18_AF711 - ROOM FINISH SCHEDULES and FINISH LEGEND.pdf
PDF 363 KB Posted
- Solicitation number
- 36C10F22R0036
View the file
Other files
Show 40 more
Latest 50 of 122 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. ALL WALLS TO BE PAINTED P2, UNO.
2. ALL UPPER CABINETS TO HAVE 30° SLOPED TOP WHERE NOT RECEIVED BY CEILING ABOVE.
3. ALL RUBBER BASE TO BE RB1 UNO.
4. ALL STAIR LANDINGS TO RECEIVE RUBBER FLOOR TILE (RF1), UNO. ALL STAIR TREADS TO BE
(RF2), UNO.
5. ALL OUTSIDE CORNERS TO RECIEVE CORNER GUARDS. ALL GUARDS AT 90 DEGREE CORNERS
TO BE CG1 UNO, ALL GUARDS AT 135 DEGREE CORNERS TO BE CG2 UNO.
6. ELEVATOR WALL, CEILING AND BASE FINISHES TO BE CHOSEN FROM MANUFACTURERS LINE OF
STANDARD FINISHES.
7. REFEREENCE ROLLER SHADE (R1 & R2) FOR WINDOW TREATMENT BASIS OF DESIGN.
8. ALL OUTSIDE EDGES OF PORCELAIN WALL TILE TO RECEIVE METAL TRANSITION STRIP (TR1).
9. FLOOR TRANSITIONS BETWEEN PORCELAIN TILE AND OTHER FLOORING TYPES TO RECEICVE
METAL TRANSITION STRIP (TR2). CONTRACTOR TO VERIFY SIZE OF TRANSITION STRIP
REQUIRED TO PROVIDE ADA COMPLIANT TRANSITION IN FLOORING HEIGHT.
10. UNEVEN FLOOR TRANSITIONS BETWEEN RESILIENT FLOORING TYPES TO RECEIVE BUBBER
TRANSITION STRIP (TR3). CONTRACTOR TO VERIFY SIZE OF TRANSITION STRIP REQUIRED TO
PROVIDE ADA COMPLIANT TRANSITION IN FLOORING HEIGHT.
11. ASBESTOS OR ASBESTOS CONTAINING PRODUCTS ARE NOT ALLOWED IN ANY ASPECT OF THIS
CONSTRUCTION.
12. COORDINATE ALL DISCIPLINES AND ALL ASPECTS OF WORK. CONFLICTS AND DISCREPENCIES
SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT IMMEDIATELY.
13. ALL CONCRETE SURFACES WHICH RECEIVE A SPECIAL FINISH, FLOOR COVERING, COATINGS, HARDENERS, ETC. SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SPECIFIC FINISH
MANUFACTURER'S SPECIFICATIONS AND INSTRUCTIONS. PRIOR TO APPLICATION OF A SPECIAL FINISH, A WRITTEN ACCEPTANCE OF THE SURFACE SHALL BE SUBMITTED TO THE ARCHITECT BY
THE GENERAL CONTRACTOR.
14. REMOVE ALL FLOOR FINISHES AND ADHESIVES AND STRIP FLOOR DOWN TO EXISTING
CONCRETE. LEVEL AND PREP FLOOR FOR INSTALLATION OF NEW FLOOR FINISHES AS NOTED.
15. DESIGN BUILD TEAM AND A/E OF RECORD MUST FOLLOW ALL CURRENT VA NATIONAL TIL
STANDARDS, INCLUDING VA NATIONAL CAD STANDARDS, THROUGHOUT DESIGN AND
CONSTRUCTION
GENERAL FINISH NOTES
1. WET WALLS TO BE TILED TO CEILING, ALL OTHER TOILET ROOM WALLS TO RECEIVE TILE
WAINSCOT UP TO 60" AFF.
2. ALL SHOWER WALLS TO BE TILED TO CEILING.
3. ALL WALLS TO RECEIVE WALL PROTECTION, WP1, UP TO 48" AFF.
4. ALL WALLS TO RECIEVE WALL PROTECTION, WP2, UP TO 60" AFF.
5. INSET LUXURY VINYL TILE TO BE LAID ON 45 DEGREE ANGLE, UNO.
6. TILE BACKSPLASH, PT1, AT ALL SOLID SURFACE COUNTER TOP LOCATIONS.
7. ALL STAIR LANDINGS IN SCOPE TO RECIEVE RUBBER FLOOR TILE (RF1), ALL STAIR TREADS IN
SCOPE TO RECEIVE RUBBER STAIR TREAD (RF2).
ROOM FINISH SCHEDULE REMARKS
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing #
VA Office Of Construction & Facilities Management Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
OK ARCH REG. NO. CA02295, EXP. 06/30/2023
OK ENGR REG. NO. CA7127, EXP. 06/30/2023
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
STRUCTURAL ENGINEER
H2B, INC.
1225 N. LOOP WEST, SUITE 800
HOUSTON, TX 77008
(713) 864-2900
MECH / ELEC / PLUMB / TECH ENGINEER
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
HEALTHCARE PLANNER
OCULUS INC.
1 S. MEMORIAL DR., SUITE 1500
ST. LOUIS, MO 63102
(314) 367-6100
SPUR PROJECT NUMBER: 1791.08
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(913) 369-7200
SEE FRONT COVER SHEET
FOR APPROVAL SIGNATURE
VERTICAL TRANSPORTATION
ENVIRONMENTAL HYGIENIST
TEC-AN, INC.
2517 S. PURDUE AVE.
OKLAHOMA CITY, OK 73128
(405) 681-7076
LERCH BATES
2001 BRYAN ST., SUITE 1930
DALLAS, TX 75201
(972) 294-5221
/2
/2
:1 :3
P
M
AF711
ROOM FINISH SCHEDULES & FINISH
LEGEND
SP
18 OF 92JNK
100% RFP DOCUMENTS
CONSTRUCT SURGICAL INTENSIVE
CARE UNIT & RENOVATE
OPERATING ROOMS
08/02/2021
635-436
OKLAHOMA CITY VA HEALTHCARE SYSTEM
921 NE 13TH ST, OKLAHOMA CITY, OK 73104
FINISH LEGEND
ABBREV. MATERIAL MANUFACTURER SERIES/COLLECTION COLOR SIZE NOTES
AT1 ACOUSTIC CEILING, TILE ARMSTRONG ULTIMA HEALTH ZONE WITH PRELUDE 15/16" EXPOSED TEE GRID SYSTEM WHITE 24" X 24"
AT2 ACOUSTIC CEILING, CLEANABLE TILE ARMSTRONG ULTIMA HEALTH ZONE WITH 15/16" CO-EXTRUDED CLEAN ROOM GRID SYSTEM WHITE 24" X 24"
CG1 CORNER GUARD INPRO 150 HIGH IMPACT CORNER GUARD, 90 DEGREE CORNER 0105 SILVER 3" X 3" X 48"
CG2 CORNER GUARD INPRO 130 HIGH IMPACT CORNER GUARD, 135 DEGREE CORNER 0105 SILVER 3" X 3" X 48"
CPT1 CARPET TILE MANNINGTON GLITCH ART, CIRCUIT MODULAR DIRECT CURRENT 13406 24" X 24"
GT1 GROUT LATICRETE SPECTRALOCK PRO GROUT 60 DUSTY GREY AS RECOMMENDED BY MANUFACTURER FOR USE WITH PT1 AND PT2.
HMD1 HOLLOW METAL DOOR PAINT SHERWIN WILLIAMS PRO INDUSTRIAL, SEMIGLOSS SW7119 GAUNTLET GRAY -
HMF1 HOLLOW METAL FRAME PAINT SHERWIN WILLIAMS PRO INDUSTRIAL, SEMIGLOSS SW7119 GAUNTLET GRAY -
HMWF1 HOLLOW METAL WINDOW FRAME PAINT SHERWIN WILLIAMS PRO INDUSTRIAL, SEMIGLOSS SW7119 GAUNTLET GRAY -
HR1 HAND RAIL INPRO 1100 HANDRAIL 0107 PEWTER GRAY 3 3/4" X 5 1/2" TOP OF HANDRAIL TO BE MOUNTED AT 36" AFF. REFERENCE FINISH PLANS (SHEETS AF701 & AF702) FOR LOCATIONS.
LVT1 LUXURY VINYL TILE MANNINGTON NATURE'S PATHS, DISSOLVE RENDER 18" X 18" QUARTER TURN INSTALLATION PATTERN.
LVT2 LUXURY VINYL TILE MANNINGTON WALKWAY, ABSTRACT FORSYTH 18" X 18" QUARTER TURN INSTALLATION PATTERN.
P1 PAINT, CEILING SHERWIN WILLIAMS PROMAR 200 ZERO VOC, EGGSHELL SW7004 SNOWBOUND -
P2 PAINT, WALL SHERWIN WILLIAMS PROMAR 200 ZERO VOC, EGGSHELL SW7672 KNITTING NEEDLES -
P3 PAINT, ACCENT SHERWIN WILLIAMS PROMAR 200 ZERO VOC, EGGSHELL SW7673 PEWTER CAST -
P4 PAINT, ACCENT SHERWIN WILLIAMS PROMAR 200 ZERO VOC, EGGSHELL SW9136 LULLABY -
P5 PAINT, ACCENT SHERWIN WILLIAMS PROMAR 200 ZERO VOC, EGGSHELL SW6227 MEDITATIVE -
P6 PAINT, SPECIALTY COATING SHERWIN WILLIAMS PRO INDUSTRIAL, SEMIGLOSS SW7004 SNOWBOUND -
P7 PAINT, SPECIALTY COATING SHERWIN WILLIAMS PRO INDUSTRIAL, SEMIGLOSS SW7672 KNITTING NEEDLES -
P8 PAINT, SPECIALTY COATING SHERWIN WILLIAMS PRO INDUSTRIAL, SEMIGLOSS SW9136 LULLABY -
P9 PAINT, SPECIALTY COATING SHERWIN WILLIAMS PRO INDUSTRIAL, SEMIGLOSS SW6227 MEDITATIVE -
PLAM1 PLASTIC LAMINATE, CASEWORK FORMICA COMMERCIAL HIGH PRESSURE LAMINATE 9283 WALNUT RIFTWOOD AT CASEWORK AND MILLWORK
PT1 PORCELAIN TILE, MOSAIC METROSURFACES FOUNDATION CHARCOAL ROCK 1" X 3" STACKED MOSAIC INSTALLED WITH GT1 GROUT. USED AT TILE FLOORS SLOPED TO DRAINS AND ACCENT TILE DIRECTLY BEHIND TOILET ROOM LAVATORIES AND SHOWER ROOM SHOWER ASSEMBLIES.
PT2 PORCELAIN TILE, WALL METROSURFACES FOUNDATION SUMMIT GRAY 12" X 24" INSTALLED WITH GT1 GROUT. ASHLAR INSTALLATION PATTERN, LENGTH OF TILE TO BE RUN VERTICALLY.
RB1 RUBBER BASE TARKETT DURACOVE 4" 48 GREY WG 4"
RES1 RESINOUS FLOORING DUR-A-FLEX HYBRID-FLEX AQ Q28-23 - INTEGRAL BASE TO EXTEND UP WALL 4" WITH STAINLESS STEEL TRIM CAP.
RES2 RESINOUS FLOORING DUR-A-FLEX HYBRID-FLEX AQ Q28-24 - INTEGRAL BASE TO EXTEND UP WALL 4" WITH STAINLESS STEEL TRIM CAP.
RF1 RUBBER FLOOR TILE TARKETT ECO NATURALS, CORKTONES 48 GREY WG, HAMMERED TEXTURE 24" X 24"
RF2 RUBBER STAIR TREAD TARKETT ANGLE FIT RUBBER STAIR TREAD WITH INTEGRATED RISER 48 GREY WG, HAMMERED TEXTURE SIZED TO FIT APPLICATION
RS1 ROLLER SHADE SWF CONTRACT TRUE PERFORMANCE MANUAL SOLAR SHADES, DUAL SHADES SUMMIT 500, GRAY.WHITE C7713 SIZED TO FIT APPLICATION 4" FASCIA. FABRIC OPENNESS: BLACKOUT. POSITION: FRONT SHADE FARTHEST FROM WINDOW.
RS2 ROLLER SHADE, BLACKOUT SWF CONTRACT TRUE PERFORMANCE MANUAL SOLAR SHADES, DUAL SHADES CONCEAL, PEWTER C2619 SIZED TO FIT APPLICATION 4" FASCIA. FABRIC OPENNESS: BLACKOUT. POSITION: BACK SHADE NEAREST TO WINDOW.
SD1 STATIC DISSAPATIVE TILE TARKETT PRIMO SD MEDIUM PURE GRAY 24" X 24"
SS1 SOLID SURFACE COUNTERTOP FORMICA SOLID SURFACING, FORMICA CLASSICS LUNA SAND 1/2" THICKNESS
TR1 TRIM, METAL SCHLUTER SCHIENE BRUSHED STAINLESS STEEL SIZED TO FIT APPLICATION AT ALL OUTSIDE EDGES OF WALL TILE.
TR2 TRIM, METAL SCHLUTER RENO-U BRUSHED STAINLESS STEEL SIZED TO FIT APPLICATION AT PORCELAIN TILE AND RESINOUS FLOORING TRANSITIONS AS REQUIRED.
TR3 TRIM, RUBBER TARKETT FINISHING ACCESSORIES, TRANSITIONS 48 GREY WG SIZED TO FIT APPLICATION AT RESILIENT AND CARPET TILE FLOORING TRANSITIONS AS REQUIRED.
WD1 WOOD DOOR PANEL MASONITE ASPIRO HIGH IMPACT SIENNA WALNUT -
WG1 WALL GUARD INPRO 1300 WALL GUARD 0107 PEWTER GRAY 2" X 4" TOP OF WALL GUARD MOUTED AT 18" AFF.
WP1 WALL PROTECTION INPRO PALLADIUM RIGID SHEET WALL PROTECTION 0105 SILVER 48" X 96" UP TO 48" AFF.
WP2 WALL PROTECTION INPRO STAINLESS STEEL WALL PANEL STAINLESS STEEL, SATIN 48" X 120" AT SURGICAL SCRUB AREAS
WSF1 WELDED SHEET FLOORING TARKETT IQ GRANIT, MICRO GRANIT, ROLL 21050 352 PEBBLEBROOK WG 78" X 984" INTEGRAL BASE TO EXTEND UP WALL 4" WITH TRIM CAP. WELDING ROD GREY.
WSF2 WELDED SHEET FLOORING TARKETT IQ GRANIT, MICRO GRANIT, ROLL 21050 350 SYLAR CG 78" X 984" INTEGRAL BASE TO EXTEND UP WALL 4" WITH TRIM CAP. WELDING ROD GREY.
ROOM FINISH SCHEDULE - SEVENTH FLOOR
ROOM # ROOM NAME
FLOOR FINISHES WALL FINISHES
CEILING REMARK
MATERIAL BASE NORTH EAST SOUTH WEST
7F100 EXIST. TELECOM SD1 RB1 P1 P1 P1 P1 NO CEILING
7F-113 EXISTING CLEAN CORE RES1 RES1 P2, WP1 P2, WP1 P2, WP1 P2, WP1 P6 ON GYP 3
7F-116 EXIST. ELEC CLOSET SD1 RB1 P1 P1 P1 P1 NO CEILING
7F-116a EXIST. ELEC CLOSET SD1 RB1 P1 P1 P1 P1 NO CEILING
700 STAIR 8 RF1, RF2 RB1 P2 P2 P2 P2 P1 ON GYP 7.
701A SURGICAL WAITING LVT1 RB1 P2, P5 P2 P2 P2 AT1 5.
701B TOILET PT1 - P8, PT2 P8, PT2 P8, PT2 PT1, PT2 AT1 1.
701C TOILET PT1 - P8, PT2 P8, PT2 P8, PT2 PT1, PT2 AT1 1.
701D REFRESHMENT CENTER LVT1 RB1 P2 P2 P2 P2, PT1 AT1
702A OR COUNTER LVT2 RB1 - P4 P4 P4 AT2
702B DOC. STORAGE WSF1 WSF1 P7, WP1 P7, WP1 P7, WP1 P7, WP1 AT2
703 CONSULT LVT1 RB1 P2 P2 P2 P5 AT1, P1 ON GYP
704 POST-OP AREA WSF1, WSF2 WSF1 P7 P7 P7 P7 AT2, P6 ON GYP
704A PATIENT BAY WSF1, WSF2 WSF1 P7 P7 P7 P7 AT2
704B PATIENT BAY WSF1, WSF2 WSF1 P7 P7 P7 - AT2
704C PATIENT BAY WSF1, WSF2 WSF1 P7 P7 P7 - AT2
704D PATIENT BAY WSF1, WSF2 WSF1 P7 P7 P7 P7 AT2
704E PATIENT BAY WSF1, WSF2 WSF1 P7 P7 P7 P7 AT2
704F PATIENT BAY WSF1, WSF2 WSF1 P7 P7 P7 P7 AT2
704G PATIENT BAY WSF1, WSF2 WSF1 P7 P7 P7 P7 AT2
704H PATIENT BAY WSF1, WSF2 WSF1 P7 - P7 P7 AT2
704J PATIENT BAY WSF1, WSF2 WSF1 P7 P7 P7 P7 AT2
705 TOILET PT1 - P8, PT2 PT2 P8, PT2 PT1, PT2 AT1 1.
706 CLEAN SUPPLY WSF1 WSF1 P7, WP1 P7, WP1 P7, WP1 P7, PT1 AT2 3.
707 SOILED UTILITY WSF1 WSF1 P7, WP1 P7, WP1 P7, WP1 P7, WP1 AT2 3.
708 MEDICATION WSF1 WSF1 P7 P7 P7, PT1 P7 AT2
709 STORAGE WSF1 WSF1 P7, WP1 P7, WP1 P7, WP1 P7, WP1 AT1 3.
710 STORAGE WSF1 WSF1 P7, WP1 P7, WP1 P7, WP1 P7, WP1 AT1 3.
711 RECOVERY WSF1, WSF2 WSF1 P7 P7 P7 P7 AT2, P6 ON GYP
711A RECOVERY BAY WSF2 WSF2 P7 P7 - - AT2
711B RECOVERY BAY WSF2 WSF2 - P7 - - AT2
711C RECOVERY BAY WSF2 WSF2 - P7 - - AT2
711D RECOVERY BAY WSF2 WSF2 - P7 - - AT2
711E RECOVERY BAY WSF2 WSF2 - P7 - - AT2
711F RECOVERY BAY WSF2 WSF2 - P7 P7 - AT2
711G RECOVERY BAY WSF2 WSF2 - - P7 - AT2
711H RECOVERY BAY WSF2 WSF2 - - P7 P7 AT2
711J RECOVERY BAY WSF2 WSF2 - - - P7 AT2
711K RECOVERY BAY WSF2 WSF2 - - - P7 AT2
711L RECOVERY BAY WSF2 WSF2 P7 - - P7 AT2
711M NURSE STATION
712 MEDICATION WSF2 WSF2 P7, PT1 P7 P7 P7 AT1
713 ISOLATION BAY WSF1, WSF2 WSF1 P7 P7 P7 P7 P6 ON GYP
714 TOILET PT1 - PT2 P8, PT2 P8, PT1, PT2 P8, PT2 AT1 1.
715 ANTE ROOM WSF1 WSF1 P7 P7, PT1 P7 P7 P6 ON GYP
716 SOILED UTILITY WSF1 WSF1 P7 P7 P7 P7 AT2
717 STORAGE WSF1 WSF1 P7, WP1 P7, WP1 P7, WP1 P7, WP1 AT1 3.
718 IT CLOSET SD1 RB1 P1 P1 P1 P1 NO CEILING
719 BIOMED COMMUNICATION SD1 RB1 P1 P1 P1 P1 NO CEILING
720A CARDIAC OR 3 RES1, RES 2 RES1 P7 P7 P7 P7 P6 ON GYP
720B PUMP ROOM & ABG RES1 RES1 P7, WP1 P7, WP1 P7, WP1 P7, WP1 P6 ON GYP 3.
720C EQUIPMENT STORAGE RES1 RES1 P7, WP1 P7, WP1 P7, WP1 P7, WP1 P6 ON GYP 3.
721 CLEAN SUPPLY WSF1 WSF1 P7, WP1 P7, WP1 P7, WP1 P7, WP1 AT2 3.
722 SCRUB RES1 RES1 P7, WP2 P7, WP2 - P7, WP2 AT2 4.
723A HYBRID OR 10 RES1, RES 2 RES1 P7 P7 P7 P7 P6 ON GYP
723B CONTROL ROOM RES1 RES1 P7 P7 P7 P7 P6 ON GYP
723C HYBRID STORAGE RES1 RES1 P7, WP1 P7, WP1 P7, WP1 P7, WP1 P6 ON GYP 3.
724 HAC WSF1 WSF1 P7, WP1 P7, WP1 P7, WP1 P7, WP1 AT2 3.
725 TOILET PT1 - P8, PT2 P8, PT2 PT1, PT2 P8, PT2 AT1 1.
726 GAS STORAGE WSF1 WSF1 P7, WP1 P7, WP1 P7, WP1 P7, WP1 AT1 3.
727 STORAGE WSF1 WSF1 P7, WP1 P7, WP1 P7, WP1 P7, WP1 AT1 3.
728 IMAGE EQUIP COMPONENT ROOM WSF1 WSF1 P7 P7 P7 P7 AT1
728A NEUROSURGERY OR 9 RES1, RES 2 RES1 P7 P7 P7 P7 P6 ON GYP
729 GAS CYLINDERS WSF1 WSF1 P7, WP1 P7, WP1 P7, WP1 P7, WP1 AT1 3.
730 SCRUB RES1 RES1 - P7, WP2 P7, WP2 P7, WP2 AT2 4.
731 NEURO EQUIP RES1 RES1 P7, WP1 P7, WP1 P7, WP1 P7, WP1 P6 ON GYP 3.
732 STORAGE WSF1 WSF1 P7, WP1 P7, WP1 P7, WP1 P7, WP1 AT2 3.
732 HAC WSF1 WSF1 P7, WP1 P7, WP1 P7, WP1 P7, WP1 AT2 3.
733 STAIR 10 RF1, RF2 RB1 P2 P2 P2 P2 P1 ON GYP 7.
ALC-7-1 ALCOVE RES1 RES1 P3, WP1 - P3, WP1 P3, WP1 AT2 3.
COR-7-1 ELEVATOR LOBBY LVT1 RB1 P2 P2 P2 P2 AT1, P1 ON GYP 5.
COR-7-2 CORRIDOR LVT1 RB1 P2, WP1 P2, WP1 P2, WP1 P2, WP1 AT1, P1 ON GYP 3.
COR-7-3 CORRIDOR RES1 RES1 P2, WP1 P2, WP1 P2, WP1 P2, WP1 AT2 3.
COR-7-4 CORRIDOR RES1 RES1 P2, WP1 P2, WP1 P2, WP1 P2, WP1 AT2 3.
COR-7-5 CORRIDOR RES1 RES1 P2, WP1 P2, WP1 P2, WP1 P2, WP1 AT2 3.
COR-7-6 CORRIDOR RES1 RES1 P2, WP1 P2, WP1 P2, WP1 P2, WP1 AT2 3.
COR-7-7 CORRIDOR RES1 RES1 P2, WP1 P2, WP1 P2, WP1 P2, WP1 P1 ON GYP
COR-7-8 CORRIDOR RES1 RES1 P2, WP1 P2, WP1 P2, WP1 P2, WP1 AT2 3.
COR-7-9 CORRIDOR RES1 RES1 P4, WP1 P2, WP1 P2, WP1 P2, WP1 AT2 3.
COR-7-10 CORRIDOR RES1 RES1 P2, WP1 P2, WP1 P2, WP1 P2, WP1 AT2 3.
COR-7-12 CORRIDOR RES1 RES1 P2, WP1 P2, WP1 P2, WP1 P2, WP1 AT2 3.
TYPICAL SHOWER TILE
TYPICAL TOILET ROOM TILE
FLOOR DRAIN, REFERENCE PLUMBING
DRAWINGS FOR LOCATIONS.
SLOPE TO DRAIN NOT TO EXCEED 1:48.
P4
PT2
PT2
PT1
PT2
TR1
PT2PT2
T
IL
E W
A
IN
S C
O T
0"
A F
F
ROOM FINISH SCHEDULE - EIGHTH FLOOR
ROOM # ROOM NAME
FLOOR FINISHES WALL FINISHES
CEILING REMARK
MATERIAL BASE NORTH EAST SOUTH WEST
800 STAIR 8 RF1, RF2 RB1 P2 P2 P2 P2 P1 ON GYP 7.
801A SICU PATIENT ROOM (ACC.) WSF1, WSF2 WSF1 P7 P7 P9 P7 AT2, P6 ON GYP 3.
801B ICU TOILET PT1 - PT2 P8, PT2 PT1, PT2 P8, PT2 P6 ON GYP 1.
802A ANTE ROOM WSF1 WSF1 P7 P7, PT1 P7 P7 P6 ON GYP 3.
802B SICU PATIENT ISOLATION ROOM (ACC.) WSF1, WSF2 WSF1 P7 P9 P7 P7 P1 ON GYP 3.
802C ICU TOILET PT1 - P8, PT2 P8, PT2 PT2 PT1, PT2 P6 ON GYP 1.
803A SICU PATIENT ROOM (ACC.) WSF1, WSF2 WSF1 P7 P7 P7 P9 AT2, P6 ON GYP 3.
803B ICU TOILET PT1 - PT2 P8, PT2 PT1, PT2 P8, PT2 P6 ON GYP 1.
804A SICU PATIENT ROOM WSF1, WSF2 WSF1 P7 P7 P7 P9 AT2, P6 ON GYP 3.
804B ICU TOILET PT1 - PT1, PT2 P8, PT2 P8, PT2 P8, PT2 P6 ON GYP 1.
805A SICU PATIENT ROOM WSF1, WSF2 WSF1 P7 P7 P7 P9 AT2, P6 ON GYP 3.
805B ICU TOILET PT1 - PT1, PT2 P8, PT2 P8, PT2 P8, PT2 P6 ON GYP 1.
806A SICU PATIENT ROOM WSF1, WSF2 WSF1 P7 P9 P7 P7 AT2, P6 ON GYP 3.
806B ICU TOILET PT1 - PT1, PT2 P8, PT2 P8, PT2 P8, PT2 P6 ON GYP 1.
807A SICU PATIENT ROOM WSF1, WSF2 WSF1 P7 P7 P9 P7 AT2, P6 ON GYP 3.
807B ICU TOILET PT1 - PT1, PT2 P8, PT2 P8, PT2 P8, PT2 P6 ON GYP 1.
808A SICU PATIENT ROOM WSF1, WSF2 WSF1 P7 P7 P7 P9 AT2, P6 ON GYP 3.
808B ICU TOILET PT1 - PT1, PT2 P8, PT2 P8, PT2 P8, PT2 P6 ON GYP 1.
809A SICU PATIENT ROOM WSF1, WSF2 WSF1 P7 P9 P7 P7 AT2, P6 ON GYP 3.
809B ICU TOILET PT1 - PT1, PT2 P8, PT2 P8, PT2 P8, PT2 P6 ON GYP 1.
810A SICU PATIENT ROOM WSF1, WSF2 WSF1 P7 P9 P7 P7 AT2, P6 ON GYP 3.
810B ICU TOILET PT1 - PT1, PT2 P8, PT2 P8, PT2 P8, PT2 P6 ON GYP 1.
811A ANTE ROOM WSF1 WSF1 P7 P7 P7 P7, PT1 P6 ON GYP 3.
811B SICU PATIENT ISOLATION ROOM (ACC.) WSF1, WSF2 WSF1 P9 P7 P7 P7 P1 ON GYP 3.
811C ICU TOILET PT1 - P8, PT2 P2 P8, PT2 PT1, PT2 P6 ON GYP 1.
813 TEAM WORK CPT1 RB1 P2 P3 P2 P2 AT1
814 SINGLE OFFICE CPT1 RB1 P2 P3 P2 P2 AT1
815 SHARED OFFICE CPT1 RB1 P2 P3 P2 P2 AT1
816 STAFF BREAK LVT2 RB1 P4 P4 P4, PT1 P4 AT1 6.
817 STAFF TOILET PT1 - P8, PT2 P8, PT2 PT1, PT2 P8, PT2 P6 ON GYP 1.
818 ON-CALL TOILET/SHOWER PT1 - PT1, PT2 PT1, PT2 P8, PT2 P8, PT2 P6 ON GYP 1., 2.
819 ON-CALL CPT1 RB1 P3 P3 P3 P3, P5 AT1
820A SICU PATIENT ROOM WSF1, WSF2 WSF1 P7 P9 P7 P7 AT2, P6 ON GYP 3.
820B ICU TOILET PT1 - P8, PT2 P8, PT2 PT1, PT2 P8, PT2 P1 ON GYP 1.
821A SICU PATIENT ROOM WSF1, WSF2 WSF1 P7 P7 P7 P9 AT2, P6 ON GYP 3.
821B ICU TOILET PT1 - P8, PT2 P8, PT2 PT1, PT2 P8, PT2 P6 ON GYP 1.
822A SICU PATIENT ROOM WSF1, WSF2 WSF1 P7 P9 P7 P7 AT2, P6 ON GYP 3.
822B ICU TOILET PT1 - P8, PT2 P8, PT2 PT1, PT2 P8, PT2 P6 ON GYP 1.
823A ANTE ROOM WSF1 WSF1 P7 P7, PT1 P7 P7 P6 ON GYP 3.
823B SICU PATIENT ISOLATION ROOM (ACC.) WSF1, WSF2 WSF1 P7 P7 P7 P9 P6 ON GYP 3.
823C ICU TOILET PT1 - P8, PT2 PT1, PT2 P8, PT2 P8, PT2 P6 ON GYP 1.
824A ANTE ROOM WSF1 WSF1 P7 P7 P7 P7, PT1 P6 ON GYP 3.
824B SICU PATIENT ISOLATION ROOM (ACC.) WSF1, WSF2 WSF1 P7 P9 P7 P7 P6 ON GYP 3.
824C ICU TOILET PT1 - P8, PT2 P8, PT2 P8, PT2 PT1, PT2 P6 ON GYP 1.
825A SICU PATIENT WSF1, WSF2 WSF1 P7 P7 P7 P9 AT2, P6 ON GYP 3.
825B ICU TOILET PT1 - P8, PT2 PT2 P8, PT2 PT1, PT2 P6 ON GYP 1.
826 COMM SD1 RB1 P1 P1 P1 P1 NO CEILING
827 COMM SD1 RB1 P1 P1 P1 P1 NO CEILING
828 SICU WAITING SD1 RB1 P5 P3 P3 P3 AT1, P1 ON GYP
829 TOILET PT1 - P8, PT2 PT2 P8, PT2 PT1, PT2 P6 ON GYP 1.
830 TOILET PT1 - P8, PT2 PT1, PT2 P8, PT2 PT2 P6 ON GYP 1.
831 NURSE STATION LVT2 RB1 P3 - P3 P3, PT1 P1 ON GYP 6.
832 CLEAN SUPPLY / LINEN WSF1 WSF1 P7, WP1 P7, WP1 P7, WP1 P7, WP1 AT2 3.
833 ELEC SD1 RB1 P1 P1 P1 P1 NO CEILING
834 COMM SD1 RB1 P1 P1 P1 P1 NO CEILING
835 CLEAN UTILITY WSF1 WSF1 P7, WP1 P7, WP1 P7, WP1 P7, WP1 AT2 3.
836 SOILED UTILITY WSF1 WSF1 P7, PT2, WP1 P7, WP1 P7, WP1 P7, WP1 AT2 3.
837 MEDS LVT2 RB1 P2, PT1 P2 P2 P2 AT1 6.
838 NOURISH. LVT2 RB1 P2 P2 P2, PT1 P2 AT1 6.
839 NURSE STATION/ TEAM COLLAB. LVT2 RB1 P3 P3, PT1 P3 P3 P1 ON GYP 6.
840 EQUIP. STORAGE LVT2 RB1 P7, WP1 P7, WP1 P7, WP1 P7, WP1 AT1 3.
841 HAC WSF1 WSF1 P7, WP1 P7, WP1 P7, WP1 P7, WP1 AT2 3.
842 MED GAS LVT2 RB1 P7, WP1 P7, WP1 P7, WP1 P7, WP1 AT1 3.
843 STAIR 10 RF1, RF2 RB1 P2 P2 P2 P2 P1 ON GYP 7.
ALC-8-1 ALCOVE LVT1 RB1 P3, WP1 P3, WP1 - P3, WP1 P1 ON GYP 3.
ALC-8-2 ALCOVE, ICE LVT1 RB1 P3, PT1 P3 - P3 P1 ON GYP 6.
ALC-8-3 ALCOVE LVT2 RB1 P3, WP1 P3, WP1 P3, WP1 - P1 ON GYP 3.
ALC-8-4 ALCOVE LVT2 RB1 P3, WP1 P3, WP1 P3, WP1 - P1 ON GYP 3.
ALC-8-5 ALCOVE LVT1 RB1 - P3, WP1 P3, WP1 P3, WP1 P1 ON GYP 3.
ALC-8-6 ALCOVE LVT2 RB1 P3 P3 P3 - P1 ON GYP
ALC-8-7 ALCOVE LVT2 RB1 - P3 P3 P3 P1 ON GYP
ALC-8-8 ALCOVE LVT2 RB1 P3 P3 - P3 P1 ON GYP
COR-8-1 ELEVATOR LOBBY LVT1 RB1 P2 P2 P2 P2 AT1, P1 ON GYP 5.
COR-8-2 CORRIDOR LVT1 RB1 P2, WP1 P2, WP1 P2, WP1 P2, WP1 AT1, P1 ON GYP
COR-8-3 CORRIDOR LVT1 RB1 P2, WP1 P2, WP1 P2, WP1 P2, WP1 AT1, P1 ON GYP 3., 5.
COR-8-4 CORRIDOR LVT1 RB1 P2, WP1 P2, WP1 P2, WP1 - AT1, P1 ON GYP 3., 5.
COR-8-5 CORRIDOR LVT1 RB1 P2, WP1 P2, WP1 P2, WP1 P2, WP1 AT1, P1 ON GYP 3., 5.
COR-8-6 CORRIDOR LVT2 RB1 - P3, WP1 - P3, WP1 AT1 3.
COR-8-7 ELEVATOR LOBBY LVT1 RB1 - P2, WP1 P2, WP1 P2, WP1 P1 ON GYP 3., 5.
COR-8-8 CORRIDOR LVT1 RB1 P2, WP1 P2, WP1 P2, WP1 P2, WP1 AT1, P1 ON GYP 3., 5.
COR-8-9 CORRIDOR LVT1 RB1 P2, WP1 P2, WP1 P2, WP1 P2, WP1 AT1, P1 ON GYP 3., 5.
COR-8-10 CORRIDOR LVT1 RB1 P2, WP1 P2, WP1 P2, WP1 P2, WP1 AT1, P1 ON GYP 3., 5.
PT1
No. REVISION DESCRIPTION DATE
PT1
FLOOR DRAIN, REFERENCE PLUMBING
DRAWINGS FOR LOCATIONS.
SLOPE TO DRAIN NOT TO EXCEED 1:48.
PT1
ACCENT STRIP CENTERED BEHIND
LAVATORY, 24" WIDE
ACCENT STRIP CENTERED BEHIND
SHOWER, 24" WIDE
File details come from the government source that posted it. Updated .