Drawings - 506-20-102.pdf
PDF 41 MB Posted
- Solicitation number
- 36C25023B0027
About this file
This pre-solicitation announcement provides details for an upcoming invitation for bids for interior renovation work at a Veterans Administration medical center. The project involves upgrading approximately 14,000 square feet of existing basement and sub-basement spaces including electrical, mechanical and plumbing systems upgrades and asbestos abatement. The work is estimated to cost between $1 million and $5 million. The solicitation will be issued on or around March 20, 2023 via the System for Award Management website and bids are due within 120 days. This acquisition is set aside solely for qualified Service-Disabled Veteran Owned Small Businesses registered in the Vendor Information Pages database. Interested parties should monitor the named websites for solicitation details and amendments.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING 1W
BUILDING 28
BUILDING 1E
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\d u n n t\ D o c u m e n ts \R e v it \2
\A n n
A rb o r
B ld g
W B a s e m e n t (2 tj .d u n n
.r v t
/1
/2
:4
:1
P
M
GI000
COVER SHEET, SHEET INDEX
01/13/2023 PQ JK
UPGRADE BASEMENT,
BUILDING 1 WEST
506-20-102
ANN ARBOR, MICHIGAN
BID DOCUMENTSANN ARBOR VA
MEDICAL
CENTER Approved: Veteran's Affairs Medical Center
1. SEE GENERAL PROJECT NOTES FOR NEW WORK FOR ADDITIONAL REQUIREMENTS FOR WORK WITHIN THE EXISTING FACILITY.
2. THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND FIELD CONDITIONS PRIOR TO DEMOLITION AND CONSTRUCTION. THE CONTRACTOR SHALL BRING ANY DISCREPANCIES TO THE IMMEDIATE ATTENTION OF THE ARCHITECT AND C.O.R.
3. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF EXISTING ITEMS TO REMAIN DURING DEMOLITION AND CONSTRUCTION.
4. MAINTAIN EXIT EGRESS PATHS TO EXISTING EXIT DOORS DURING CONSTRUCTION.
5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK AND THE
ROUTES MUST BE RETURNED TO THEIR ORIGINAL CONDITION AT THE END OF THE PROJECT.
6. MAINTAIN THE BUILDING IN A WEATHER TIGHT CONDITION AT ALL TIMES.
7. ALL DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL BE COORDINATED WITH THE C.O.R. TO MINIMIZE DISRUPTIONS OF NORMAL FUNCTIONS OF
THE VA'S OCCUPIED AREAS.
8. IF CONSTRUCTION NOISE IS ANTICIPATED, SUBMIT A WRITTEN REQUEST TO THE C.O.R. FOR THE SCHEDULED TIME OF THE CONSTRUCTION ACTIVITIES. NO WORK SHALL BE DONE WITHOUT THE WRITTEN APPROVAL OF THE C.O.R. THE C.O.R. RESERVES THE RIGHT TO DISCONTINUE NOISY CONSTRUCTION AT ANY TIME. NO RADIOS SHALL BE PERMITTED AT ANY TIME IN WORK AREAS ADJACENT TO OCCUPIED SPACES. IF WORK ACTIVITY WILL GENERATE NOISE OVER 85 DECIBELS OR IF THE WORK SCHEDULED IS LIKELY TO PRODUCE VIBRATIONS THROUGHOUT THE BUILDING STRUCTURE, THEN THE CONTRACTOR SHALL WORK WITH THE C.O.R. TO SCHEDULE THE MOST APPROPRIATE TIME TO PERFORM THE DISRUPTIVE
WORK ACTIVITY.
9. ALL EXISTING SERVICES AND UTILITIES SHALL BE MAINTAINED TO ADJACENT DEPARTMENTS OR AREAS THAT ARE IN OPERATION AND SERVED BY THEM. COORDINATE ALL DISRUPTIONS OR DISCONTINUATIONS OF UTILITIES AND SERVICES WITH C.O.R. NO LESS THAN 10 WORKING DAYS PRIOR TO THE REQUIRED OUTAGE. NO SHUT DOWN OF EXISTING SERVICES IS ALLOWED TO OCCUR UNTIL RECEIVING THE C.O.R.'S WRITTEN APPROVAL OF THE SHUT DOWN SCHEDULE. PROVIDE TEMPORARY SERVICES AND/OR UTILITIES DURING INTERRUPTIONS AS REQUIRED AND APPROVED BY THE C.O.R.
10. THE GENERAL CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT DAMAGE TO THE V.A.'S OCCUPIED AREAS ADJACENT TO NEW CONSTRUCTION OR OCCUPIED AREAS WHERE VARIOUS SYSTEM CONNECTIONS OR EXTENSIONS ARE REQUIRED. IN THESE AREAS, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY LACK OF SUFFICIENT PROTECTION FROM THE WEATHER AND FROM THE RESULTS OF ALL
CONSTRUCTION ACTIVITY INCLUDING BUT NOT LIMITED TO DUST AND WATER.
11. THE GENERAL CONTRACTOR SHALL RECEIVE WRITTEN APPROVAL FROM THE C.O.R. BEFORE USING OPEN FLAMES, WELDING RODS AND TORCHES.
THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS TO PROHIBIT THE MIGRATION OF SMOKE AND OTHER PRODUCTS OF COMBUSTION INTO OCCUPIED AREAS OF THE EXISTING BUILDING AND FOR OBTAINING ALL REQUIRED PERMITS RELATED TO HOT WORK.
12. PROVIDE FIRE PROTECTION IN ACCORDANCE WITH THE REQUIREMENTS OF THE GOVERNING AUTHORITY.
13. IT IS THE GENERAL CONTRACTORS RESPONSIBILITY TO PATCH ALL SPRAY-ON FIRE PROTECTION AT REMOVALS, AT ANY EXISTING LOCATIONS WHICH ARE VOID OF PROTECTION WITHIN THE AREA OF WORK AND AT NEW CONSTRUCTION WHICH DISTURBS EXISTING FIRE PROTECTION.
FIREPROOFING MUST BE CONTINUOUS AND UNOBSTRUCTED.
1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND FEDERAL AUTHORITIES, CODES, RULES
AND REGULATIONS.
2. THESE DOCUMENTS SHOW THE MINIMUM CONSTRUCTION REQUIREMENTS AND THE MINIMUM QUALITY OF WORK EXPECTED. MORE STRINGENT REQUIREMENTS STIPULATED WITHIN RELEVANT MANUFACTURER’S INSTALLATION
INSTRUCTIONS WILL SUPERSEDE.
3. ANY UNFORESEEN OR UNCLEAR CONDITIONS SHALL BE REPORTED TO THE ARCHITECT AND C.O.R. PRIOR TO
PROCEEDING WITH WORK.
4. ANY CONFLICTS WITHIN THE DRAWINGS, BETWEEN THE DRAWINGS AND THE SPECIFICATIONS, OR BETWEEN THE DRAWINGS AND THE ACTUAL CONDITIONS AT THE SITE, ARE TO BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE ARCHITECT AND C.O.R. THE CONTRACTOR SHALL NOT PROCEED WITH WORK UNTIL WRITTEN CLARIFICATION FROM THE
C.O.R. IS RECEIVED.
5. UNLESS OTHERWISE NOTED, ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED PER THE APPLICABLE PROVISIONS OF
THESE DOCUMENTS AND THE MANUFACTURER’S INSTRUCTIONS.
6. ALL MATERIALS USED SHALL BE NEW UNLESS OTHERWISE NOTED AND/OR OF A QUALITY TO MEET OR EXCEED ALL APPLICABLE INDUSTRY STANDARDS. WHERE SPECIFIED PRODUCTS OR MANUFACTURERS ARE NOT NOTED, THE
CONTRACTOR SHALL NOTIFY THE C.O.R. TO OBTAIN A MINIMUM STANDARD OF QUALITY.
7. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL MEANS, METHODS AND TECHNIQUES FOR CONSTRUCTION.
8. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR JOB-SITE SAFETY INCLUDING BUT NOT LIMITED TO THE ADHERENCE
TO OSHA REGULATIONS.
9. ALL ELECTRICAL AND MECHANICAL WORK SHALL BE PERFORMED BY PERSONNEL LICENSED IN THE STATE WHERE THIS
PROJECT IS LOCATED.
10. REMOVE ALL DEBRIS PROPERLY FROM THE SITE. LOAD DEBRIS DIRECTLY ONTO TRUCKS OR INTO DUMPSTERS FOR REMOVAL. DISPOSE OF DEBRIS LEGALLY. DO NOT BURN DEBRIS ON THE SITE. DO NOT ALLOW DEBRIS TO ENTER SEWERS.
DO NOT ALLOW PILED DEBRIS TO ENDANGER STRUCTURES, BLOCK EXISTS OR ROADWAYS. COMBUSTIBLE WASTE WHICH COULD CREATE A FIRE HAZARD SHALL NOT BE PERMITTED TO ACCUMULATE IN OR AROUND THE CONSTRUCTION SITE.
11. COORDINATE ALL WORK WITH ALL OTHER DISCIPLINES. EXACT SIZE AND LOCATION OF ALL ROOF AND FLOOR OPENINGS SHOWN ON DRAWINGS SHALL BE VERIFIED WITH THE ASSOCIATED SUB-CONTRACTORS PRIOR TO CONSTRUCTION.
12. DO NOT SCALE DRAWINGS. DIMENSIONS SHALL GOVERN. ALL PLAN DIMENSIONS ARE TAKEN TO FINISH FACE OF
CONSTRUCTION.
13. LAYOUT AND VERIFY ALL PARTITION LOCATIONS PRIOR TO CONSTRUCTION FOR CLEARANCES AND DIMENSIONS. NOTIFY
ARCHITECT OF ANY DISCREPANCIES.
14. WITHIN ALL METAL STUD PARTITIONS, THE GENERAL CONTRACTOR SHALL PROVIDE BLOCKING FOR ALL WALL MOUNTED EQUIPMENT AND ACCESSORIES INCLUDING BUT NOT LIMITED TO: MECHANICAL, ELECTRICAL AND PLUMBING DEVICES, FURNITURE, CASEWORK, MILLWORK AND ALL OTHER WALL MOUNTED ACCESSORIES AND ITEMS. SEE TYPICAL BLOCKING DETAILS IN METAL STUD WALLS INCLUDED IN THESE DOCUMENTS FOR BLOCKING AND ANCHORING REQUIREMENTS.
15. ALL CONCEALED WOOD SHALL BE FIRE RETARDANT TREATED.
16. THE GENERAL CONTRACTOR SHALL COORDINATE WITH ALL DISCIPLINES TO DETERMINE THE SIZE AND LOCATION OF PENETRATIONS IN NEW CONSTRUCTION. SEAL CONSTRUCTION TIGHT TO ALL PENETRATIONS AND CAULK.
17. ALL PENETRATIONS THROUGH FIRE RATED CONSTRUCTION SHALL HAVE FIRE SAFING MATERIAL IN HILTI RED OR
EQUIVALENT AND INSTALLED IN ACCORDANCE WITH THE SPECIFICATIONS.
18. PROVIDE CONTROL JOINTS IN GYPSUM BOARD INTERIOR PARTITIONS AT 30 FEET ON CENTER MAXIMUM. WHERE POSSIBLE, LOCATE JOINTS AT CORNERS ABOVE OPENINGS. VERIFY LOCATIONS WITH ARCHITECT. SEE GYPSUM BOARD
SPECIFICATION FOR STANDARDS.
19. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL EQUIPMENT INSTALLATION AND VERIFYING ALL REQUIRED ROUGH OPENINGS, AND ROUGH-IN DIMENSIONS WITH THE EQUIPMENT MANUFACTURER, VA COR AND
ARCHITECT PRIOR TO CONSTRUCTION.
20. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR HOSTING THE SUBMITTAL EXCHANGE FOR THE DURATION OF THE
PROJECT.
G E N E R A L N O T E S - E X I S T I N G F A C I L I T I E S :
G E N E R A L N O T E S - N E W W O R K :
D R A W I N G I N D E X
ANN ARBOR VAMC
UPGRADE BASEMENT, BUILDING 1 WEST
DEPARTMENT OF VETERANS AFFAIRS
2215 FULLER ROAD
ANN ARBOR, MI 48105
14. DO NOT OVERLOAD THE EXISTING BUILDING STRUCTURE. MAINTAIN THE STRUCTURAL INTEGRITY OF ALL STRUCTURAL FRAMING MEMBERS AND
SYSTEMS AT ALL TIMES.
15. ALL DEMOLISHED MATERIAL, EXCEPT MATERIAL THAT IS LISTED OR MARKED BY THE ARCHITECT OR THE C.O.R. FOR RETENTION, SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND IT SHALL BE DISPOSED OF. NO DEBRIS RESULTING FROM WORK SHALL BE LEFT IN THE CONSTRUCTION
ROUTES BEYOND THE AREAS OF WORK.
16. REMOVAL OF A PARTICULAR ITEM IS TO INCLUDE ALL RELATED ITEMS, SUCH AS REMOVAL OF WALLS WOULD INCLUDE ASSOCIATED DOORS, HARDWARE, ELECTRICAL, PLUMBING, MECHANICAL, ETC. REFER TO DEMOLITION DRAWINGS FOR MORE INFORMATION. FOR ALL REMOVALS, THE
GENERAL CONTRACTOR SHALL COORDINATE WITH ALL OTHER DISCIPLINES.
17. WHERE CEILINGS ARE SHOWN TO BE REMOVED, ALL UNUSED SUSPENDED EQUIPMENT, WIRES, ANGLES, ETC. SHALL BE REMOVED. SEE DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION. EXISTING LIGHTS MAY BE MAINTAINED AS TEMPORARY CONSTRUCTION LIGHTING.
18. THE CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ITEMS NOT DEMOLISHED OR REMOVED AS REQUIRED UNTIL PERMANENT SUPPORT
IS PROVIDED IN THE FINAL CONSTRUCTION.
19. ALL OPENINGS IN EXISTING WALLS, CEILINGS AND FLOORS, WHICH ARE THE RESULT OF REMOVALS AND OTHER NEW CONSTRUCTION ACTIVITY, SHALL BE PATCHED WITH NEW MATERIALS THAT MATCH THE EXISTING MATERIALS. IF THE PATCH IS TO BE MADE IN FIRE RATED CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE PATCH SHALL BE FINISHED TO A LIKE NEW CONDITION TO MATCH THE EXISTING FINISH.
20. WHERE EXISTING SURFACES ARE TO BE REFINISHED OR ARE TO SERVE AS SUBSTRATE FOR THE ATTACHMENT OR APPLICATION OF NEW MATERIALS OR CONSTRUCTION, PREPARE OR ALTER THE EXISTING SURFACES AS NECESSARY TO PROPERLY ACCOMMODATE THE NEW MATERIALS.
21. FIELD VERIFY SIZES AND DIMENSIONS OF ALL EXISTING UTILITIES THAT IMPACT THE NEW WORK. DETERMINE THE SIZE AND LOCATION OF PENETRATIONS FROM THE EXISTING UTILITIES WITHIN THE NEW WORK. SEAL TIGHT TO ALL PENETRATIONS AND CAULK.
22. PENETRATIONS THROUGH EXISTING FIRE RATED CONSTRUCTION MUST BE PROPERLY CLOSED AND FIRE SAFING INSTALLED TO ACHIEVE THE
PROPER FIRE RATING BY THE END OF CONSTRUCTION OPERATIONS FOR EACH DAY.
23. NEW HOLES IN EXISTING ELEVATED FLOOR AND ROOF STRUCTURES FOR NEW WORK MUST BE COORDINATED WITH THE EXISTING STRUCTURE SO
THAT CRITICAL STRUCTURAL MEMBERS ARE NOT DAMAGED.
24. UNLESS OTHERWISE NOTED, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING SALVAGED STOCK BEFORE ORDERING
NEW MATERIAL.
25. SEE ASBESTOS SPECIFICATIONS FOR ASBESTOS RELATED WORK.
R E G I O N A L V I C I N I T Y M A P V I C I N I T Y M A P
ARCHITECTURAL
1-AD100 OVERALL DEMOLITION PLAN
1-AD110 PHASE A1 DEMOLITION PLAN
28-AD111 PHASE A2 DEMOLITION PLAN
1-AD112 PHASE A3 DEMOLITION PLAN
1-AD113 PHASE A4 DEMOLITION PLAN
1-AD114 PHASE A5 DEMOLITION PLAN
1-AD115 PHASE B1 DEMOLITION PLAN
1-AD116 PHASE B2 DEMOLITION PLAN
1-AD117 PHASE B3 DEMOLITION PLANS
1-AD118 PHASE B4 DEMOLITION PLAN
28-AD141 PHASE A2 DEMOLITION REFLECTED CEILING PLAN
1-AE101 OVERALL NEW WORK AND PHASING PLAN
1-AE110 PHASE A1 NEW WORK PLAN
28-AE111 PHASE A2 NEW WORK PLAN
1-AE112 PHASE A3 NEW WORK PLAN
1-AE113 PHASE A4 NEW WORK PLAN
1-AE114 PHASE A5 NEW WORK PLAN
1-AE115 PHASE B1 NEW WORK PLAN
1-AE116 PHASE B2 NEW WORK PLAN
1-AE117 PHASE B3 NEW WORK PLAN
1-AE118 PHASE B4 NEW WORK PLAN
1-AC140 REFLECTED CEILING PHASING PLAN
28-AC141 REFLECTED CEILING PLAN
1-AC142 REFLECTED CEILING PLANS
1-AC143 REFLECTED CEILING PLANS
28-AE311 WALL SECTIONS AND DETAILS
1-AE312 WALL SECTIONS
1-AE401 MILLWORK SECTIONS AND ELEVATIONS
1-AE601 ROOM FINISH SCHEDULE AND FINISH PLAN
1-AE602 DOOR SCHEDULE AND DETAILS
1-AE603 MISCELLANEOUS DETAILS
1-AE611 SIGNAGE PLAN AND SCHEDULE
FIRE PROTECTION
1-FX101 FIRE SUPPRESSION PLAN
28-FX101 GROUND FLOOR FIRE SUPPRESSION PLAN
PLUMBING
P100 PLUMBING LEGEND AND GENERAL NOTES
1-PD101 SUB BASEMENT PLUMBING - DEMOLITION
1-PD102 BASEMENT PLUMBING PLAN - DEMOLITION
1-PL101 SUB BASEMENT PLUMBING - NEW WORK
1-PL102 BASEMENT & TENTH FLOOR PLUMBING PLAN - NEW WORK
1-PL501 PLUMBING DETAILS & SCHEDULES
1-PL601 PLUMBING ISOMETRICS
28-PD101 UNDERGROUND PLUMBING DEMOLITION PLAN
28-PD102 GROUND FLOOR PLUMBING DEMOLITION PLAN
28-PL101 UNDERGROUND PLUMBING NEW WORK PLAN
28-PL102 GROUND FLOOR PLUMBING NEW WORK PLAN
28-PL501 PLUMBING DETAILS AND SCHEDULES
28-PL601 PLUMBING ISOMETRICS
MECHANICAL
M001 MECHANICAL LEGEND SHEET
1-MD101 BASEMENT MECHANICAL PLAN - DEMOLITION
1-MD110 TENTH FLOOR MECHANICAL PLAN - DEMOLITION
1-MH101 BASEMENT MECHANICAL PLAN - NEW WORK
1-M104 FOURTH FLOOR OVERALL PLAN - NEW WORK
1-M109 NINTH FLOOR MECHANICAL PLAN - NEW WORK
1-M110 TENTH FLOOR MECHANICAL PLAN - NEW WORK
1-MP101 BASEMENT MECHANICAL PIPING PLAN - NEW WORK
28-MD101 BASEMENT MECHANICAL PLAN - DEMOLITION
28-MH101 BASEMENT MECHANICAL PLAN - NEW WORK
28-M102 SECOND FLOOR MECHANICAL PLAN - NEW WORK
28-MP101 BASEMENT MECHANICAL PIPING PLAN - NEW WORK
M301 MECHANICAL SECTIONS
M401 MECHANICAL ENLARGED PLANS
M402 MECHANICAL ENLARGED PLANS
M501 MECHANICAL DETAILS I
M502 MECHANICAL DETAILS II
M503 MECHANICAL DETAILS III
M601 MECHANICAL SCHEDULES
M602 MECHANICAL SCHEDULES
M701 MECHANICAL CONTROLS
M702 MECHANICAL CONTROLS
M703 MECHANICAL CONTROLS
ELECTRICAL
E001 LEGEND
1-ED101 BASEMENT ELECTRICAL DEMOLITION PLAN
1-EL101 BASEMENT LIGHTING PLAN - NEW WORK
1-EP101 BASEMENT POWER PLAN - NEW WORK
1-EY101 BASEMENT TECHNOLOGY & FIRE ALARM PLAN - NEW WORK
1-EP104 FOURTH FLOOR POWER PLAN - NEW WORK
1-EP109 NINTH FLOOR POWER PLAN - NEW WORK
1-E110 ELECTRICAL PLANS - TENTH FLOOR
28-ED101 ELECTRICAL DEMOLITION PLAN
28-EL101 ELECTRICAL LIGHTING PLAN
28-EP101 ELECTRICAL POWER PLAN
28-EY101 ELECTRICAL TECHNOLOGY & FIRE ALARM PLAN
E501 ELECTRICAL DETAILS
E502 ELECTRICAL DETAILS
E601 PANELBOARD SCHEDULES
E602 PANELBOARD SCHEDULES
E603 PANELBOARD SCHEDULES
E604 PANELBOARD SCHEDULES
GENERAL
GI000 COVER SHEET, SHEET INDEX
GI001 LIFE SAFETY PLAN
GI002 WALL TYPES AND NOTES
GI003 ICRA CLASS III REQUIREMENTS
GI101 CONTRACTOR STAGING
STRUCTURAL
28-S101 STRUCTURAL NEW WORK
28-S501 STRUCTURAL DETAILS AND SECTIONS
No. Revisions: Date:
BID DOCUMENTS 01/13/2023
DN
DN
UP
UP
UP
CORRIDOR
C5
CORRIDOR
C5.1
WAITING
FG100
VIEWING
FG100A
STORAGE
FG102
WORKROOM
FG101
MORGUE
COOLER
FG101A
AUTOPSY
ROOM
FG104A
SOUTH
CORRIDOR -
EAST
C1
SLIDE
STORAGE
AB43
NUCLEAR
WASTE
STORAGE
AB46
EMERGENCY
PREP
STORAGE
AB31
MECHANICAL
AB21A
STORAGE
AB21
CANTEEN
FREEZER
BB09B N&FS
COOLER
BB18B
CANTEEN
COOLER
BB09A
CANTEEN
DRY
BB09
N&FS
FREEZER
BB18A
N&FS DRY
BB18
BIO MED
BB05
CANTEEN
RETAIL
BB07
LINEN
CACHE
BB50C
ANTE
FG104
SINGLE
USER
RESTROOM
FG104B
AUTOPSY
OFFICE
FG103
ELEVATOR
LOBBY 1E
B1E.01
NORTH
CORRIDOR -
WEST
C4
DOCK
CORRIDOR
EAST
C3.5
DOCK
CORRIDOR
WEST
C3.5
CANTEEN
VENDING
BB13
HE
STORAGE
BB06
MEN'S
LOCKERS
AB94
MEN'S BATH
AB94A
BATH
AB92A
EVS BREAK
ROOM
AB92
VOL SERV
SUPPLY
ROOM
AB123
VOL SERV
CRAFT
ROOM
AB124
VOL SERV
STAFF
OFFICE
AB125
EMS EQUIP
ROOM
AB122
EMS STAFF
OFFICE
AB92B
VOL SERV
CLOTHING
RM
AB127
STAFF
TRAINING
AB126
2 HOUR FIRE BARRIER
1 HOUR FIRE / SMOKE BARRIER
LEGEND
HORIZONTAL EXIT PASSAGEWAYHE
EXIT
EP EXIT PASSAGEWAY
HAZARDOUS
ROOM
EXIT STAIR OR PASSAGEWAY
EXIT SIGN
FIRE EXTINGUISHER
PROJECT LIMITS
30 MINUTE SMOKE BARRIER
COMMON PATH OF EGRESS
MOST REMOTE LOCATION
STAIR
S-10
ELECTRICAL
WORKSHOP
A1001
SERVICE
ELEVATOR
S6
SERVICE
ELEVATOR
S5
ELEV
P-4
ELEV
P-3
ELEV
P-2
ELEV
P-1
ELECTRICAL
WORKSTATIONS
A1004
OFFICE
A1005
TELECOMM
A1002A
MECHANICAL
ROOM
A1002
LIFT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\d u n n t\ D o c u m e n ts \R e v it \2
\A n n
A rb o r
B ld g
W B a s e m e n t (2 tj .d u n n
.r v t
/1
/2
:4
:2
P
M
GI001
LIFE SAFETY PLAN
01/13/2023 PQ JK
UPGRADE BASEMENT,
BUILDING 1 WEST
506-20-102
ANN ARBOR, MICHIGAN
BID DOCUMENTSANN ARBOR VA
MEDICAL
CENTER Approved: Veteran's Affairs Medical Center
3/64" = 1'-0"
LIFE SAFETY PLAN - BASEMENT FLOOR PLAN
NOTE:
ALL EXTERIOR WALLS ARE 2-HR RATED
3/64" = 1'-0"
LIFE SAFETY PLAN - 10TH FLOOR
PROJECT SUMMARY:
THE PROJECT SCOPE IS TO RENOVATE THE SERVICE USES IN THE BASEMENT INCLUDING NUTRITION & FOOD SERVICES, CANTEEN SERVICES, NUCLEAR WASTE STORAGE AND OTHER STORAGE USES, (2) CONNECT BUILDING 1W WITH BUILDING 28 AT THE BASEMENT LEVEL, RELOCATE THE ELECTRIC SHOP TO THE 10TH FLOOR OF BUILDING 1W, AND (4) RELOCATE THE MORGUE SUITE TO BUILDING 28 (EXISTING ELECTRIC SHOP). ALL BUILDINGS WITHIN THIS PROJECT ARE FULLY
SPRINKLERED IN ACCORDANCE WITH NFPA.
BUILDING 1W – BASEMENT
BUILDING 1W – 10TH FLOOR ELECTRICAL SHOP
BUILDING 28 – MORGUE SUITE
ASCE7-2016 SEISMIC DESIGN CATEGORY – C (RISK CATEGORY IV, SITE CLASS D)
2021 NFPA 220
TABLE 4.1.1 CONSTRUCTION TYPE II (222):
EXTERIOR BEARING WALLS: 2 HOUR (1 HOUR WHERE SUPPORTING ROOFS ONLY)
INTERIOR BEARING WALLS: 2 HOUR (1 HOUR WHERE SUPPORTING ROOFS ONLY)
COLUMNS: 2 HOUR (1 HOUR WHERE SUPPORTING ROOFS ONLY)
BEAMS, GIRDERS, TRUSSES, AND ARCHES: 2 HOUR (1 HOUR WHERE SUPPORTING ROOFS ONLY)
FLOOR-CEILING ASSEMBLIES: 2 HOUR
ROOF-CEILING ASSEMBLIES: 1 HOUR
INTERIOR NONBEARING WALLS: 0 HOUR
EXTERIOR NONBEARING WALLS: 0 HOUR
2021 NFPA 5000
TABLE 7.4.1. ALLOWABLE BUILDING HEIGHT AND AREA
BUSINESS OCCUPANCY (TYPE II -222, SPRINKLERED): 12 FLOORS, UNLIMITED AREA (COMPLIES, NO CHANGE)
MAXIMUM BUILDING HEIGHT: 180 FT (COMPLIES, NO CHANGE)
2021 NFPA 101 LIFE SAFETY CODE
AREA OF WORK:
BUILDING 1W – BASEMENT: 10, 870 GSF
BUILDING 1W – 10TH FLOOR ELECTRICAL SHOP: 3,650 GSF (EXCLUDING VERTICAL CIRCULATION)
BUILDING 28 – MORGUE SUITE: 3,000 GSF
CHAPTER 3 DEFINITIONS
3.3.32.2 SMOKE BARRIER. A CONTINUOUS MEMBRANE, OR A MEMBRANE WITH DISCONTINUITIES CREATED BY PROTECTED OPENINGS, WHERE SUCH MEMBRANE IS DESIGNED AND CONSTRUCTED TO RESTRICT THE MOVEMENT OF
SMOKE.
CHAPTER 6 - CLASSIFICATION OF OCCUPANCY AND HAZARD OF CONTENT
6.1.11 EXISTING BUSINESS OCCUPANCY (CHAPTER 39)
6.2.2 HAZARD CLASSIFICATION: ORDINARY - NO CHANGE
CHAPTER 7 - MEANS OF EGRESS:
7.1.3.1 EXIT ACCESS CORRIDORS: CORRIDORS USED AS EXIT ACCESS AND SERVING AN AREA HAVING AN OCCUPANT LOAD EXCEEDING 30 SHALL BE SEPARATED FROM OTHER PARTS OF THE BUILDING BY WALLS HAVING NOT LESS THAN A 1-HOUR FIRE RESISTANCE RATING IN ACCORDANCE WITH SECTION 8.3, UNLESS OTHERWISE PERMITTED BY ONE OF THE FOLLOWING: (1) THIS REQUIREMENT SHALL NOT APPLY TO EXISTING BUILDINGS, PROVIDED THAT THE OCCUPANCY CLASSIFICATION DOES NOT CHANGE. (2) THIS REQUIREMENT SHALL NOT APPLY WHERE OTHERWISE PROVIDED IN
CHAPTERS 11 THROUGH 43.
7.3.1.2 OCCUPANT LOAD OF SPACE:
BUILDING 1W – BASEMENT: 10,870 GSF AT 150 GSF / OCCUPANT = 73 OCCUPANTS (NO CHANGE)
BUILDING 1W – 10TH FLOOR ELECTRICAL SHOP: 3,650 GSF AT 150 GSF / OCCUPANT = 24 OCCUPANTS
BUILDING 28: 3,000 GSF AT 150 GSF / OCCUPANT = 20 OCCUPANTS (NO CHANGE)
7.11. SPECIAL PROVISIONS FOR OCCUPANCIES WITH HIGH-HAZARD CONTENTS.
7.11.1. WHERE THE CONTENTS ARE CLASSIFIED AS HIGH-HAZARD, EXITS SHALL BE PROVIDED AND ARRANGED TO ALLOW ALL OCCUPANTS TO ESCAPE FROM THE BUILDING OR STRUCTURE, OR FROM THE HAZARDOUS AREA THEREOF, TO THE OUTSIDE OR A PLACE OF SAFETY WITH A TRAVEL DISTANCES OF NOT MORE THAN 75 FT, MEASURED AS
REQUIRED IN 7.6.1., UNLESS OTHERWISE PROVIDED IN 7.11.2.
7.12.1. SPECIAL PROVISIONS FOR HAZARDOUS MATERIALS
HAZARDOUS MATERIALS THAT ARE STORED, USED, OR HANDLED, AND THAT ARE ALSO CLASSIFIED AS HIGH-HAZARD
CONTENTS IN ACCORDANCE WITH 6.2.2, SHALL COMPLY WITH SECTION 7.11.
CHAPTER 8 - FEATURES OF FIRE PROTECTION: NO CHANGE
8.4. SMOKE PARTITIONS
8.4.2. SMOKE PARTITIONS SHALL EXTEND FROM THE FLOOR TO THE UNDERSIDE OF THE FLOOR OR ROOF DECK ABOVE
8.5.3. FIRE BARRIERS AS SMOKE BARRIERS
A FIRE BARRIER SHALL BE PERMITTED TO BE USED AS A SMOKE BARRIER, PROVIDED THAT IT MEETS THE
REQUIREMENTS OF SECTION 8.5.
8.7. SPECIAL HAZARD PROTECTIONS
8.7.1.1 PROTECTION FROM ANY AREA HAVING A DEGREE OF HAZARD GREATER THAN THAT NORMAL TO THE GENERAL OCCUPANCY OF THE BUILDING OR STRUCTURE SHALL BE PROVIDED BY ONE OF THE FOLLOWING MEANS:
(1) SEPARATING THE AREA FROM OTHER PARTS OF THE BUILDING WITH A FIRE BARRIER HAVING A FIRE RESISTANCE RATING OF NOT LESS THAN 1 HOUR IN ACCORDANCE WITH SECTION 8.3 AND WITHOUT WINDOWS.
(2) PROTECTING THE AREA WITH AUTOMATIC EXTINGUISHING SYSTEMS IN ACCORDANCE WITH SECTION 9.7.
(3) APPLYING BOTH 8.7.1.1(1) AND 8.7.1.1.(2) WHERE THE HAZARD IS SEVERE OR WHERE OTHERWISE SPECIFIED IN
CHAPTERS 11 THROUGH 43.
8.7.1.2. IN NEW CONSTRUCTION, WHERE PROTECTION IS PROVIDED WITH AUTOMATIC EXTINGUISHING SYSTEMS WITHOUT FIRE-RESISTIVE SEPARATION, THE SPACE PROTECTED SHALL BE ENCLOSED WITH SMOKE PARTITIONS IN ACCORDANCE
WITH SECTION 8.4 […]
8.7.3. HAZARDOUS MATERIALS.
8.7.3.1 WHERE REQUIRED BY THE PROVISIONS OF CHAPTERS 11 THOUGH 43, OCCUPANCIES WITH STORAGE, USE, AND HANDLING OF HAZARDOUS MATERIALS SHALL COMPLY WITH THE FOLLOWING CODES UNLESS OTHERWISE MODIFIED BY OTHER PROVISIONS OF THIS CODE: NFPA 30, NFPA 54, NFPA 55, NFPA 58, NFPA 400, AND NFPA 495.
CHAPTER 9 - BUILDING SERVICE AND FIRE PROTECTION EQUIPMENT: NO CHANGE
CHAPTER 10 - INTERIOR FINISH, CONTENTS, AND FURNISHES
10.2.3.1
INTERIOR WALL AND CEILING FINISH MATERIALS TESTED IN ACCORDANCE WITH NFPA 286.
10.2.3.1.1
INTERIOR WALL AND CEILING FINISH MATERIALS SHALL BE CLASSIFIED IN ACCORDANCE WITH NFPA 286 AND COMPLY
WITH 10.2.3.2.
10.2.3.1.2
MATERIALS TESTED IN ACCORDANCE WITH 10.2.3.1.1 AND COMPLYING WITH 10.2.3.2 SHALL BE CONSIDERED ALSO TO COMPLY WITH THE REQUIREMENTS OF CLASS A, CLASS B, OR CLASS C IN ACCORDANCE WITH 10.2.3.3
10.2.3.2.
(1) DURING THE 40 KW EXPOSURE, FLAMES SHALL NOT SPREAD TO THE CEILING.
(2) THE FLAME SHALL NOT SPREAD TO THE OUTER EXTREMITY OF THE SAMPLE ON ANY WALL OR CEILING.
(3) FLASHOVER, AS DESCRIBED IN NFPA 286, SHALL NOT OCCUR.
(4) THE PEAK HEAT RELEASE RATE THROUGHOUT THE TEST SHALL NOT EXCEED 800 KW.
(5) FOR NEW INSTALLATIONS, THE TOTAL SMOKE RELEASED THROUGH-OUT THE TEST SHALL NOT EXCEED 1000 M2.
10.2.3.3
WALL AND CEILING- CLASSIFICATIONS CHARACTERISTICS.
(1) CLASS A: FLAME SPREAD: 0-25; SMOKE DEV. : 0-450.
(2) CLASS B: FLAME SPREAD: 26-75; SMOKE DEV. : 0-450
(3) CLASS C: FLAME SPREAD: 76-200; SMOKE DEV. : 0-450
10.2.8.1
WALL AND CEILING FINISHES, WHERE SPRINKLED:
CLASS C PERMITTED IN ANY LOCATION WHERE CLASS B IS REQ’D.
CLASS B PERMITTED IN ANY LOCATION WHERE CLASS A IS REQ’D.
- MAINTAIN ACCESSIBILITY TO EXISTING FIRE EXTINGUISHERS DURING CONSTRUCTION
39.2.5. ARRANGEMENT OF MEANS OF EGRESS
39.2.5.2.1 COMMON PATH OF TRAVEL SHALL NOT EXCEED 100 FT ON A STORY PROTECTED THROUGHOUT BY AN
APPROVED AUTOMATIC SPRINKLER SYSTEM IN ACCORDANCE WITH 9.7.1.(1). (COMPLIES)
39.2.5.2.2 COMMON PATH OF TRAVEL SHALL NOT BE LIMITED IN A SINGLE-TENANT SPACE WITH AN OCCUPANT LOAD
NOT EXCEEDING 30 PEOPLE. (10TH FLOOR COMPLIES)
39.2.6. TRAVEL DISTANCE TO EXITS
39.2.6.3. TRAVEL DISTANCE TO AN EXIT SHALL NOT EXCEED 300 FT IN BUSINESS OCCUPANCIES PROTECTED THROUGHOUT BY AN APPROVED, SUPERVISED AUTOMATIC SPRINKLER SYSTEM IN ACCORDANCE WITH SECTION 9.7. (
COMPLIES)
39.3.2. PROTECTION FROM HAZARDS
39.3.2.1 GENERAL. HAZARDOUS AREAS INCLUDING, BUT NOT LIMITED TO, AREAS USED FOR GENERAL STORAGE, BOILER OR FURNACE ROOMS, AND MAINTENANCE SHOPS THAT INCLUDE WOODWORKING AND PAINTING AREAS SHALL
BE PROTECTED IN ACCORDANCE WITH SECTION 8.7.
39.3.2.3 HAZARDOUS MATERIALS. WHERE HAZARDOUS MATERIALS ARE STORED OR HANDLED, THE PROVISIONS OF 8.7.3.1
SHALL APPLY.
39.3.3 INTERIOR FINISHES.
39.3.3.1. GENERAL. INTERIOR FINISHES SHALL BE IN ACCORDANCE WITH SECTION 10.2.
39.3.3.2.2 INTERIOR WALL AND CEILING FINISHES SHALL BE CLASS A, CLASS B, OR CLASS C IN AREAS OTHER THAN EXITS
AND EXIT ACCESS CORRIDORS.
39.3.3.3. INTERIOR FLOOR FINISH (NO REQUIREMENTS)
39.3.6 CORRIDORS (NO REQUIREMENTS)
39.3.5 AND NFPA 10
FIRE EXTINGUISHERS SHALL BE PROVIDED IN EVERY BUSINESS OCCUPANCY IN ACCORDANCE WITH SECTION 9.9.
39.3.6. CORRIDORS (NO REQUIREMENTS.)
10' - 0"
A101
SIM
A101
SIM
A101
SIM
A B B R E V I A T I O N S
LEVEL NAME W/ ELEVATION
GRID HEAD
CALL OUT HEAD W/ SHEET NUMBER
ROOM NAME W/ ROOM NUMBER, AREA & OCCUPANCY
BUILDING OR WALL SECTION NUMBER W/ SHEET
NUMBER
DOOR NUMBER
WALL TAG
KEYNOTE
REVISION TAG
CEILING TAG WITH HEIGHT
DETAIL SECTION NUMBER W/ SHEET NUMBER
NORTH ARROW
A.D.
A.C.T.
ACOUS.
A/C
A.C.P.
A.B.
AREA DRAIN
ACOUSTICAL CEILING TILE
ACOUSTIC
AIR CONDITIONING
ASPHALT CONCRETE
ANCHOR BOLT
PAVING
POUND OR NUMBER
PROPERTY LINE
FLOOR LINE
ANGLE
DIAMETER
CENTERLINE
AT
AND
BD.
APPROX.
ARCH.
ASPH.
ALT.
AL.
AGG.
BLDG.
BLK.
BLKG.
BM.
BRG.
BRK.
BOT.
BITUM.
CEM.
C.B.
CARP.
CAB.
B.U.R.
BTWN.
CLKG.
CLG.J.
CLG.
C.J.
CIR.
C.I.
CER.T.
CER.
BRZ.
COMB.
COL.
C.O.
CNTR.
CMU
CLS.
CLR.
C.W.
CTR.
CONV.O.
CONT.
CONST.
CONN.
CONC.
COMP.
DF.
D.F.
DIAG.
DIA.
DIM.
DISP.
DET.
DN.
D.O.
DR.
D.S.
D.T.
D.W.
DWR.
DIV.
CLO.
DOUGLAS FIR
DRINKING FOUNTAIN
DIAMETER
DIAGONAL
DIMENSION
DISPOSAL
DIVISION
DOWN
DOOR OPENING
DOOR
DOWN SPOUT
DRAIN TILE
DISHWASHER
DRAWER
DETAIL
COLD WATER
CENTER
CONVECTION OVEN
CONTINUOUS
CONSTRUCTION
CONNECTION
CONCRETE
COMPOSITION
BENCH MARK or BEAM
BOARD
BITUMINOUS
BUILDING
BLOCK
BLOCKING
APPROXIMATE
ARCHITECT
ASPHALT
CONCRETE MASONRY
COMBINATION
COLUMN
CLEAN OUT
COUNTER
CLOSURE
CLEAR
CLOSET
CAULKING
CEILING JOIST
UNIT
CEILING
BRICK
BEARING
CONSTRUCTION JOINT
CIRCLE
CAST IRON
CERAMIC TILE
CERAMIC
CEMENT
CATCH BASIN
CARPET
CABINET
BUILT-UP ROOFING
BETWEEN
BRONZE
BOTTOM
ALTERNATE
ALUMINUM
AGGREGATE
EA.
E.E.
E.F.
E.J.
ELEC.
ELEV.
E.N.
EXISTING
EACH
EACH END
EXHAUST FAN
EXPANSION JOINT
ELECTRICAL
ELEVATION
EDGE NAIL
(E)
ADJUSTABLEADJ.
LP
LC
LF
Ø
ABOVE FINISH FLOORAFF
COLD-FORMED STEELCFS
C.F.C.I. CONTRACTOR FURNISH/
E.C. ELECTRICAL CONTRACTOR
C.HK. COAT HOOK
C.B.B. CEMENTITIOUS BACKER
BOARD
A.C.M. ASBESTOS CONTAINING
MATERIALS
DWG(S). DRAWING(S)
FACE OF BUILDINGF.O.B.
FIXTURE
FACE OF CONCRETE
FLOOR
FLOOR JOIST
FLOOR LINE
FLASHING
FACE NAIL
GAUGE
FOOTING
FUTURE
FACE OF STUD
FIRE RETARDANT
TREATED WOOD
FACE OF MASONRY
FACE OF FINISH
F.O.S.
F.R.T.W.
FTG.
FUT.
GA.
FIXT.
F.J.
F.L.
FLASH.
FLR.
F.N.
F.O.C.
F.O.F.
F.O.M.
BEAM
GLASS
GLUE LAMINATED
GALVANIZED IRON
GRATE ELEVATION
GRAB BAR
GARBAGE DISPOSAL
GRADE
HOSE BIB
SHEET METAL
GYPSUM BOARD
HANDICAPPED
GALVANIZED
GROUND
HC.
GYP.BD.
H.B.
G.B.
G.D.
G.S.M.
GR.
GND.
GLB.
GL.
G.I.
G.E.
HEIGHT
HOUR
HEATING
HIGH POINT
HORIZONTAL
HOLLOW METAL
HARDWARE
HARDWOOD
INTERIOR
INVERT
HOT WATER
INSULATION
INSIDE DIAMETER
& AIR CONDITIONING
HEATING, VENTILATION
H.W.
INV.
INT.
INSUL.
I.D.
HDWE.
HDWD.
H.V.A.C.
HTG.
HR.
H.P.
HORIZ.
H.M.
HGT.
HDR. HEADER
JOIST
JANITOR
KITCHEN
JOINT
LABORATORY
JOIST HANGER
LAG BOLT
LAVATORY
LAMINATE
J.H.
JAN.
L.B.
LAV.
LAM.
LAB.
KIT.
JT.
JST.
EQUIV.
E.S.
E.W.
EXP.
EXP.B.
EXPO.
EXT.
F.
ENCL.
F.B.
F.BD.
F.BELL
F.B.O.
F.D.
FDN.
F.E.
FH.M.S.
F.HORN
F.F.
F.G.
FGL.
F.H.
F.E.C.
F.A.
FH.W.S.
FIN.
F.H.S.
ENCLOSURE
EQUIVALENT
EACH SIDE
EACH WAY
EXPANSION
EXPANSION BOLT
EXPOSURE
EXTERIOR
FLAT HEAD MACHINE
SCREW
SCREW
FIRE HORN
FIRE HOSE STATION
FLAT HEAD WOOD
FINISH
FLOOR DRAIN
FOUNDATION
FIRE EXTINGUISHER
FIRE EXTINGUISHER
FINISH FLOOR
FINISH GRADE
FIBERGLASS
FIRE HYDRANT
CABINET
FIRE ALARM
FACE BRICK
FIREBOARD
FIRE BELL
FURNISHED BY OTHERS
FACE
GALV. GALVANIZED
HOLLOW STRUC. STL.H.S.S.
FLUORESCENTFLOUR.
GENERAL CONTRACTORG.C.
E.W.C. ELECTRIC WATER CLOSET
FIRE VALVE CABINETF.V.C.
FOOD SERVICE EQUIPMENT
CONTRACTOR
F.S.E.C.
H.V.A.C. CONTRACTORH.C.
FIRE SUPPRESSION
CONTRACTOR
F.S.C.
PLASTIC LAMINATEP.LAM.
O.H.W.S.
SCREW
OVAL HEAD WOOD
APPROVAL)
PAPER TOWEL DISPENSER
PAPER TOWEL
PARTITION
DOUGLAS FIR
PRESSURE TREATED
REFLECTED CEILING
RADIUS
RUBBER BASE
QUARRY TILE
POLYVINYL-CHLORIDE
RECEPTACLE
R.C.P.
Q.T.
RAD.
R.B.
P.T.D.
PTN.
P.T.R.
P.V.C.
P.T.D.F.
REDWOOD
REFERENCE
REINFORCING
ROOF HATCH
ROUND HEAD METAL
RESILIENT
REFRIGERATOR
ROOF DRAIN
SCREW
ROOM
RAIN WATER LEADER
ROUGH OPENING
ROUND HEAD WOOD
SCREW
RDWD.
R.H.W.S.
R.W.L.
R.O.
RM.
R.H.M.S.
R.H.
RESIL.
REINF.
REFR.
REF.
R.D.
LIGHT
MATERIAL
LOW POINT
LIVE LOAD
LEFT HAND
MAT.
LT.
L.P.
L.L.
L.H.
MANHOLE
MINIMUM
MEDIUM
MANUFACTURER
MEMBRANE
MECHANICAL
MEDICINE CABINET
MACHINE BOLT
METAL
MASONRY OPENING
METAL THRESHOLD
MISCELLANEOUS
MODULAR
MOISTURE RESISTANT
MIRROR
M.C.
M.B.
MIN.
MH.
MFG.
MEMB.
MED.
MECH.
MIR.
MISC.
M.O.
MOD.
M.R.
M.T.
MTL.
MAX. MAXIMUM
NORTH
NATURAL
OVER
NUMBER
NOMINAL
NOT TO SCALE
NOT IN CONTRACT
OBSCURE
OUTSIDE DIAMETER
STUD
OFFICE
OUTSIDE FACE OF
ON CENTER
OVERFLOW
OVERALL
N.T.S.
O/ O.A.
OBS.
O.C.
O.D.
O.F.
OFF.
O.F.S.
(NOT PART OF OSA
N.
NAT.
N.I.C.
NO.
NOM.
PAINT
PLATE
PERFORATED
FOOT
POUNDS PER CUBIC
PANEL EDGE NAILING
PRESSED METAL
PAIR
FRAME
FOOT
POUNDS PER LINEAR
PLYWOOD
POUNDS PER SQUARE
PROPERTY
PLASTER
P.
P.C.F.
P.E.N.
PERF.
PL.
PLAS.
P.L.F.
PLYWD.
P.M.F.
PR.
P.S.F.
PROP.
OPP. OPPOSITE
POINT
PULL STATION
POUNDS PER SQUARE
INCH
P.STA.
PT.
P.S.I.
FOOT
(N) NEW
PLAN
REQUIREDREQD.
NON-COMBUSTIBLENON/COM
PLUMBING CONTRACTORP.C.
MECHANICAL, ELECTRICAL,
PLUMBING
M.E.P.
FRAMED MIRRORMR.
ROBE HOOKR.HK.
MOP HOLDERMP.H.
MOUNTEDMTD.
PAINTEDPTD.
TONGUE AND GROOVE
DRAWINGS
SOUTH
SEE CIVIL DRAWINGS
STORM DRAIN
SOLID CORE WOOD DOOR
DRAWINGS
SHEET
SIMILAR
SLIDING
SHEATHING
SHOWER
SECTION
SEALANT
SEE ELECTRICAL
SOLID BLOCKING
SOAP DISPENSER
SEE ARCHITECTURAL
S.E.D.
SHR.
SHT.
SIM.
SL.
SHTG.
S.BLKG.
S.A.D.
S.
SECT.
SEAL.
S.DISP.
S.D.
S.C.D.
SCWD
SQUARE
DRAWINGS
SPECIFICATION
SOUNDPROOF
DRAWINGS
STATION
STEEL
STORAGE
STANDARD
SUSPENDED
STRUCTURAL
DRAWINGS
STAINLESS STEEL
SEE MECHANICAL
SANITARY SEWER
SEE STRUCTURAL
SQUARE FOOT (FEET)
THICK
TEMPERED
TELEPHONE
TERRAZZO
TACKBOARD
TOP OF CURB
TRANSOM
TOP OF PLATE
TOP OF WALL
TOILET PAPER DISPENSER
TOE NAIL
TOOL JOINT
TOP OF PAVEMENT
TOP AND BOTTOM
T.O.C.
T.O.P.
T.O.PL.
T.O.W.
T.P.D.
TRN.
S.M.D.
SPEC.
S.P.
SQ.
S.S.D.
S. STL.
STO.
STL.
STD.
STA.
S.S.
SQ. FT.
T.B.
T&B.
TEL.
TEMP.
TER.
T&G.
SUSP.
T.J.
T.N.
THK.
STRUC.
S.L.D. SEE LANDSCAPE
TYPICAL
UNLESS NOTED OTHERWISE
URINAL
UNFINISHED
TELEVISION
VENT TO ROOF
VERTICAL
VESTIBULE
VERIFY IN FIELD
VINYL TILE
VINYL COMPOSITION
TILE
VERTICAL GRAIN
WEST
WITH
WINDOW
WOOD
WATER CLOSET
VINYL WALL COVERING
WITHOUT
WEIGHT
YARD
WATER PROOF
WATER HEATER
WATER COOLER
WELDED WIRE FABRIC
WATER RESISTANT
W/O
W.W.F.
W.P.
W.R.
WT.
YD.
T.V.
TYP.
UNF.
U.N.O.
V.C.T.
VERT.
VEST.
V.G.
V.I.F.
UR.
V.W.C.
W.
W/
W.C.
V.T.R.
W.F.
W.H
WDW.
WD.
V.T.
T.S. TUBE STEEL
SELF ADHERED SHEET
MEMBRANE
S.A.S.M.
SELF ADHERED FLEXIBLE
FLASHING
S.A.F.F.
WITHINW/IN
UNDERSIDEU/S
SANITARY NAPKIN
DISPOSAL
S.N.D.
T.S.C.D. TOILET SEAT COVER
DISPENSER
SANITARY NAPKIN
DISPENSER
S.N.V.
TOP OF SEATT.O.S.
SOUND ATTENUATION
BATT
S.A.B.
Name
Elevation
Room name
150 SF
S Y M B O L S
V.A. FURNISHED / CONTRACTOR
INSTALLED
(VC)
V.A. FURNISHED AND INSTALLED(VV)
SOLID WOOD DOORS.W.D.
C0
CC CONTRACTOR-FURNISHED,
CONTRACTOR INSTALLED
REMOVE AND RELOCATER
4' -0
M
IN
2'-6" MIN
1' -5
M
IN
1' -7
M
A X
SINK
CLEAR FLOOR
SPACE
4' -0
M
IN
2'-6" MIN
5'-0"
4' -1
1" F
LO
O
R M
O U
N T
4' -8
W
A
LL
H U
N G
1'-6" MAX
1'-4" MIN
1' -5
M
IN
1' -7
M
A X
WATER CLOSET
SINK
CLEAR FLOOR
SPACE
5'-0"
4' -1
1" F
LO
O
R M
O U
N T
4' -8
W
A
LL
H U
N G
1'-6" MAX
1'-4" MIN
4'-0" MIN
2' -6
M
IN
1'-7" MAX
WATER CLOSET
SINK
CLEAR FLOOR SPACE
CLEARANCE AT WATER CLOSET
CLEARANCE AT WATER CLOSET
CLEARANCE AT SINK
5'-6" TURNING RADIUS
O P
E R
A T
IN
G
M E
C H
A N
IS
M
M A
X T
O
PAPER TOWEL
DISPENSER WALL MTD
GARMENT HOOKSOAP
DISPENSER
SHOWER CURTAIN ROD
T O
B O
T T
O M
M
A X
SOAP DISH
TOWEL BAR
TOWEL PIN
HAND HELD
SHOWER
SHOWER HEAD
MIN 59"
LONG HOSE
M A
X
A
B O
V E
S
IN
K T
O B
/O R
E F
L S
U R
F A
C E
MIRROR TOILET PAPER
DISPENSER
M
A X
M
IN
MIN
1'-3"
C
LR
K N
E E
S P
A C
E
2' -3
M
IN
M A
X T
O R
IM
2' -1
0"
R E
F
LE
C T
E D
S U
R F
A C
E O
F M
IR
R
O R
3' -4
M
A X
T O
B O
MIRROR - VERIFY SIZE WITH
PLANS AND ELEVATIONS
MIN
8" DEEP
T O
R
IM
2' -1
0" M
A X
2'-1" MAX
1'-5" MIN
9" M
IN
9" M
IN
SIDE VIEW FRONT VIEW
CLEARANCE
6" MAX TOE
1'-5" MIN
LAVATORY
PLUMBING LINES
WITHIN HATCHED
AREA REQUIRED
TO BE INSULATED
LINES OF REQUIRED
CLEARANCE
FINISH FLOOR
4'-0" MIN CLR
2' -5
M
IN
5"
2' -3
M
IN
CLEAR SPACE
ALLOWABLE FOR
ACCESSIBILITY
MIRROR
2' -5
M
IN
LINES OF REQUIRED
CLEARANCE
5"
5/8" GYPSUM
BOARD
3" SOUND
ATTENUATION
BLANKETS
3-5/8" 20 GA. COLD
FORMED STEEL
2 LAYERS OF
5/8" GYPSUM
BOARD
3" SOUND
ATTENUATION
BLANKETS
3-5/8" 20 GA. COLD-
FORMED STEEL
FRAMING
5/8" GYPSUM
BOARD
1-1/2" HAT
CHANNEL AT 16"
O.C.
8" GROUT FILLED
CMU
8" GROUT FILLED
CMU
6" CMU
4" CMU
6 1/8" 9 3/4"
4 7/8" 4 1/4" 7 5/8" 5 5/8" 3 5/8"
MAX
1'-0" 3'-6" MIN
1' -7
M
A X
T O
S E
A T
1' -5
M
IN
T O
O U
T
LE
T O
F D
IS
P
E N
S E
R 1'
-3
M
IN
T O
'-0
M
A X
A F
F
3' -0
M
A X
T O
B A
R
2' -9
M
IN
9" MAX
7" MIN
GRAB BAR
1"
SANITARY NAPKIN
DISPOSAL AT WOMEN OR
UNISEX, SUGGESTED
LOCATION
GRAB BAR
3' -0
M
A X
T O
B A
R
2' -9
M
IN
1'-6" MAX
1'-4" MIN
SANITARY NAPKIN DISPOSAL AT
WOMEN OR UNISEX, SUGGESTED
LOCATION
1 1/2"
3'-0" MIN
6" MAX
2'-0" MIN 1'-0" MIN.
3'-0" MAX
3' -5
M
A X
3' -3
M
IN
1'
-6
M
IN
3'-5" MAX
3'-3" MIN VERTICAL GRAB BAR
TOILET PAPER
DISPENSER
4'-6" MIN
3' -5
M
A X
3' -3
M
IN
1'
-6
M
IN
SIDE WALL REAR WALL
VERTICAL GRAB BAR
FLOOR CLEARANCE
5'-0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\d u n n t\ D o c u m e n ts \R e v it \2
\A n n
A rb o r
B ld g
W B a s e m e n t (2 tj .d u n n
.r v t
/1
/2
:4
:3
P
M
GI002
WALL TYPES AND NOTES
01/13/2023 PQ JK
UPGRADE BASEMENT,
BUILDING 1 WEST
506-20-102
ANN ARBOR, MICHIGAN
BID DOCUMENTSANN ARBOR VA
MEDICAL
CENTER Approved: Veteran's Affairs Medical Center
1. TYPICAL PARTITION TYPE IS WALL TYPE "1" UNLESS NOTED OTHERWISE ON PLAN.
2. BUILD PARTITIONS IN ACCORDANCE WITH PARTITION SCHEDULE AND DESIGN REFERENCED. REFERENCES ARE TO LATEST EDITION OF GYPSUM ASSOCIATION (GA) FIRE RESISTANCE DESIGN MANUAL, OR TO UNDERWRITERS LABORATORY
(UL) FIRE RESISTANCE DIRECTORY.
3. ALL WALLBOARD IS TO BE TYPE "X" UNLESS NOTED OTHERWISE.
4. PARTITION TYPES INDICATED ARE CONTINUOUS TO A CORNER OR AN INTERSECTING PARTITION, UNLESS INDICATED OTHERWISE. WHERE PARTITIONS OF DIFFERENT THICKNESSES MEET, MAINTAIN A FLUSH SURFACE ON THE SIDE WHERE
FACES ARE STRAIGHT AND CONTINUOUS, UNLESS NOTED OTHERWISE.
5. METAL STUD GAUGES SCHEDULED ARE THE MINIMUM REQUIRED, AND MAY BE INCREASED BY SPECIFICATIONS TO ACCOMMODATE LOADS, FINISHES, OR UNBRACED CEILING HEIGHT LIMITS. DO NOT CONSIDER CEILING SYSTEM(S) AS A
PARTITION BRACING ELEMENT.
6. SOUND ATTENUATION BATTS (SAB) ARE TO BE PLACED IN ALL PARTITIONS WHICH ENCLOSE A ROOM UNLESS NOTED
OTHERWISE.
7. WOOD AND PLYWOOD BLOCKING TO BE FIRE RETARDANT TREATED (FRT).
8. EDGES OF GYPSUM WALL BOARD (GWB) LEFT EXPOSED TO VIEW, OR ABUTTING DISSIMILAR MATERIAL, IS TO BE FINISHED
WITH METAL "L" BEAD TRIM AND COMPOUND UNLESS NOTED OTHERWISE.
9. PARTITION SCHEDULE IS BASED ON THE USE OF GYPSUM WALL BOARD (GWB), BUT FACING BOARD MAY VARY, DEPENDENT ON FINAL FINISH SCHEDULED FOR THAT PARTITION: USE CEMENTITIOUS BACKER BOARD (CBB) WHERE CERAMIC TILE SCHEDULED IN "WET" AREAS; USE MOISTURE RESISTANT BOARD (MR) WHERE CERAMIC TILE SCHEDULED IN "DRY" AREAS; USE GYPSUM LATH (BLUE BOARD) WHERE VENEER PLASTER IS SCHEDULED. SEE FINISH SCHEDULE AND SPECIFICATIONS FOR PARTICULARS. AT ALL PLUMBING FIXTURES INSTALL 4X8 (MR) MOISTURE RESISTANT BOARD
CENTERED ON FIXTURE.
10. ALL FIRE RATED WALL AND FLOOR PENETRATION MUST COMPLY WITH ASTM-E814
11. ALL DOOR OPENINGS SHALL BE 4" FROM A PERPENDICULAR PARTITION TO OUTSIDE FACE OF FRAME, UNLESS NOTED OR
DETAILED OTHERWISE.
12. ALL PARTITIONS, INCL. STUDS, BOARD, SOUND ATTENUATION BLANKETS, ETC. TO EXTEND FROM TOP OF FLOOR SLAB TO
UNDERSIDE OF CONCRETE SLAB ABOVE UNLESS OTHERWISE NOTED.
13. CONTRACTOR IS TO CLOSE OFF ANY VOIDS LEFT AS A RESULT OF ANY REMOVALS AND NEW CONSTRUCTION, AS WELL AS INFILL ANY EXISTING VOIDS IN NEWLY DESIGNATED FIRE RATED PARTITIONS. ALL PATCHES SHALL MATCH AND ALIGN
WITH SURROUNDING MATERIALS AND SHALL BE IN ACCORDANCE WITH NFPA CODE.
14. REFER TO NEW ARCHITECTURAL FLOOR PLANS FOR PARTITION TYPE DESIGNATIONS.
15. CONTRACTOR SHALL SEAL PARTITION WALLS AROUND ALL M.E.P. PENETRATIONS OR OPENINGS, RESULTING FROM M.E.P.
INSTALLATIONS INCLUDING BUT NOT LIMITED TO THE SLAB, ABOVE AND BELOW CEILINGS.
16. ALL NEW MASONRY WORK INCLUDING NEW PARTITIONS, INFILL AND PATCHING; MATCH EXISTING COURSING AND TOOTH
IN WITH EXISTING ADJ. CONSTRUCTION.
17. NO EXISTING FIREPROOFING IS TO BE REMOVED FROM EXISTING BUILDING STRUCTURE FOR ANY NEW INSTALLATION FOR
ANY REASON.
18. IN AREAS OF TOILET ROOMS AND OTHER PLUMBING FIXTURES SUCH AS MOP BASINS, SINKS, SHOWERS, TOILETS, ETC. A TYPE 'X' MOISTURE RESISTANT GYPSUM WALLBOARD SHALL BE USED FOR THE WALL CONSTRUCTION. WHERE CERAMIC
TILE IS SCHEDULED; CEMENTITIOUS BOARD SHALL BE USED FOR THE WALL CONSTRUCTION.
19. UNLESS NOTED, THE CONNECTION AT THE TOP OF THE PARTITION TO THE STRUCTURE ABOVE MUST ALLOW FOR 1" MINIMUM VERTICAL MOVEMENT, EITHER UP OR DOWN. AT FIRE RATED METAL STUD PARTITIONS, THE TOP CONNECTION MUST BE A FIRE STOP CONNECTION THAT ALLOWS 1" MINIMUM VERTICAL MOVEMENT, EITHER UP OR DOWN. HOLD GYPSUM WALL BOARD AND STEEL STUDS 1" FROM THE BOTTOM OF THE STRUCTURE ABOVE. DO NOT SCREW-ATTACH STEEL VERTICAL STUDS OR GYPSUM WALL BOARD TO THE TOP TRACK. INSTALL BRIDGING 12" MINIMUM FROM THE TOP OF
THE STUDS.
TYPE 1 (U.N.O.)
ONE LAYER OF 5/8" GYPSUM BOARD ON
EACH SIDE OF 3-5/8" 20 GA. COLD-
FORMED STEEL FRAMING @ 16" O.C.
WITH 3" SOUND ATTENUATION
BLANKETS IN STUD SPACE. EXTEND
STUDS, BOARD, AND BLANKETS FULL
HEIGHT TO DECK ABOVE.
UL DESIGN U419 - 1 HR RATED
SA-870717 - STC 49
TYPE 1A NON-RATED WALL
SAME AS TYPE 1 EXCEPT EXTEND
STUDS, BOARDS, AND BLANKETS TO
12'-0" A.F.F.
DIAGONAL BRACE AT 48" ON CENTER
TYPE 1B NON-RATED WALL
SAME AS TYPE 1 EXCEPT EXTEND
STUDS, BOARDS, AND BLANKETS TO
9'-0" A.F.F.
TYPE 2
ONE LAYER OF 5/8" GYPSUM BOARD
ON ROOM SIDE OF 3-5/8" 20 GA. COLD-
FORMED STEEL FRAMING @ 16" O.C.
WITH 3" SOUND ATTENUATION
BLANKET IN STUD SPACE. EXTEND
STUDS, BOARD AND SOUND BLANKETS
FULL HEIGHT TO DECK ABOVE.
ATTACH TO STRUCTURE ABOVE W/
VERTICAL SLIP CONNECTIONS. HOLD
FRAMING 1/2" OFF EXISTING WALLS,
WHERE APPLICABLE.
1. PROVIDE MINIMUM 20 GAUGE CFS FRAMING AT ALL WALLS.
2. PROVIDE DOUBLE STUDS AT JAMBS OF DOOR AND FIXED GLASS FRAMES, AT OPEN PARTITION ENDS, AND WHERE
PARTITION IS TO RECEIVE WALL MOUNTED SHELVES, CASEWORK, PLUMBING FIXTURES, ETC.
3. USE 5/8" TYPE X GYPSUM BOARD, ANCHOR W/ SCREWS AT 8" O.C. ON EDGES AT 12" O.C. IN FIELD PER UL DESIGN
NUMBERS LISTED.
4. SEE SPECIFICATIONS FOR GYPSUM BOARD REQUIREMENTS AT TOILETS AND ALL WET AREAS.
5. FOR LOCATIONS OF EXISTING AND NEW FIRE-RATED PARTITIONS, SEE LIFE SAFETY PLANS.
6. PROVIDE ADDITIONAL BRACING AS REQUIRED AT ALL WALL STUD INSTALLATIONS EXCEEDING STUD MANUFACTURER
REQUIREMENTS FOR MAXIMUM ALLOWED HEIGHT AND DEFLECTION.
S T U D G A U G E N O T E S
1/4" = 1'-0"
TYP. CLEAR FLOOR SPACES
1/2" = 1'-0"
RESTROOM FIXTURES AND ACCESSORIES
1/2" = 1'-0"
TYP. ACCESSIBLE LAVATORY CLEARANCE
TYPE 3
8" GROUT FILLED CMU
UL DESIGN U905 - 2 HR RATED
TYPE 4
6" STANDARD CMU
TYPE 5
4" SOLID CMU
TYPE 6
NOT USED
G E N E R A L P A R T I T I O N N O T E S
TYPE 8
8" GROUT FILLED CMU WITH ONE
LAYER OF 5/8" GYPSUM BOARD ON 1
1/2" HAT CHANNEL
UL DESIGN U905 - 1 HR RATED
TYPE 7
TWO LAYERS OF 5/8" GYPSUM BOARD
ON EACH SIDE OF 3-5/8" 20 GA. COLD-
FORMED STEEL FRAMING @ 16" O.C.
WITH 3" SOUND ATTENUATION
BLANKETS IN STUD SPACE. STAGGER
GYPSUM BOARD JOINTS. EXTEND
STUDS, BOARD, AND BLANKETS FULL
HEIGHT TO DECK ABOVE. FIRE CAULK
ALL PENETRATIONS. SEE PARTITION
NOTES THIS DWG.
UL DESIGN U419 - 2 HR RATED
1/2" = 1'-0"
ACCESSIBLE TOILET CLEARANCE
TYPE 2A
SAME AS TYPE 2 EXCEPT 2-1/2" 16 GA.
COLD-FORMED STEEL FRAMING @ 16"
O.C. WITH 2" SOUND ATTENUATION
BLANKET IN STUD SPACE.
TYPE 2B
SAME AS TYPE 2 EXCEPT 2-1/2" 16 GA.
COLD-FORMED STEEL FRAMING @ 16"
O.C. WITH 2" CLOSED-CELL FOAM
INSULATION.
ALL PERSONNEL ENTERING THE CONSTRUCTION SITE AREA MUST WEAR A HARD HAT AND SAFETY GLASSES ALONG
WITH ANY OTHER PPE REQUIRED IN THAT AREA.
ALL APPLICABLE FORMS SHALL BE COMPLETED AND APPROVED PRIOR TO STARTING WORK.
PERMITS TO INCLUDE:
ICRA, ILSM, ABOVE CEILING, FIRE SPRINKLER SYSTEM, UTILITY SHUT-DOWN, FIRE / SMOKE WALL, FIRE ALARM
SYSTEM.
THE CONSTRUCTION AREA MUST MAINTAIN A NEGATIVE PRESSURE VENTILATION. NEGATIVE AIR UNIT SHALL BE MAINTAINED WITH FILTER REPLACEMENT(S) PER SPECIFICATIONS (WEEKLY REPLACEMENT OF PRE-FILTER OR AS NECESSARY). HEPA FILTER SHALL BE REPLACED MONTHLY. CLEAN ALL EXTERIOR SURFACES OF CARTS AND TOOLS AT THE END OF EACH SHIFT. MONITOR NEGATIVE PRESSURE AND POST LOG AT THE END OF EACH SHIFT.
CONSTRUCTION CLASS WILL BE DETERMINED BY THE CONSTRUCTION SAFETY COMMITTEE.
DURING CONSTRUCTION BE CERTAIN THAT:
• BARRIERS ARE INTACT AND MAINTAINED.
• PARTICLE COUNT METER IS AVAILABLE.
• NEGATIVE INDICATOR IS AVAILABLE.
• INSPECTED / DATED FIRE EXTINGUISHER(S) ARE AVAILABLE AND MOUNTED PROPERLY.
• ICRA REQUIREMENTS ARE INTACT AND VERIFY THAT THEY ARE BEING MAINTAINED.
• WALK-OFF MATS AND STICKY MATS ARE MAINTAINED PROPERLY.
CONTRACTOR SHALL MAINTAIN BARRIERS, CONFIRM NEGATIVE CONSTRUCTION SPACES, AND DOCUMENT ICRA
REQUIREMENTS DAILY.
SEE SPECIFICATIONS FOR MORE INFECTION CONTROL INFORMATION.
A
B
C
D
E
F
G E N E R A L N O T E S
G
H
FINISHED FLOORING TO BE KEPT CLEAN. FLOORS
NOT BEING REPLACED TO BE PROTECTED OR
COVERED WITH ROSEN PAPER / FIRE RATED
PLYWOOD
FIRE / U.L. RATED PLASTIC TO
PREVENT DUST INFILTRATION
(INSTALL PRIOR TO
CONSTRUCTION)
FIRE / U.L. RATED PLASTIC TO
PREVENT DUST INFILTRATION
(INSTALL PRIOR TO
CONSTRUCTION)
EXISTING FIRE
SPRINKLER SYSTEM
EXISTING WALLEXISTING WALL
EXISTING CONCRETE SLAB FLOORING
HEATED DETECTOR CUT-OFF
HEPA NEGATIVE AIR UNIT
FIRE RATED PLYWOOD
(TEMP. REMOVE GLASS
PANEL)
EXISTING WINDOW FRAME
LOW RISK GROUP
CONSTRUCTION PROJECT TYPE
MEDIUM RISK GROUP
HIGH RISK GROUP
HIGHEST RISK GROUP
RISK RELATED GROUP TYPE A TYPE B TYPE C TYPE D
I II II III/IV
II
II III/IV
III/IV
III
III/IV
IV
IV
IV
I
I
II
CONSTRUCTION PROJECT BY PATIENT RISK
IC MATRIX - CLASS OF PRECAUTIONS:
INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND RISKNOTE:
LEVEL INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY.
C
LA
S S
I
II
1. REMOVE OR ISOLATE H.V.A.C. SYSTEM IN AREA WHERE WORK IS BEING DONE TO
PREVENT CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS IE. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL
AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH
PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR
VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS IF INDICATED.
4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
6. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS
INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL
DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL SERVICES
DEPARTMENT.
1. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION.
2. VACUUM WORK AREA WITH HEPA FILTERED VACUUM.
4. WET MOP AREA WITH DISINFECTANT.
5. REMOVE ISOLATION OF H.V.A.C. SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
PRIOR TO ANY CONSTRUCTION
POST CONSTRUCTION
7. PLACE A WALK-OFF MAT AND A STICKY MAT AT ENTRANCE AND EXIT WORK AREAS.
3. REMOVE AND DISCARD WALK-OFF MAT AND STICKY MAT AT ENTRY AND WORK AREAS.
8. PROVIDE INSPECTED/DATED FIRE EXTINGUISHER(S) IN THE WORK AREAS.
CLASS III WORK ITEMS NOTES:
EXISTING CONCRETE SLAB FLOORING
FLEX DUCT
HEPA NEGATIVE AIR UNIT
FLEX DUCT
PLASTIC WINDOW (ON
ALL SIDES
ZIPPER SIDE ENTRY
MOBILE CONTAINMENT CART WITH
CANVAS / 1-1/4" SQUARE STEEL
TUBULAR FRAME
SWIVEL CASTERS TWO WITH
LOCKING OUTTER BRAKES
A D
JU
S
T A
B
LE
H
E
IG
H T
A D
JU
S
T A
LE
H
E
IG
H T
FIRE / U.L. RATED PLASTIC TO
PREVENT DUST INFILTRATION
(INSTALL PRIOR TO
CONSTRUCTION)
LOW RISK
OFFICE AREAS
PATIENT RISK GROUPS
MEDIUM RISK HIGH RISK HIGHEST RISK
CARDIOLOGY CCU ANY AREA CARING FOR
ECHOCARDIOGRAPHY
ENDOSCOPY
NUCLEAR MEDICINE
PHYSICAL THERAPY
RADIOLOGY/MRI
RESPIRATORY THERAPY
EMERGENCY ROOM
LABOR & DELIVERY
LABORATORY (SPECIMEN)
NEWBORN NURSERY
OUTPATIENT SURGERY
PEDIATRICS
IMMUNOCOMPROMISED PATIENTS
BURN UNIT
CARDIAC CATH LAB
CENTRAL STERILE SUPPLY
INTENSIVE CARE UNITS
MEDICAL UNIT
PHARMACY
POST ANESTHESIA CARE UNIT
SURGICAL UNITS
NEGATIVE PRESSURE ISOLATION ROOMS
ONCOLOGY
OPERATING ROOMS INCLUDING
C-SECTION ROOMS
POST ICRA, ILSM, FIRE
INSPECTION SHEETS VISIBLE
TO PUBLIC
SUSPENDED PLASTIC ZIPPER WALL
CURTAIN BARRIER
A P
P R
O X
A
.F .F
INDICATOR MUST BE AT -0.01 OR GREATER (VERIFY
DAILY), IF NOT VERIFY ALL OPENINGS, SUCH AS DOORS,
ARE CLOSED AND/OR CHANGE OUT NEGATIVE AIR PRE-
FILTER.
INDICATOR (REFER TO PLAN
& ELEVATION)
C.O.R. CONTACT INFO
CONST. SUPERVISOR
NAME AND CELL
PHONE
CHILLER PLANT AFTER HOURS
CONTACT PHONE NUMBER FIRE
EMERGENCY DIAL 911
PERSONNEL ENTERING MUST HAVE: HARD HAT, SAFETY GLASSES
AND PROPER I.D.
THIS IS A
RESTRICTED AREA
AREA UNDER CONSTRUCTION
PAPER CADDY
ICRA, ILSM, FIRE WATCH,
MISC. FORMS
FRAMED COPY OF C.O.R.
CERTIFICATION
A A
SUSPENDED PLASTIC ZIPPER WALL
CURTAIN BARRIER
POST ICRA, ILSM, FIRE INSPECTION SHEETS
VISIBLE TO PUBLIC
PROVIDE STICKY MATS (CHANGED END OF
SHIFT OR MORE IF NECESSARY TO MAINTAIN
CLEANLINESS)
INDICATOR MUST BE AT -0.01 OR GREATER (VERIFY DAILY).
IF NOT, VERIFY ALL OPENINGS, SUCH AS DOORS, ARE
CLOSED AND / OR CHANGE OUT NEGATIVE AIR PRE-FILTER
PROVIDE A 6'-0" x 4'-0" WALK OFF MAT
INSIDE OF WORK AREA (CHANGE
WHEN NECESSARY TO MAINTAIN
CLEANLINESS)
FIRE EXTINGUISHER ON PORTABLE
FLOOR BRACKET (ILSM MAY REQUIRE
MORE THAN ONE)
TAPE ALL SERVICES TO PROTECT
AGAINST CONTAMINATION
OPTIONAL EXHAUST DUCTS (COVER
THE GRATES AND THE DIFFUSERS)
SUPPLY DUCTS EITHER KEEP
RUNNING OR COVER WHEN
RUNNING TO KEEP DUST OUT
COVER ALL RETURNS AT THE
GRATE / DIFFUSERS
OUTSIDE OF BUILDING
E
A
O
V
MONTHLY CHANGED HEPA
FILTER
HEPA NEGATIVE AIR UNIT
WEEKLY CHANGED (OR
MORE AS NEEDED) PRE-
FILTER
FIRE RATED PLYWOOD (REFER TO
ELEVATION)
F
LE
X D
U C
T
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\d u n n t\ D o c u m e n ts \R e v it \2
\A n n
A rb o r
B ld g
W B a s e m e n t (2 tj .d u n n
.r v t
/1
/2
:4
:3
P
M
GI003
ICRA CLASS III REQUIREMENTS
01/13/2023 PQ JK
UPGRADE BASEMENT,
BUILDING 1 WEST
506-20-102
ANN ARBOR, MICHIGAN
BID DOCUMENTSANN ARBOR VA
MEDICAL
CENTER Approved: Veteran's Affairs Medical Center
1/2" = 1'-0"
CROSS-SECTION 'A-A' CLASS III
1/2" = 1'-0"
MOBILE CONTAINMENT CART (CONST. BARRIER TYPES)
NTS
ICRA III (IDEAL) - ROOM ELEVATION
1/2" = 1'-0"
TYPICAL CONSTRUCTION LAYOUT CLASS III
C
A
C A
A
A
C
A
A
A
C C
FULLER CT.
FULLER ROAD
GI101
Sim
BUILDING 1W
BUILDING 1E
BUILDING 28
PARKING
GARAGE
EXISTING
LOADING DOCK PROPOSED CONTRACTOR STAGING AREA
(500 SF.)
PROPOSED ADDITIONAL CONTRACTOR
STAGING AREA (500 SF.)
CONSTRUCTION TRAILER
- VA TO PROPOSE LOCATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\d u n n t\ D o c u m e n ts \R e v it \2
\A n n
A rb o r
B ld g
W B a s e m e n t (2 tj .d u n n
.r v t
/1
/2
:4
:4
P
M
GI101
CONTRACTOR STAGING
01/13/2023 PQ JK
UPGRADE BASEMENT,
BUILDING 1 WEST
506-20-102
ANN ARBOR, MICHIGAN
BID DOCUMENTSANN ARBOR VA
MEDICAL
CENTER Approved: Veteran's Affairs Medical Center
1" = 200'-0"
SITE PLAN - OVERALL
1" = 30'-0"
SITE PLAN - LOADING DOCK
G E N E R A L N O T E S
A. CONTRACTOR SHALL RESEED AND STRAW ALL DISTURBED GRASSED AREAS TO RETURN IT TO
ITS PRE-CONSTRUCTION CONDITION.
B. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THEIR OWN DUMPSTER, DETERMINE
THE LOCATION OF THE DUMPSTER ONSITE AND OBTAIN VA APPROVAL THROUGH THE COR FOR
THE PROPOSED LOCATION.
OVERPASS WITH 15'-6" CLEARANCE
2 3 4 5
A
B
B.5
C
2.5
A
28-S501
G
28-S501
F
28-S501
/8
14' - 0" 18' - 0" 16' - 0" 20' - 5"
18' - 2 5/8" 20' - 0" 10' - 0"
W8X10 W8X10 W10X12
W X
W X
W X
W X
W X
2' - 7"
18' - 10 1/4"
AA
4.2
W8X10W8X10
C9X20
C9X15
C9X15
C9X20
W8X10
C9X20
C9X20
6" NON-COMPOSITE
CONCRETE SLAB W/
1.5C22 STEEL DECKING
AND 4X4-W4.0XW4.0
4'
/2
DO
DO
DO
DO
DO
12K1 SQUARE END JOISTS (TOTAL LOAD OF 1100 LB/LF) NO CAMBER
HORIZONTAL BRIDGING
PER MANUFACTURER
5' - 7 7/8" 10' - 2" 18' - 0" 2' - 2" 6' - 8" 6' - 7 1/4" 20' - 11 3/4" 2' - 7"
EXISTING CURTAIN WALL
9'
/2
V .I.
F
5" NON-COMPOSITE CONCRETE
SLAB W/ 1.5C22 STEEL DECKING
AND 4X4-W2.9XW2.9
C9X15
C9X15
12K1 SQUARE END JOISTS (TOTAL LOAD OF 1100
LB/LF) NO CAMBER
V .I.
F
/8
8' - 8"
V .I.
F
9'
/2
SAWCUT EXIST. SLAB
L X
X
/4
L X
X
/4
DO
DO
L X
X
/4
L3X3X1/4 TO SUPPORT
DECK (TYP.3 SIDES)
L3X3X1/4
6' - 6" OPENING
1'
4"
5'
O P
E N
IN
G
1'
1/ 4"
1' - 7"
D
28-S501
DUCT BELOW SLAB
H
28-S501
E Q
E Q
E Q
E Q
E Q
E Q
E Q
E Q
CUSTOM FABRICATE JOISTS
TO ACCOMMODATE FOR
DUCT
H
28-S501
SIM
1/
2"
C X
4" 8'
/2
4"
C
28-S501
C
28-S501
C X
.4
4 3/8"
2"
C9X15
C9X15 +L4X4X1/4
EXTENT OF L4X4X1/4
1'
28-S501
28-S501
SIM.
OPP. HAND
H
28-S501SIM
1' - 2"
2' - 8 1/4"
2' - 0" 3' - 1 1/8"
(1) #4 X 12" REENTRANT
CORNER BARS (TYP)
DUCT OPNG
DUCT OPNG
SLOPE 1/4" PER 1'-0" TO
SHOWER DRAIN. REFER TO
ARCH FOR DIMENSIONS
2 3
B
2.5
AA
NOTES:
1. REFER TO MECHANICAL DRAWINGS FOR FLUID COOLER LOCATION.
2. CONTRACTOR SHALL FIELD VERIFY EXISTING FRAMING SIZES. CONSULT WITH STRUCTURAL ENGINEER IF ANY DISCREPANCIES.
3. COORDINATE ALL DIMENSIONS WITH EQUIPMENT SELECTION.
4. ALL STEEL TO BE GALVANIZED.
E X
. W
X
E X
. W
X
W6X15
W6X15
W X
W X
5' - 10 1/8" +/- 11' - 8 1/4"
8'
/4
1'
1/ 8"
EX. W24X68
W X
HSS3-1/2X3-1/2X1/4
(TYP.)
I
28-S501
EQ EQI
28-S501
EX. W16X26
28-S501
TYP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\c ra ig \O n e D ri v e \D o c u m e n ts
\A n n A rb o r
B ld g c ra ig .l ie g ib e l@ ff e
-s e rv .c o m
.r v t
/1
/2
:5
:4
P
M
28-S101
STRUCTURAL NEW WORK
01/13/2023 PM CL
UPGRADE BASEMENT, BUILDING 1
WEST
506-20-102
ANN ARBOR, MICHIGAN
BID DOCUMENTS
ANN ARBOR VA
MEDICAL
CENTER Approved: Veteran's Affairs Medical Center
1/4" = 1'-0"
FRAMING PLAN
MORGUE/AUTOPSY
RAMP (CORRIDOR)
150 PSF
100 PSF
LIVE LOADOCCUPANCY OR USE
TABLE 1: MIN. UNIFORMLY DISTRIBUTED LIVE LOADS
ABBREVIATIONS
V.I.F VERIFY IN FIELD
COL. COLUMN
EX. EXISTING
CONC. CONCRETE
S.O.G. SLAB ON GRADE
EXP. EXPANSION
G E N E R A L N O T E S
A. ALL WIDE FLANGE BEAMS TO BE ASTM A50 U.N.O.
B. ALL CHANNELS AND OTHER STEEL TO BE ASTM A36 U.N.O.
C. STEEL DECKING TO BE ASTM A653.
D. CONCRETE STRENGTH
F'c = 3000 PSI (NON-COMPOSITE SLAB) F'c = 4000 PSI (SLAB ON GRADE)
E. ALL REINFORCING SHALL BE HIGH STRENGTH DEFORMED BARS,
GRADE 60, ASTM A615, WITH 60,000 PSI MINIMUM YIELD STRENGTH.
F. WELDING ELECTRODES TO BE E70XX.
OPNG OPENING
N
REQ'D REQUIRED
OPP. OPPOSITE
DWL DOWEL
O.C. ON CENTER
1/4" = 1'-0"
ROOF FRAMING PLAN
B.5
EX. WALL
EX. COLUMN
1/
2" 3"
1/
2"
1"
4"
L3X3 OR AS REQ'D
L3X3X1/4
C 9X
.4
C9X20
1 3/4"
1 1/4"
(2) 1/2" EXP. ANCHORS
4 3/8"
1/ 2"
3/4" X 4 1/2" (MIN) WELDED STUDS
(TYP. BOTH SIDES OF OPENING)
FILL CELL ON EACH SIDE
OF OPENING
EXISTING CMU
W8 X 18
EACH SIDE
0' - 8" BEARING
OPENING
(TYP.)
0' - 3"
(TYP.)
0' - 3"
COMPACTED SOIL
NEW PIPE - REFER TO PLUMBING
SAWCUT EXISTING SLAB
#4 BAR @ 18" O.C.
(TYP.)
#4 CONT. (BOTH SIDES)
APPLY BONDING AGENT (TYP.)
NEW CONCRETE
1' - 6"
4" BAR W/ EPOXY
GROUT @ 18" O.C.
(TYP. EACH SIDE)
VAPOR BARRIER
NOTE:
1. REFER TO PLUMBING DRAWINGS FOR LOCATIONS OF NEW UNDERGROUND PIPING.
2. DO NOT CUT EXISTING COLUMN FOUNDATIONS.
2 4 5 62.5
4 3/8"
LANDING
6' - 0"
RAMP
30' - 0"
LANDING
7' - 0"
RAMP
30' - 0"
2' - 7"20' - 9 3/8"6' - 9 5/8"2' - 2"18' - 0"10' - 2"3' - 10"1' - 10"
2" EXP. JOINT
3'
C9
ONE PIECE - BENT C9
#4 @ 18" O.C.
W10
W10
W10
EL. = 813'-2 1/2"
EL. = 814'-8 1/2"
EL. = 816'-2 1/2"
EX. W8X58
6' - 8"
NEW OPENING - SEE
LINTEL BEARING DETAIL
END OF CHANNEL
AND DECKING
EXISTING S.O.G
END OF RAMP
#4 DWL @ 12" O.C.
W/ 3" EMBED.
& EPOXY GROUT
ROUGHEN AND APPLY
BONDING AGENT PRIOR
TO POURING CONCRETE
28-S501
E
C9
5' - 9"5' - 0"
EL. = 814'-4 5/8"…