I
E
D
C1
3 5 6 9 102 4 7 8 11
F
G
J
K
11a
ISOLATION
BAY
ANTE ROOM
STORAGE
MEDICATION
720B
PUMP ROOM
& ABG
720B
MEDICATION
723A
HYBRID OR
723A
728A
NEUROSURGERY
OR 9
728A
720A
CARDIAC OR
720A723C
HYBRID
STORAGE
723C
NEURO
EQUIP
P-12
ELEVATOR
P-12
STORAGE
SOILED
UTILITY
STORAGE
POST-OP
AREA
STORAGE
TOILET
705706
CLEAN
SUPPLY
IMAGE
EQUIP
COMPONENT
ROOM
SCRUB
723B
CONTROL
ROOM
723B
HAC
ALC-7-1
ALCOVE
ALC-7-1
GAS
STORAGE
TOILET
CLEAN
SUPPLY
720C
EQUIPMENT
STORAGE
720C
IT CLOSET
TOILET
SOILED
UTILITY
RECOVERY
702A
OR
COUNTER
702A
CONSULT
701C
TOILET
701C
701B
TOILET
701B
P-8
ELEVATOR
P-8
7F100
EXIST.
TELECOM
7F100
P-9
ELEVATOR
P-9
SCRUB
COR-7-10
CORRIDOR
COR-7-10
STORAGE
COR-7-12
CORRIDOR
COR-7-12
COR-7-3
CORRIDOR
COR-7-3
COR-7-4
CORRIDOR
COR-7-4
701A
SURGICAL
WAITING
701A
STAIR 10
GAS
CYLINDERS
BIOMED
COMMUNICATION
COR-7-9
CORRIDOR
COR-7-9
COR-7-8
CORRIDOR
COR-7-8
COR-7-2
CORRIDOR
COR-7-2
COR-7-1
ELEVATOR
LOBBY
COR-7-1
P-7
ELEVATOR
P-7 P-10
ELEVATOR
P-10
COR-7-7
CORRIDOR
COR-7-7
711K
RECOVERY
BAY
711K
711J
RECOVERY
BAY
711J
711L
RECOVERY
BAY
711L
711H
RECOVERY
BAY
711H 711G
RECOVERY
BAY
711G 711F
RECOVERY
BAY
711F
711E
RECOVERY
BAY
711E
711D
RECOVERY
BAY
711D
711C
RECOVERY
BAY
711C
711B
RECOVERY
BAY
711B
704H
PATIENT
BAY
704H
704G
PATIENT
BAY
704G
704J
PATIENT
BAY
704J
704A
PATIENT
BAY
704A
704B
PATIENT
BAY
704B
704C
PATIENT
BAY
704C
704D
PATIENT
BAY
704D
704E
PATIENT
BAY
704E704F
PATIENT
BAY
704F
711A
RECOVERY
BAY
711A
702B
DOC.
STORAGE
702B
7F-113
EXISTING
CLEAN
CORE
7F-113
HAC
732 7F-116
EXIST. ELEC
CLOSET
7F-116
7F-116a
EXIST. ELEC
CLOSET
7F-116a
COR-7-6
CORRIDOR
COR-7-6
COR-7-5
CORRIDOR
COR-7-5
STAIR 8
HAZARD CLASSIFICATION LEGEND
LIGHT HAZARD
(0.10 GPM/FT² OVER 1,500 FT² WITH
100 GPM EXTERIOR HOSE DEMAND)
ORDINARY HAZARD 1
(0.15 GPM/FT² OVER 1,500 FT² WITH
250 GPM EXTERIOR HOSE DEMAND)
OUT OF SCOPE AREA
N
RECOVERY &
SURGICAL WAITING
7TH FLOOR KEY PLAN
PHASE-TWO
POST- OP
OPERATING ROOMS
1. DESIGN BUILD TEAM AND A/E OF RECORD MUST FOLLOW ALL CURRENT VA NATIONAL
TIL STANDARDS, INCLUDING VA NATIONAL CAD STANDARDS, THROUGHOUT DESIGN
AND CONSTRUCTION.
2. THE DESIGN AND INSTALLATION OF THE FIRE PROTECTION, FIRE SUPPRESSION
SYSTEM MUST BE IN ACCORDANCE WITH U.S. DEPARTMENT OF VETERANS AFFAIRS
FIRE PROTECTION DESIGN MANUAL, SEVENTH EDITION, DECEMBER 2015; NFPA 13:
STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2019 EDITION; AND
NFPA 14: STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOSE SYSTEMS,
2019 EDITION.
3. THIS INFORMATION HAS BEEN PREPARED TO PROVIDE GUIDANCE FOR BIDDING. THE
CONTRACTOR SHALL BE THE ENGINEER OF RECORD. THE FIRE PROTECTION
CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR PROVIDING A COMPLETE AND
FULLY OPERABLE SYSTEM WHICH SHALL BE IN STRICT ACCORDANCE WITH PROJECT
SPECIFICATIONS AND APPLICABLE CODES AND STANDARDS. THE WORK THAT IS
INDICATED IN THIS DOCUMENT IS AN OVERVIEW OF THE PROJECT, INTENDED TO
ESTABLISH THE MINIMUM SCOPE REQUIREMENTS FOR THE PROJECT AS WELL AS
THE CONTRACTOR’S RESPONSIBILITIES. THE CONTRACTOR SHALL SUBMIT A
COMPLETE SET OF WORKING DRAWINGS, EQUIPMENT, AND CALCULATIONS TO THE
OWNER’S REPRESENTATIVE AND AHJ FOR REVIEW AND APPROVAL PRIOR TO
FABRICATION AND INSTALLATION WITH THEIR ENGINEERS SEAL.
4. PRIOR TO BEGINNING ANY CONSTRUCTION, THE CONTRACTOR SHALL BE
RESPONSIBLE FOR VERIFICATION OF ALL DIMENSIONS, MEASUREMENTS AND
LOCATIONS OF EXISTING FACILITIES, UTILITIES, EQUIPMENT AND OTHER EXISTING
CONDITIONS WHICH MAY AFFECT CONSTRUCTION. BASE CIVIL ENGINEERING HAS
MADE EVERY ATTEMPT TO VERIFY THIS INFORMATION. HOWEVER, IN THE EVENT OF
DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL FIELD CONDITIONS,
CONTACT THE CONTRACTING OFFICER IMMEDIATELY.
5. SPRINKLER CONTRACTOR SHALL COORDINATE LOCATIONS OF FIRE PROTECTION
COMPONENTS INCLUDING PIPING, ALARMS, DRAINS, SPRINKLERS, TEST POINTS,
ETC., WITH ALL ARCHITECTURAL, STRUCTURAL, MECHANICAL, AND ELECTRICAL
COMPONENTS. OBSTRUCTIONS TO SPRINKLER DISCHARGE SHALL BE CONSIDERED
DURING INSTALLATION. DO NOT INSTALL SPRINKLER PIPING BELOW EQUIPMENT OR
WITHIN CLEARANCE SPACES FOR MECHANICAL AND ELECTRICAL EQUIPMENT.
SPRINKLERS SHALL BE INSTALLED UNDER OBSTRUCTIONS IN ACCORDANCE WITH
NFPA 13.
6. THE SPRINKLER SYSTEM MUST BE ZONED BY SMOKE COMPARTMENT.
7. MATERIALS AND ACCESSORIES NECESSARY MUST BE INSTALLED IN ACCORDANCE
WITH THE APPLICABLE NFPA CODES AND STANDARDS, PROJECT SPECIFICATIONS,
AND BE UL LISTED OR FM APPROVED FOR FIRE PROTECTION USE, UNLESS
OTHERWISE NOTED.
8. ALL VALVES INSIDE TO BE PROVIDED WITH ELECTRONIC TAMPER SWITCHES WIRED
TO THE FACU. VALVES IN NORMAL CLOSED POSITION SHALL BE PROVIDED WITH
TAMPER TO ACTIVATE IN THREE TURNS OR LESS. ALL VALVES OUTSIDE TO BE
SUPERVISED WITH LOCK AND CHAIN.
9. ALL HANGERS MUST BE PROVIDED AND INSTALLED IN ACCORDANCE WITH NFPA 13
AND PROJECT SPECIFICATIONS.
10. LOCATION AND INSTALLATION OF PIPE SUPPORTS (HANGERS, VERTICAL
RESTRAINTS, AND GUIDES) SHALL MEET THE REQUIREMENTS OF NFPA 13 AND THE
SPECIAL LISTING REQUIREMENTS (IF APPLICABLE) OF THE PIPE AND SUPPORTS.
11. THE INSPECTOR'S TEST VALVES MUST BE LOCATED NO MORE THAN 7 FEET AFF.
12. APPLICABLE UL CONSTRUCTION DETAILS AND SYSTEMS SHALL BE USED WHERE
FIRE RATED BARRIERS ARE PENETRATED BY SPRINKLER PIPING.
13. ALL VALVES (DRAINS, INSPECTOR'S TEST, CONTROL) MUST BE IDENTIFIED AS
REQUIRED BY NFPA 13.
14. PIPING MUST BE ARRANGED FOR FLUSHING. READILY REMOVABLE FITTINGS MUST
BE PROVIDED AT THE END OF ALL CROSS MAINS.
15. ALL PENDENT SPRINKLERS MUST BE INSTALLED IN THE CENTER OF THE CEILING
TILES.
16. DRAINS MUST BE LOCATED TO PROVIDE DRAINAGE IN ACCORDANCE WITH NFPA 13.
ALL DRAINS AND TEST CONNECTIONS MUST DISCHARGE TO THE EXTERIOR OF THE
BUILDING ON TO A SPLASH BLOCK OR PAVEMENT, AND SHALL NOT DISCHARGE
ACROSS PATHS OF EGRESS.
17. ALL SPRINKLER SYSTEM ALARM INITIATING AND SUPERVISORY DEVICES MUST BE
CONNECTED TO THE FIRE ALARM SYSTEM.
18. ADDITIONAL SPRINKLERS MAY BE REQUIRED UNDER DUCT WORK TO PROVIDE
ADEQUATE COVERAGE PER NFPA 13.
19. A LISTED RELIEF VALVE MUST BE PROVIDED IN ACCORDANCE WITH NFPA 13,
SECTION 8.1.2 FOR THE SPRINKLER SYSTEM.
20. AN AIR VENT MUST BE PROVIDED IN ACCORDANCE WITH NFPA 13, SECTION 8.1.5 AND
SECTION 16.7 FOR THE SPRINKLER SYSTEM.
21. THIS BUILDING WILL HAVE A WET PIPE AUTOMATIC SPRINKLER SYSTEM WHICH WILL
REQUIRE ALL AREAS OF THE BUILDING TO BE MAINTAINED ABOVE 40 DEGREES F.
22. PROVIDE SPRINKLER PROTECTION WITHIN ALL COMBUSTIBLE CONCEALED SPACES.
23. INSTALL NEW CHECK VALVES, WATERFLOW SWITCHES, AND INSPECTOR'S TEST
CONNECTIONS WITH PRESSURE RELIEF VALVE.
24. CONTRACTOR TO INSTALL A CHECK VALVE, FLOW SWITCH, TAMPER SWITCH,
INSPECTORS TEST, AND DRAIN FOR EACH SMOKE COMPARTMENT ASSEMBLY. REFER
TO ARCHITECTURAL LIFE SAFETY PLAN FOR LOCATION OF SMOKE COMPARTMENTS.
25. CONTRACTOR TO PREFORM FIRE PUMP TEST TO VERIFY ADEQUACY OF EXISTING
WATER SUPPLY FOR THE SCOPE OF WORK AREA. TESTING TO BE IN ACCORDANCE
WITH NFPA 20.
26. SEISMIC DESIGN CATEGORY C, CONTRACTOR TO PROVIDE SEISMIC BRACING IN
ACCORDANCE WITH NFPA 13. REFER TO STRUCTURAL DRAWINGS FOR ANY
ADDITIONAL INFORMATION.
FIRE SUPPRESSION GENERAL NOTES
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing #
VA Office Of Construction & Facilities Management Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
OK ARCH REG. NO. CA02295, EXP. 06/30/2023
OK ENGR REG. NO. CA7127, EXP. 06/30/2021
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
STRUCTURAL ENGINEER
H2B, INC.
1225 N. LOOP WEST, SUITE 800
HOUSTON, TX 77008
(713) 864-2900
MECH / ELEC / PLUMB / TECH ENGINEER
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
HEALTHCARE PLANNER
OCULUS INC.
1 S. MEMORIAL DR., SUITE 1500
ST. LOUIS, MO 63102
(314) 367-6100
SPUR PROJECT NUMBER: 1791.08
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(913) 369-7200
SEE FRONT COVER SHEET
FOR APPROVAL SIGNATURE
/2
/2
:1 :3
A
M
FX101
FIRE SUPPRESSION HAZARD
CLASSIFICATION SEVENTH FLOOR PLAN
DRF
35 OF 92AWP
100% RFP DOCUMENTS
CONSTRUCT SURGICAL INTENSIVE
CARE UNIT & RENOVATE
OPERATING ROOMS
08/02/2021
635-436
OKLAHOMA CITY VA HEALTHCARE SYSTEM
921 NE 13TH ST, OKLAHOMA CITY, OK 73104
N
1/8" = 1'-0"
FIRE SUPPRESSION HAZARD CLASSIFICATION SEVENTH FLOOR PLAN
SHEET KEYNOTES
MARK KEYNOTE
1 CONNECT NEW SPRINKLER PIPING TO EXISTING
SPRINKLER SUPPLY PIPING
2 PROVIDE SPRINKLER PROTECTION FOR ELEVATOR
HOISTWAY IN ACCORDANCE WITH NFPA 13, SECTION
9.3.6.1.
No. REVISION DESCRIPTION DATE
CONSULTANTS:
STRUCTURAL ENGINEER
H2B, INC.
1225 N. LOOP WEST, SUITE 800
HOUSTON, TX 77008
(713) 864-2900
MECH / ELEC / PLUMB / TECH ENGINEER
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
HEALTHCARE PLANNER
OCULUS INC.
1 S. MEMORIAL DR., SUITE 1500
ST. LOUIS, MO 63102
(314) 367-6100
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(913) 369-7200
VERTICAL TRANSPORTATION
ENVIRONMENTAL HYGIENIST
TEC-AN, INC.
2517 S. PURDUE AVE.
OKLAHOMA CITY, OK 73128
(405) 681-7076
LERCH BATES
2001 BRYAN ST., SUITE 1930
DALLAS, TX 75201
(972) 294-5221
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
File details come from the government source that posted it. Updated .