36C25023B0027 0004.pdf

PDF 244 KB Posted

Attached to
Z2DA--506-20-102 Upgrade Basement Building 1W (23NR9KA30)
Solicitation number
36C25023B0027
Issued by

About this file

This document contains a pre-solicitation announcement and questions and answers related to solicitation number 36C25023B0027 for upgrade work at a Veterans Administration medical center. The pre-solicitation announces the agency's intent to issue an invitation for bid on or around March 20, 2023 for interior renovation of approximately 14,000 square feet of existing basement and sub-basement spaces. The work includes mechanical, electrical and plumbing system upgrades, asbestos abatement, and improvements to space efficiency and workflow. The estimated cost is between $1,000,000 and $5,000,000. The contract type will be firm-fixed-price and award is expected within 120 days of bid opening. The acquisition is set aside for verified Service-Disabled Veteran Owned Small Businesses. The document also includes responses to contractor questions on technical specifications and drawings.

View the file

Other files

File Type Posted
Notice of Award Contract 36C25024C0025 Oct 31 - 506-20-102.pdf PDF
36C25023B0027 0007.pdf PDF
36C25023B0027 0006.pdf PDF
14.15_E602 - PANELBOARD SCHEDULES RFI 28 - 506-20-102.pdf PDF
1-AE114 - PHASE A5 NEW WORK PLAN RFI 29 - 506-20-102.pdf PDF
105126 Plastic Lockers for RFI 29 Answer - 506-20-102.pdf PDF
1-AE112 - PHASE A3 NEW WORK PLAN RFI 29 - 506-20-102.pdf PDF
123100 Metal Casework for RFI 29 Answer - 506-20-102.pdf PDF
000110 TOC for RFI 29 Answer - 506-20-102.pdf PDF
36C25023B0027 0005.pdf PDF
14.03_1-EP101 - BASEMENT POWER PLAN - NEW WORK - RFI 28 - 506-20-102.pdf PDF
S04 - Pre-Bid 2nd Site Visit Agenda - 506-20-102.pdf PDF
S04 - Pre Bid 2nd Site Visit Attendance Log - 506-20-102 signed.pdf PDF
BID SPECIFICATIONS 2023-0510 Update - 506-20-102.pdf PDF
36C25023B0027 0003.pdf PDF
Addendum 01 Section 11 41 21 - 506-20-102.pdf PDF
36C25023B0027 0002.pdf PDF
RFI No. 14 Drawing Q and A - 506-20-102.pdf PDF
Asbestos Assessment-07.2022 - 506-20-102.pdf PDF
Addendum 01 Section 11 73 00 - 506-20-102.pdf PDF
Addendum 01 Section 01 00 00 - 506-20-102.pdf PDF
S04 - Pre-Bid Walk Through Attendance Sheet signed - 506-20-102.pdf PDF
36C25023B0027 0001 - 506-20-102.pdf PDF
S04 - Pre-Bid Site Visit Agenda signed - 506-20-102.pdf PDF
RFI Form - 506-20-102.pdf PDF
EMR Certification Form - 506-20-102.pdf PDF
Brand Name Only Justification Security Cameras - 506-20-102.pdf PDF
Brand Name Only Justification Fire Alarm System - 506-20-102.pdf PDF
Brand Name Only Justification Nuclear Storage Flooring - 506-20-102.pdf PDF
Drawings - 506-20-102.pdf PDF
Brand Name Only Justification Building Controls - 506-20-102.pdf PDF
36C25023B0027 Apr 6 - 506-20-102.pdf PDF
SPECIFICATIONS 2023-0405 - 506-20-102.pdf PDF
Wage Determination MI20230101 Feb 24 - 506-20-102.pdf PDF
36C25023B0027.docx DOCX document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25023B0027 – 0004 – 506-20-102 – Upgrade Basement Building 1W – Ann Arbor, MI VAMC

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 4

0004 05-12-2023

506-20-102

36C250

Department of Veterans Affairs

Network Contracting Office (NCO) 10

5500 Armstrong Rd., Bldg. 9 Rm. 105

Battle Creek MI 49037

36C250

Department of Veterans Affairs

Network Contracting Office (NCO) 10

24 Frank Lloyd Wright Dr. Lobby M2200

Ann Arbor MI 48105

To all Offerors/Bidders

36C25023B0027

05-12-2023

X

X X

X 1

The purpose of this Amendment is:

1. To provide responses to the Request for Information (RFIs).

2. To provide a Bid Specifications update.

3. To provide the 2nd Pre-Bid Site Visit Attendance Log and Agenda.

End of Amendment 0004

SCOTT D. BRENNAN

Contract Specialist

NCO1115LE--09620962

Question 17: Are the medical procedures and testing for required certifications done at VA facilities at the Government’s expense or are they to be born by the contractor? If this is to be paid by the contractor, how much should the contractor or individual anticipate?

Answer 17: There is currently no requirement for medical surveillance of contractor’s employees at this facility for infectious diseases.

Question 18: Drawing PD101, Is the water shown on this page underground ~250 LF or hung please

Answer 18: The water piping shown to be removed on sheet 1-PD101 is hung. As a rule, all the piping with the prefix “UG” is underground and piping without that prefix is hung.

Question 19: We note that there are two slightly different copies of Section 01 00 00 – General

Requirements and two slightly different copies of Section 01 32 16.15 in the Specification

Manual or Project Manual. Which one applies?

Answer 19: See Attachment for revised Specifications

Question 20: We note that no general class of Infection Control is stated for this project in

Section 01 35 26. Normally there is a general class stated with exceptions. What class should be considered for this project?

Answer 20: Please reference Specification Section 01 35 26, the end of Paragraph 1.12 B.

which states “The primary project scope area for this project is: Class III”.

Question 21: The points listed on drawing M703 for the fluid cooler, FC-1 , calls for an emergency shutdown BI point. What initiates this emergency shutdown and where is it located?

Answer 21: The point is provided as a placeholder for safeties provided with system equipment. This point may be omitted during construction if no such points exist.

Question 22: Drawing M702 shows a building differential pressure AI point with reference to the outside and one to the building interior. Please provide the location for the interior reference point within the building.

Answer 22: Please locate the interior reference point on the outside wall of the Mechanical

Room A1002 (i.e., in the electrical workshop space SPA 1001) directly south of the 1-AHU-2.

Question 23: Drawing 1-M104 shows the location of the new DOAS-1 unit in the 4th floor mechanical space. A new DDC panel will be provided by Siemens to control this unit. Please provide the location of the nearest IT closet so that this new DDC panel can be added to the VAs building network.

Answer 23: The nearest IT closet is Room A437 on the 4th Floor of Building 1W. This room is not labeled on the Drawings, but its outline is shown on Sheet 10M104, at the cross section of column line M and column line 6.

Question 24: Drawing M701 detail 2 for DOAS-1 shows a supply air static pressure transmitter, SPS. What room should the supply static pressure transmitter be referenced to?

Answer 24: Suggest Viewing FG100A (below where the SPS is shown) unless the controls contractor recommends otherwise.

Question 25: The sequence of operation for the processed chilled water system om drawing M703 under the heading of pump speed calls for the pump speed to be controlled via a pressure differential sensor. The piping diagram for this system does not show this device.

Please provide this device's location.

Answer 25: Please install in the mains at Canteen Retail BB07.

Question 26: The points list on drawing M703 for the process chilled water system calls for an emergency shutdown BI point. What initiates this emergency shutdown and where is it located?

Answer 26: The point is provided as a placeholder for safeties provided with system equipment.

This point may be omitted during construction if no such points exist.

Question 27: please confirm whether items 20, 38, and 39 on page AE111 are by the VA or part of the millwork scope.

Answer 27: Item 20 – It’s shown as Contractor Furnished and Installed (CC) on the drawings.

Item 38 and 39 – Per General Note D, all items not specifically called out as VA furnished or VA installed is in the scope of the contractor to provide.

ATTACHMENTS:

See attached document: BID SPECIFICATIONS 2023-0510 Update - 506-20-102.

See attached document: S04 - Pre Bid 2nd Site Visit Attendance Log - 506-20-102 signed.

See attached document: S04 - Pre-Bid 2nd Site Visit Agenda - 506-20-102.

File details come from the government source that posted it. Updated .