1-AE114 - PHASE A5 NEW WORK PLAN RFI 29 - 506-20-102.pdf

PDF 246 KB Posted

Attached to
Z2DA--506-20-102 Upgrade Basement Building 1W (23NR9KA30)
Solicitation number
36C25023B0027
Issued by

About this file

This document includes a pre-solicitation notice and project description for an upcoming federal contract opportunity to renovate basement spaces at a Veterans Affairs medical center. The pre-solicitation notice provides details about a planned invitation for bids for Project 506-20-102 to upgrade approximately 14,000 square feet of existing basement, sub-basement, electrical shop, and recreation therapy office space at the LTC Charles S. Kettles Veterans Administration Medical Center in Ann Arbor, Michigan. The renovation will improve layout, workflow, and upgrade mechanical, electrical and plumbing systems. Asbestos abatement is also included. The contract is estimated between $1-5 million and will be a firm fixed price award. The NAICS code is 236220 and size standard is $45 million. The opportunity is a total small business set-aside for service-disabled veteran-owned small businesses. The solicitation is expected to be issued on March 20, 2023 via SAM.gov and all questions should be directed to the named contracting specialist.

View the file

Other files

File Type Posted
Notice of Award Contract 36C25024C0025 Oct 31 - 506-20-102.pdf PDF
36C25023B0027 0007.pdf PDF
36C25023B0027 0006.pdf PDF
14.15_E602 - PANELBOARD SCHEDULES RFI 28 - 506-20-102.pdf PDF
105126 Plastic Lockers for RFI 29 Answer - 506-20-102.pdf PDF
1-AE112 - PHASE A3 NEW WORK PLAN RFI 29 - 506-20-102.pdf PDF
123100 Metal Casework for RFI 29 Answer - 506-20-102.pdf PDF
000110 TOC for RFI 29 Answer - 506-20-102.pdf PDF
36C25023B0027 0005.pdf PDF
14.03_1-EP101 - BASEMENT POWER PLAN - NEW WORK - RFI 28 - 506-20-102.pdf PDF
36C25023B0027 0004.pdf PDF
S04 - Pre-Bid 2nd Site Visit Agenda - 506-20-102.pdf PDF
S04 - Pre Bid 2nd Site Visit Attendance Log - 506-20-102 signed.pdf PDF
BID SPECIFICATIONS 2023-0510 Update - 506-20-102.pdf PDF
36C25023B0027 0003.pdf PDF
Addendum 01 Section 11 41 21 - 506-20-102.pdf PDF
36C25023B0027 0002.pdf PDF
RFI No. 14 Drawing Q and A - 506-20-102.pdf PDF
Asbestos Assessment-07.2022 - 506-20-102.pdf PDF
Addendum 01 Section 11 73 00 - 506-20-102.pdf PDF
Addendum 01 Section 01 00 00 - 506-20-102.pdf PDF
S04 - Pre-Bid Walk Through Attendance Sheet signed - 506-20-102.pdf PDF
36C25023B0027 0001 - 506-20-102.pdf PDF
S04 - Pre-Bid Site Visit Agenda signed - 506-20-102.pdf PDF
RFI Form - 506-20-102.pdf PDF
EMR Certification Form - 506-20-102.pdf PDF
Brand Name Only Justification Security Cameras - 506-20-102.pdf PDF
Brand Name Only Justification Fire Alarm System - 506-20-102.pdf PDF
Brand Name Only Justification Nuclear Storage Flooring - 506-20-102.pdf PDF
Drawings - 506-20-102.pdf PDF
Brand Name Only Justification Building Controls - 506-20-102.pdf PDF
36C25023B0027 Apr 6 - 506-20-102.pdf PDF
SPECIFICATIONS 2023-0405 - 506-20-102.pdf PDF
Wage Determination MI20230101 Feb 24 - 506-20-102.pdf PDF
36C25023B0027.docx DOCX document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P Q

2' - 2 1/2" +/-

9' - 11"

UP

H O

L D

/4

1 2

TYP.

330 SF

STORAGE

AB21

380 SF

MECHANICAL

AB21A

264 SF

EMERGENCY

PREP STORAGE

AB31

299 SF

N&FS COOLER

BB20

1017 SF

N&FS DRY

BB18

ELEC.

AB35

STAIR #5

1122 SF

SOUTH

CORRIDOR -

WEST

C1

337 SF

CANTEEN

FREEZER

BB13B

7.9A

9.3

4 44

T2

6 6

3'

1/

2"

3' - 9 3/4"

PHASE A5

CONTRACTOR SHALL PROVIDE FOUR-MONTH'S NOTICE TO VA C.O.R. PRIOR TO DEMOLITION OF

THIS SPACE FOR PROPER DECOMMISSIONING OF THE EXISTING RADIATION SAFETY SPACES.

RELOCATE AND DEMOLISH EXISTING ROOMS AND ASSOCIATED ITEMS PER SHEET 1-AD114:

RADIATION SAFETY STORAGE (AB31), RADIATION SAFETY STORAGE (AB33).

PROVIDE NEW ROOMS AND ASSOCIATED WORK PER SHEETS 1-AE114, 1-AC142, 1-AC143: SOUTH

CORRIDOR -WEST, EMERGENCY PREP STORAGE, MECHANICAL, SLIDE STORAGE.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs

\q u in n \D o c u m e n ts \A n n

A rb o r

B ld g

W B a s e m e n t (2 p a tr ic k .q u in n F

B N

E U

.r v t

/1

/2

:1

:2

P

M

1-AE114

PHASE A5 NEW WORK PLAN

01/13/2023 PQ JK

UPGRADE BASEMENT,

BUILDING 1 WEST

506-20-102

ANN ARBOR, MICHIGAN

BID DOCUMENTS

1W

ANN ARBOR VA

MEDICAL

CENTER Approved: Veteran's Affairs Medical Center

1 REMOVE PREFABRICATED TEMPORARY WALL AT CONCLUSION OF WORK IN THIS AREA -

PATCH AND REPAIR ANY DISTURBED FINISHES TO MATCH EXISTING ADJACENT.

2 CONTRACTOR SHALL PROTECT EXISTING FLOORING TO REMAIN IN THIS SPACE - REPAIR

ANY DAMAGED FINISHES AT CONCLUSION OF PHASE.

3 STAINLESS STEEL CORNER GUARD.

4 RESILIENT WALL GUARD HANDRAIL COMBINATION INSTALLED AT 2'-10" A.F.F.

5 TEMPORARY CONSTRUCTION SIGNAGE - SEE DETAIL 4/GI003. INSTALL SIGNAGE

TEMPORARILY SECURED TO DOOR AT 5'-0" A.F.F. REMOVE AT CONCLUSION OF

CONSTRUCTION PHASE.

6 INFILL OPENING WITH CMU. MATCH EXISTING INTERIOR FINISH.

G E N E R A L N O T E S

A. NEW WALLS ARE SHOWN AS SOLID DARK LINES.

B. SEE SHEET 1-AE101 FOR OVERALL NEW WORK AND PHASING PLAN.

C. CONTRACTOR SHALL VERIFY COOLER/FREEZER MANUFACTURE CLEARANCE

REQUIREMENTS. ALL COOLER/FREEZER DIMENSIONS ARE PLUS OR MINUS VERIFY IN FIELD.

D. ALL ITEMS ARE CONTRACTOR FURNISHED AND INSTALLED (CC) UNLESS NOTED OTHERWISE.

E. ALL CONSTRUCTION WORK AREAS SHALL BE SEPARATED FROM PUBLIC AND STAFF AREAS.

UNLESS NOTED OTHERWISE ON DRAWINGS OR SPECIFICATIONS, PROVIDE FIRE-RETARDANT

SHEET PLASTIC SMOKE BARRIERS TO MEET INFECTION CONTROL REQUIREMENTS OF

SPECIFICATION SECTION 01 35 26 - SAFETY REQUIREMENTS.

F. COORDINATE CONSTRUCTION BARRIERS IN CORRIDOR TO MAINTAIN EGRESS – DO NOT SHUT

DOWN MORE THAN ONE CORRIDOR AT A TIME ACROSS PHASE.

G. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR

FILTRATION UNITS UNLESS NOTED OTHERWISE.

H. ALL COLUMN WRAPS SHALL BE HELD NO MORE THAN 1/2" OFF COLUMNS UNLESS NOTED

OTHERWISE. REPORT TO C.O.R. AND ARCHITECT WHERE EXISTING CONDITIONS IMPACT

ABILITY TO COMPLY.

I. DASH PATTERNS ON WALLS INDICATE LEVELS OF FIRE RESISTANT CONSTRUCTION - SEE

SHEET GI001 FOR FIRE RATING.

J. ALL WORK SHALL FOLLOW ICRA LEVEL III REQUIREMENTS UNLESS NOTED OTHERWISE. ICRA

LEVEL IV REQUIREMENTS SHALL BE REQUIRED AT ASBESTOS ABATEMENT. SEE ASBESTOS

ABATEMENT SPECIFICATIONS FOR REQUIREMENTS.

KEYPLAN

D R A W I N G N O T E S

1/4" = 1'-0"

ENLARGED NEW WORK PLAN - PHASE A5

P H A S I N G N O T E S

No. Revisions: Date:

BID DOCUMENTS 01/13/2023

1 ADDENDUM 02 05/17/2023

Sheets
1-AE112 - PHASE A3 NEW WORK PLAN
1-AE114 - PHASE A5 NEW WORK PLAN

File details come from the government source that posted it. Updated .