

BB07BIO MED

BB05

CANTEEN DRY

BB09

N&FS DRY

BB18

MECHANICAL

AB21A

N&FS COOLER

BB18B

STORAGE

AB21

EMERGENCY PREP STORAGE

AB31

NUCLEAR WASTE STORAGE

AB46

SLIDE STORAGE

AB43

RBC-1 - 28

RBC-1 - 28

RBC-1 - 28

RBC-1 - 29

RBC-1 - 29

RBC-1 - 29

RBC-1 - 28

RBC-1 - 28

RBC-1 - 29

RBC-1 - 29

RBC-1 - 25

RBC-1 - 25

RBC-1 - 32

RBC-1 - 32

RBC-1 - 32

RBD-1 - 12

RBD-1 - 12 RBD-1 - 12

RBD-1 - 12

RBD-1 - 12

RBD-1 - 8

RBD-1 - 8

RBD-1 - 6

RBD-1 - 6

RBD-1 - 6

RBD-1 - 2

RBD-1 - 2

RBD-1 - 4

RBD-1 - 4

RBD-1 - 4

RBD-1 - 4

CRBD-1 - 36

CRBD-1 - 36

CANTEEN FREEZER

BB09B

SOUTH CORRIDOR - WEST

C1

N&FS FREEZER

BB18A

CANTEEN COOLER

BB09A

DOCK CORRIDOR EAST

C3.5

CRBD-1 - 36

RBD-1 - 2

DOOR HEATER

POWER

DOOR

HEATER

POWER

CLBD-2 - 5,7,9

CLBD-2 - 10,12,14

CLBD-2 - 2,4

CLBD-2 - 1,3

CLBD-2 - 8

CLBD-2 - 17,19,21

UC-3

CLBD-2 - 16

WCCU-15

WCCU-4

WCCU-2

UC-2

WCCU-1

UC-4, DEFROST HEATER

UC-4, FAN

UC-1

UC-1, DEFROST HEATER

CLBD-2 - 11,13,15

CLBD-2

CLBD XFMR

CLBD-2 - 23,25

CLBD-2 - 18,20

LIGHT INTEGRAL WITH UNIT

LIGHT INTEGRAL WITH UNIT

LIGHT INTEGRAL WITH UNIT

LIGHT INTEGRAL WITH UNIT

CLBD-2 - 8

CLBD-2 - 16

CLBD-2 - 6

CLBD-2 - 6

CLBD-2 - 26

CLBD-2 - 26

UC-4, FAN

CLBD-2 - 23,25

CANTEEN VENDING

BB13

RBC-1 - 28

RBD-1 - 4

UC-2

CLBD-2 - 8

UC-4, DEFROST HEATER

CLBD-2 - 18,20

H.3H.4

LSBD-2

LSBD XFMR

LSBD-2 - 1

LSBD-2 - 6

LSBD-2 - 2

LSBD-2 - 5

LSBD-2 - 3

LSBD-2 - 7

STORAGE

BB06

CRBD-1 - 32

CRBD-1 - 32

CRBD-1 - 32

Space

B1W.13D

P-3A

CLBD-2 - 28

CRBD-1 - 2

EX EX

EX

EX EX

EX

EX

EX

EX

EX

EX

EX

EX

EX

EX

EX

EX

EX

EX

EX

EX

EX

EX EX

EX

EX

EX

EX

EF-3

CLBD-2 - 31

EF-5

IT

AB33J

CRBD-1 - 35

EX

EX EX

CRBD-1 - 34

P-3A

CLBD-2 - 30

UC

CLBD-2 - 6HEAT TAPE

SOUTH CORRIDOR - EAST

C1

APPROXIMATE LOCATION OF

EXISTING PANELBOARD R2B

ON SECOND FLOOR.

REMOVE SCOPE AS

PART OF DEDUCT

ALTERNATE #1

RBC-1 - 25

CRBB-1 - 30

RBC-1 - 257

CRBB-1 - 30

RBC-1 - 34

RBC-1 - 34

F

G

H

H.2

13.2

F

G

H

H.2

13.2

EF-6

(E) 1W-AH-21

R2B-3 - 26,28,30

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs

\j b o n b \D o c u m e n ts

\R e v it L o c a l F ile s \2

\A n n A rb o r B ld g

W B a s e m e n t_

M E

P ja c k .b o n b ri g h tT

D B

.r v t

/1

/2

:5

:5

P

M

1-EP101

BASEMENT POWER PLAN - NEW

WORK

01/13/2023 JB HT

UPGRADE BASEMENT,

BUILDING 1 WEST

506-20-102

ANN ARBOR, MICHIGAN

BID DOCUMENTS

1W

ANN ARBOR VA

MEDICAL

CENTER Approved: Veteran's Affairs Medical Center

1/8" = 1'-0"

BASEMENT POWER PLAN - NEW WORK

G E N E R A L N O T E S

A. BUILDINGS 1W AND 28 ARE ON BACKUP POWER.

B. SEE SHEET 1-AE110 FOR PROCUREMENT LEGEND.

D R A W I N G N O T E S :

1 ALL RECEPTACLES IN ROOM TO BE EXPLOSION-PROOF.

2 POWER TO ACCESS CONTROL PANEL MOUNTED ABOVE DOORFRAME.

3 NEW 480V-208Y/120V, 45 KVA TRANSFORMER. MOUNT UP HIGH IN ROOM.

4 PROVIDE 120V CONNECTION TO REFRIGERATION MONITOR CONTROL PANEL. COORDINATE EXACT LOCATION OF

PANEL WITH DIV 23.

5 CIRCUIT NEW EMERGENCY RECEPTACLE TO EXISTING LOCAL CRITICAL RECEPTACLE CIRCUIT.

6 RE-ROUTE AND RELOCATE EXISTING WIRING, JUNCTION BOXES AND CONDUIT IN THIS AREA FOR INSTALLATION OF NEW SUPPLY DUCT. COORDINATE WITH DIVISION 23. RE-ROUTE AND RELOCATE EXISTING WIRING, JUNCTION BOXES AND CONDUIT IN THIS AREA FOR INSTALLATION OF NEW SUPPLY DUCT. COORDINATE WITH DIVISION 23.

7 PROVIDE SURFACE MOUNTED "WIREMOLD" STYLE MOUNTED AT 46" AFF. PROVIDE "WIREMOLD" STYLE WITH DUPLEX

RECEPTACLES SPACED 18" ON CENTER.

8 PROVIDE 120V/1PH CONNECTION TO HEAT TAPE. VERIFY EXACT CONNECTION TYPE AND LOCATION WITH FREEZER

MANUFACTURER.

9 FROM THE 100A/3P BREAKER IN PANEL CLBD-1. PRIMARY TO TRANSFORMER, 3#2 AWG, #8 GROUND, 1-1/4" C.

SECONDARY FROM TRANSFORMER TO PANEL CLBD-2, 4# 1/0 AWG, #6 GROUND, 2"C.

10 FROM THE 100A/3P BREAKER IN PANEL CLBD-1. PRIMARY TO TRANSFORMER, 3#2 AWG, #8 GROUND, 1-1/4" C.

SECONDARY FROM TRANSFORMER TO PANEL CLBD-2, 4# 1/0 AWG, #6 GROUND, 2"C.

KEYPLAN

N

AREA OF WORK

1/8" = 1'-0"

2ND FLOOR ROOF PLAN

01/13/2023No. Revisions: Date:

BID DOCUMENTS 01/13/2023

ADDENDUM 02 05/17/2023

Sheets
1-EP101 - BASEMENT POWER PLAN - NEW WORK

File details come from the government source that posted it. Updated .