This document contains a table of contents for construction specifications and a pre-solicitation notice for an upcoming federal procurement. The table of contents outlines the sections and subsections for a construction project to renovate approximately 14,000 square feet of existing basement, sub-basement, electrical shop, and recreation therapy office space at the LTC Charles S. Kettles Veterans Administration Medical Center in Ann Arbor, Michigan. Mechanical, electrical, and plumbing systems will be upgraded, and asbestos abatement is included. The pre-solicitation notice indicates the Department of Veterans Affairs intends to issue an invitation for bid on or around March 20, 2023 for Project 506-20-102. The project magnitude is estimated between $1 million and $5 million. The contract will be a firm fixed price awarded within 120 days of bid opening. This acquisition is set aside solely for qualified Service-Disabled Veteran Owned Small Businesses.

View the file

Other files

File Type Posted
Notice of Award Contract 36C25024C0025 Oct 31 - 506-20-102.pdf PDF
36C25023B0027 0007.pdf PDF
36C25023B0027 0006.pdf PDF
14.15_E602 - PANELBOARD SCHEDULES RFI 28 - 506-20-102.pdf PDF
1-AE114 - PHASE A5 NEW WORK PLAN RFI 29 - 506-20-102.pdf PDF
105126 Plastic Lockers for RFI 29 Answer - 506-20-102.pdf PDF
1-AE112 - PHASE A3 NEW WORK PLAN RFI 29 - 506-20-102.pdf PDF
123100 Metal Casework for RFI 29 Answer - 506-20-102.pdf PDF
36C25023B0027 0005.pdf PDF
14.03_1-EP101 - BASEMENT POWER PLAN - NEW WORK - RFI 28 - 506-20-102.pdf PDF
36C25023B0027 0004.pdf PDF
S04 - Pre-Bid 2nd Site Visit Agenda - 506-20-102.pdf PDF
S04 - Pre Bid 2nd Site Visit Attendance Log - 506-20-102 signed.pdf PDF
BID SPECIFICATIONS 2023-0510 Update - 506-20-102.pdf PDF
36C25023B0027 0003.pdf PDF
Addendum 01 Section 11 41 21 - 506-20-102.pdf PDF
36C25023B0027 0002.pdf PDF
RFI No. 14 Drawing Q and A - 506-20-102.pdf PDF
Asbestos Assessment-07.2022 - 506-20-102.pdf PDF
Addendum 01 Section 11 73 00 - 506-20-102.pdf PDF
Addendum 01 Section 01 00 00 - 506-20-102.pdf PDF
S04 - Pre-Bid Walk Through Attendance Sheet signed - 506-20-102.pdf PDF
36C25023B0027 0001 - 506-20-102.pdf PDF
S04 - Pre-Bid Site Visit Agenda signed - 506-20-102.pdf PDF
RFI Form - 506-20-102.pdf PDF
EMR Certification Form - 506-20-102.pdf PDF
Brand Name Only Justification Security Cameras - 506-20-102.pdf PDF
Brand Name Only Justification Fire Alarm System - 506-20-102.pdf PDF
Brand Name Only Justification Nuclear Storage Flooring - 506-20-102.pdf PDF
Drawings - 506-20-102.pdf PDF
Brand Name Only Justification Building Controls - 506-20-102.pdf PDF
36C25023B0027 Apr 6 - 506-20-102.pdf PDF
SPECIFICATIONS 2023-0405 - 506-20-102.pdf PDF
Wage Determination MI20230101 Feb 24 - 506-20-102.pdf PDF
36C25023B0027.docx DOCX document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 05 – 5/17/2023 Ann Arbor VAMC: Project #506-20-102 Upgrade Basement Bldg. 1-West

09-01-19

00 01 10-1

TABLE OF CONTENTS

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

DIVISION 00 - SPECIAL SECTIONS DATE

00 01 15 List of Drawing Sheets 07-15

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 12-18 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 04-13 01 33 23 Shop Drawings, Product Data, and Samples 05-17 01 35 26 Safety Requirements 02-17 01 42 19 Reference Standards 09-19 01 45 00 Quality Control 03-19 01 45 29 Testing Laboratory Services 11-18 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 09-13 01 81 13 Sustainable Construction Requirements 10-17 01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17 02 82 11 Asbestos Abatement 04-19 02 82 13.13 Glovebag Asbestos Abatement 09-15 02 82 13.19 Asbestos Floor Tile and Mastic Abatement 09-15 02 83 33.13 Lead-Based Paint Removal and Disposal 08-16

DIVISION 03 – CONCRETE

03 30 53 (Short-Form) Cast-in-Place Concrete 02-16

DIVISION 04 – MASONRY

04 05 13 Masonry Mortaring 10-17 04 05 16 Masonry Grouting 02-16 04 20 00 Unit Masonry 08-17 04 72 00 Cast Stone Masonry 02-15

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-18 05 21 00 Steel Joist Framing 11-18

09-01-19

00 01 10-2

TABLE OF CONTENTS

05 50 00 Metal Fabrications 08-18

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17 06 16 63 Cementitious Sheathing 02-16 06 20 00 Finish Carpentry 08-16

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 13 Thermal Insulation 10-17 07 81 00 Applied Fireproofing 10-17 07 84 00 Firestopping 02-16 07 92 00 Joint Sealants 10-17 07 95 13 Expansion Joint Cover Assemblies 02-16

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 08-16 08 14 00 Interior Wood Doors 02-16 08 31 13 Access Doors and Frames 02-16 08 41 13 Aluminum-Framed Entrances and Storefronts 01-21 08 71 00 Door Hardware 08-19 08 71 13 Automatic Door Operators 02-16 08 80 00 Glazing 10-15 08 90 00 Louvers and Vents 05-15

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 02-15 09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 06-18 09 30 13 Ceramic/Porcelain Tiling 09-15 09 51 00 Acoustical Ceilings 12-18 09 54 23 Linear Metal Ceilings 10-15 09 65 13 Resilient Base and Accessories 02-16 09 65 16 Resilient Sheet Flooring 05-18 09 65 19 Resilient Tile Flooring 05-18 09 67 23.30 Resinous (Epoxy Resin Composition) Mortar Flooring (RES-3) 07-14 09 67 23.60 Resinous (Urethane and Epoxy Mortar) Flooring (RES-6) 07-14 09 91 00 Painting 01-16 09 96 59 High-Build Glazed Coatings 07-14

DIVISION 10 – SPECIALTIES

10 14 00 Signage 10-15 10 26 00 Wall and Door Protection 10-15

09-01-19

00 01 10-3

TABLE OF CONTENTS

10 28 00 Toilet, Bath, and Laundry Accessories 02-16 10 44 13 Fire Extinguisher Cabinets 08-18 10 51 26 Plastic Lockers N/A

DIVISION 11 – EQUIPMENT

11 41 21 Walk-In Coolers and Freezers (VA Furnished, Contractor Installed) 05-15 11 73 00 Ceiling Mounted Patient Lift System 01-17 11 78 00 Mortuary Equipment 11-11 11 78 13 Mortuary Refrigerators (VA Furnished, Contractor Installed) 11-11

DIVISION 12 – FURNISHINGS

12 31 00 Manufactured Metal Casework 01-21 12 32 00 Manufactured Wood Casework 09-15 12 36 00 Countertops 12-18

DIVISION 13 - SPECIAL CONSTRUCTION

Not Used

DIVISION 14– CONVEYING EQUIPEMENT

Not Used

DIVISION 21- FIRE SUPPRESSION

21 08 00 Commissioning of Fire Suppression System 11-16 21 13 13 Wet-Pipe Sprinkler Systems 06-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 07-16 22 05 23 General-Duty Valves for Plumbing Piping 09-15 22 07 11 Plumbing Insulation 09-19 22 11 00 Facility Water Distribution 09-15 22 13 00 Facility Sanitary and Vent Piping 09-15 22 40 00 Plumbing Fixtures 09-15 22 66 00 Chemical-Waste Systems for Laboratory and Healthcare Facilities 09-20

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 02-20

23 05 12 General Motor Requirements for HVAC and Steam Generation Equipment 02-20

23 05 41 Noise and Vibration Control for HVAC Piping and Equipment 02-20

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20

09-01-19

00 01 10-4

TABLE OF CONTENTS

23 07 11 HVAC and Boiler Plant Insulation 02-20

23 08 00 Commissioning of HVAC Systems 02-20

23 09 23 Direct-Digital Control System for HVAC 09-11 23 21 13 Hydronic Piping 02-20

23 21 23 Hydronic Pumps 02-20

23 22 13 Steam and Condensate Heating Piping 02-20

23 23 00 Refrigerant Piping 02-20

23 25 00 HVAC Water Treatment 02-20

23 31 00 HVAC Ducts and Casings 02-20

23 34 00 HVAC Fans 02-20

23 36 00 Air Terminal Units 02-20

23 37 00 Air Outlets and Inlets 02-20

23 40 00 HVAC Air Cleaning Devices 03-20

23 65 00 Cooling Towers 03-20 23 73 00 Indoor Central-Station Air-Handling Units 03-20

23 82 00 Convection Heating and Cooling Units 03-20

23 82 16 Air Coils 03-20

DIVISION 25 – INTEGRATED AUTOMATION

Not Used.

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16 26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 01-18 26 05 73 Overcurrent Protective Device Coordination Study 01-18 26 08 00 Commissioning of Electrical Systems 11-16 26 09 23 Lighting Controls 01-18 26 22 00 Low-Voltage Transformers 01-18 26 24 16 Panelboards 01-18 26 27 26 Wiring Devices 01-18 26 29 11 Motor Controllers 01-18 26 51 00 Interior Lighting 01-18 26 55 71 Medical and Surgical Lighting Fixtures 01-18

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19 27 05 26i Grounding and Bonding for Communications Systems 12-22 27 05 33i Raceways and Boxes for Communications Systems 12-22 27 05 53i Identification of Communication Systems 12-22 27 08 00 Commissioning of Communications Systems 11-16 27 10 00i Structured Cabling 12-22 27 13 13i Communication Copper Terminations 12-22

09-01-19

00 01 10-5

TABLE OF CONTENTS

27 15 13i Communications Copper Horizontal Cabling 12-22 27 16 19i Communications Patch Cords 12-22 27 51 16 Public Address and Mass Notification Systems 10-18

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18 28 05 13 Conductors and Cables for Electronic Safety and Security 10-18 28 05 28.33 Conduits and Backboxes for Electronic Safety and Security 09-11 28 08 00 Commissioning of Electronic Safety and Security Systems 11-16 28 13 00 Physical Access Control System 10-11 28 16 00 Intrusion Detection System 10-11 28 23 00 Video Surveillance 09-11 28 31 00 Fire Detection and Alarm 10-11

DIVISION 31 – EARTHWORK

31 20 11 Earthwork (Short Form) 10-12

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 31 13 Chain Link Fences and Gates 06-18

DIVISION 33 – UTILITIES

Not Used

DIVISION 34 – TRANSPORTATION

Not Used

DIVISION 48 – Electrical Power Generation

Not Used