1-AE114 - PHASE A5 NEW WORK PLAN RFI 29 - 506-20-102.pdf
PDF 246 KB Posted
- Solicitation number
- 36C25023B0027
About this file
This document includes a pre-solicitation notice and project description for an upcoming federal contract opportunity to renovate basement spaces at a Veterans Affairs medical center. The pre-solicitation notice provides details about a planned invitation for bids for Project 506-20-102 to upgrade approximately 14,000 square feet of existing basement, sub-basement, electrical shop, and recreation therapy office space at the LTC Charles S. Kettles Veterans Administration Medical Center in Ann Arbor, Michigan. The renovation will improve layout, workflow, and upgrade mechanical, electrical and plumbing systems. Asbestos abatement is also included. The contract is estimated between $1-5 million and will be a firm fixed price award. The NAICS code is 236220 and size standard is $45 million. The opportunity is a total small business set-aside for service-disabled veteran-owned small businesses. The solicitation is expected to be issued on March 20, 2023 via SAM.gov and all questions should be directed to the named contracting specialist.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P Q
2' - 2 1/2" +/-
9' - 11"
UP
H O
L D
/4
1 2
TYP.
330 SF
STORAGE
AB21
380 SF
MECHANICAL
AB21A
264 SF
EMERGENCY
PREP STORAGE
AB31
299 SF
N&FS COOLER
BB20
1017 SF
N&FS DRY
BB18
ELEC.
AB35
STAIR #5
1122 SF
SOUTH
CORRIDOR -
WEST
C1
337 SF
CANTEEN
FREEZER
BB13B
7.9A
9.3
4 44
T2
6 6
3'
1/
2"
3' - 9 3/4"
PHASE A5
CONTRACTOR SHALL PROVIDE FOUR-MONTH'S NOTICE TO VA C.O.R. PRIOR TO DEMOLITION OF
THIS SPACE FOR PROPER DECOMMISSIONING OF THE EXISTING RADIATION SAFETY SPACES.
RELOCATE AND DEMOLISH EXISTING ROOMS AND ASSOCIATED ITEMS PER SHEET 1-AD114:
RADIATION SAFETY STORAGE (AB31), RADIATION SAFETY STORAGE (AB33).
PROVIDE NEW ROOMS AND ASSOCIATED WORK PER SHEETS 1-AE114, 1-AC142, 1-AC143: SOUTH
CORRIDOR -WEST, EMERGENCY PREP STORAGE, MECHANICAL, SLIDE STORAGE.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\q u in n \D o c u m e n ts \A n n
A rb o r
B ld g
W B a s e m e n t (2 p a tr ic k .q u in n F
B N
E U
.r v t
/1
/2
:1
:2
P
M
1-AE114
PHASE A5 NEW WORK PLAN
01/13/2023 PQ JK
UPGRADE BASEMENT,
BUILDING 1 WEST
506-20-102
ANN ARBOR, MICHIGAN
BID DOCUMENTS
1W
ANN ARBOR VA
MEDICAL
CENTER Approved: Veteran's Affairs Medical Center
1 REMOVE PREFABRICATED TEMPORARY WALL AT CONCLUSION OF WORK IN THIS AREA -
PATCH AND REPAIR ANY DISTURBED FINISHES TO MATCH EXISTING ADJACENT.
2 CONTRACTOR SHALL PROTECT EXISTING FLOORING TO REMAIN IN THIS SPACE - REPAIR
ANY DAMAGED FINISHES AT CONCLUSION OF PHASE.
3 STAINLESS STEEL CORNER GUARD.
4 RESILIENT WALL GUARD HANDRAIL COMBINATION INSTALLED AT 2'-10" A.F.F.
5 TEMPORARY CONSTRUCTION SIGNAGE - SEE DETAIL 4/GI003. INSTALL SIGNAGE
TEMPORARILY SECURED TO DOOR AT 5'-0" A.F.F. REMOVE AT CONCLUSION OF
CONSTRUCTION PHASE.
6 INFILL OPENING WITH CMU. MATCH EXISTING INTERIOR FINISH.
G E N E R A L N O T E S
A. NEW WALLS ARE SHOWN AS SOLID DARK LINES.
B. SEE SHEET 1-AE101 FOR OVERALL NEW WORK AND PHASING PLAN.
C. CONTRACTOR SHALL VERIFY COOLER/FREEZER MANUFACTURE CLEARANCE
REQUIREMENTS. ALL COOLER/FREEZER DIMENSIONS ARE PLUS OR MINUS VERIFY IN FIELD.
D. ALL ITEMS ARE CONTRACTOR FURNISHED AND INSTALLED (CC) UNLESS NOTED OTHERWISE.
E. ALL CONSTRUCTION WORK AREAS SHALL BE SEPARATED FROM PUBLIC AND STAFF AREAS.
UNLESS NOTED OTHERWISE ON DRAWINGS OR SPECIFICATIONS, PROVIDE FIRE-RETARDANT
SHEET PLASTIC SMOKE BARRIERS TO MEET INFECTION CONTROL REQUIREMENTS OF
SPECIFICATION SECTION 01 35 26 - SAFETY REQUIREMENTS.
F. COORDINATE CONSTRUCTION BARRIERS IN CORRIDOR TO MAINTAIN EGRESS – DO NOT SHUT
DOWN MORE THAN ONE CORRIDOR AT A TIME ACROSS PHASE.
G. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS UNLESS NOTED OTHERWISE.
H. ALL COLUMN WRAPS SHALL BE HELD NO MORE THAN 1/2" OFF COLUMNS UNLESS NOTED
OTHERWISE. REPORT TO C.O.R. AND ARCHITECT WHERE EXISTING CONDITIONS IMPACT
ABILITY TO COMPLY.
I. DASH PATTERNS ON WALLS INDICATE LEVELS OF FIRE RESISTANT CONSTRUCTION - SEE
SHEET GI001 FOR FIRE RATING.
J. ALL WORK SHALL FOLLOW ICRA LEVEL III REQUIREMENTS UNLESS NOTED OTHERWISE. ICRA
LEVEL IV REQUIREMENTS SHALL BE REQUIRED AT ASBESTOS ABATEMENT. SEE ASBESTOS
ABATEMENT SPECIFICATIONS FOR REQUIREMENTS.
KEYPLAN
D R A W I N G N O T E S
1/4" = 1'-0"
ENLARGED NEW WORK PLAN - PHASE A5
P H A S I N G N O T E S
No. Revisions: Date:
BID DOCUMENTS 01/13/2023
1 ADDENDUM 02 05/17/2023
| Sheets |
| 1-AE112 - PHASE A3 NEW WORK PLAN |
| 1-AE114 - PHASE A5 NEW WORK PLAN |
File details come from the government source that posted it. Updated .