This is a Plan & Profile sheet for wastewater infrastructure design at Death Valley National Park. The drawing depicts the Cow Creek Wastewater Main LS Force Main project, specifically showing an 8-inch High-Density Polyethylene (HDPE) DR 11 sewer force main installation with a combination air/vacuum valve located at station CS 394+51.61. The plan view illustrates the force main alignment relative to existing ground features, the Death Valley Scenic Byway (SR-190), edge of pavement, and disturbance limits. Two potential disturbance areas are identified for 40-foot by 20-foot by 6-foot horizontal directional drilling (HDD) bore pits. An existing fiber optic line is noted with a requirement to protect it in place.

The profile view displays the approximate existing ground surface elevation and the force main pipeline profile across stations CS 390+00 through CS 395+00, with elevation data ranging from approximately -199.95 to -210.90 feet. The combination air/vacuum valve is positioned with 4.60 feet of cover above the force main, which exceeds the minimum required 3.00-foot cover depth. The drawing references additional sheets (C5.65, DC3.12, and CC7.1) for supplementary construction and environmental details. This document is sheet 2 of 13 within package 178069, drawing number 318717-C5.64, dated January 17, 2025, and was designed by T. Francis with technical review by M. Whelehon.

View the file

Other files

File Type Posted
B09_Amd11_-_B08_Attach3_-_WD_CA20260020_Mod2_0011.pdf PDF
Sol_140P2025R0082_Amd_0011.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_42_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_38_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_40_Jan2026_0010.pdf PDF
B09_Amd10_QR_Tracker_-_DEVA_318717_Final_0010.xlsx XLSX spreadsheet
B09_Amd10_-_QR55_Attach_Drawing_01-C4_39_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_00-C8_27_Jan2026_0010.pdf PDF
B09_Amd10_-_QR86_Attach_Drawing_C1_40_0010.pdf PDF
B09_Amd10_-_Drawing_G1_22_0010.pdf PDF
B09_Amd10_-_QR86_Attach_Drawing_C1_40B_0010.pdf PDF
Sol_140P2025R0082_Amd_0010.pdf PDF
B09_Amd10_-_B08_Attach4_-_DetailedContractPriceSchedule_0010.xlsx XLSX spreadsheet
B09_Amd10_-_Drawing_G1_2_0010.pdf PDF
B09_Amd10_-_Drawing_Coversheet_00_DEVA_318717_Jan2026x_0010.pdf PDF
B09_Amd10_-_Drawing_G1_21_0010.pdf PDF
Sol_140P2025R0082_Amd_0009.pdf PDF
B09_Amd8_-_Drawing_02-C5_29_Jan2026_0008.pdf PDF
B09_Amd8_-_Spec_33_14_19_-_VALVES___HYDRANTS_FOR_WATER_UTILITY_SERVICE_0008.pdf PDF
B09_Amd8_-_Drawing_02-G1_16_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_08_33_22_-_ALUMINUM_ROLLING_OVERHEAD_DOORS_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_29_Jan2026_0008.pdf PDF
B09_Amd8_-_QR22_Attach_Drawing_00-C7_1_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C5_25_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_00-C8_30_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_01-C4_42_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_01-C3_1_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_20_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_32_00_-_WASTEWATER_PUMPING_STATIONS_0008.pdf PDF
B09_Amd8_-_Spec_33_31_11_-_GRAVITY_SEWER_PIPELINE___MANHOLE_INSTALLATION_0008.pdf PDF
B09_Amd8_QR_Tracker_-_DEVA_318717_0008.xlsx XLSX spreadsheet
B09_Amd8_-_Drawing_Coversheet_00_DEVA_318717_Jan2026_0008.pdf PDF
Sol_140P2025R0082_Amd_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_31_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C6_7_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_15_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-G1_2_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C7_5_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_11_13_-_POTABLE_WATER_SUPPLY_WELLS_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_18_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_02-C5_33_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_42_Jan2026_0008.pdf PDF
B09_Amd8_-_QR56_Attach_Drawing_02-C2_20_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_31_05_-_MANHOLE_LINING___REHABILITATION_0008.pdf PDF
B09_Amd8_-_Drawing_01-G1_15_Jan2026_0008.pdf PDF
B09_Amd8_-_QR56_Attach_Drawing_02-C2_18_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_67_Jan2026_0008.pdf PDF
B09_Amd8_-_Spec_46_33_11_-_CHEMICAL_FEED_-_LIQUID_SYSTEMS_0008.pdf PDF
B09_Amd8_-_Drawing_02-C2_22_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-X1_2_Jan2026_0008.pdf PDF
Show 40 more

Latest 50 of 109 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FM

FM

FMFM

FMFMFMFM

FM CS 390+00 CS 391+00 CS 392+00 CS 393+00 CS 394+00

C S 395+00

AR

V

COMBINATION

AIR/VACUUM VALVE

STA: CS 394+51.61

-209 -209

-203

-204

-198

-202

-198

-240

-230

-220

-210

-200

-190

-180

-170

-240

-230

-220

-210

-200

-190

-180

-170

CS 390+00

-2

.0

-2

.0

-2

.8

-2

.6

-2

.4

-2

.3

-2

.2

-2

.8

-2

.8

-2

.3

CS 391+00

-2

.4

-2

.8

-2

.0

-2

.3

-2

.5

-2

.9

-2

.2

-2

.4

-2

.7

-2

.9

CS 392+00

-2

.2

-2

.4

-2

.8

-2

.9

-2

.5

-2

.5

-2

.6

-2

.0

-2

.3

-2

.5

CS 393+00

-2

.7

-2

.0

-2

.0

-2

.5

-2

.1

-2

.1

-2

.1

-2

.6

-2

.3

-2

.1

CS 394+00

-2

.7

-2

.6

-2

.2

-2

.2

-2

.8

-2

.7

-2

.3

-2

.8

-2

.2

-2

.9

CS 395+00

-1

.9

-2

.0

8" HDPE DR 11 SEWER FORCE MAIN

APPROXIMATE EXISTING

GROUND SURFACE C

O M

BI

N

AT

IO

N

AI

R /V

AC

U

U M

V

AL

VE

ST

A:

C

S

4+

.6

ES(B)

FM

ARV

20 0 20 40

SCALE OF FEET

10 0 10 20

HORIZ.

VERT.

1/5 /26

:05

K

EL

LY

.K

ER

O F

:\7

4.0 5 D

EV

A

W

AT

ER

A

ND

W

AS

TE

W

AT

ER

S

YS

TE

M

RE

HA

B\

DR

AW

IN

GS

\D W

G\

CI

VI

L\5

S

HE

ET

P

RO

DU

CT

IO

N\ 4_

DE

VA

C C

W W

_C C

MA

IN

LS

F

M_

RE

V

PLAN

PROFILE

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

COW CREEK WASTEWATER

PLAN & PROFILE

MAIN LS FORCE MAIN

178069

285 513

T. FRANCIS

T. FRANCIS

M. WHELEHON

1.17.2025

DEATH VALLEY

NATIONAL PARK

318717 02-

C5.64

KEY MAP

NTS

KEY MAP

NTS

DEATH VALLEY SCENIC

BYWAY, CA SR-190

EDGE OF PAVEMENT

DISTURBANCE

LIMIT 50'

4.60' COVER

(MIN. COVER = 3.00')

SEE SHEET C5.65SE

E

SH

EE

T C

5.

D C3.12

POTENTIAL DISTURBANCE

AREA. LOCATION FOR

40'X20'X6' HDD BORE PIT

POTENTIAL DISTURBANCE

AREA. LOCATION FOR

40'X20'X6' HDD BORE PIT

EXISTING FIBER OPTIC LINE,

PROTECT IN PLACE

C C7.1

Kelly.Kero Cloud

Kelly.Kero Cloud

Kelly.Kero Polygon

Kelly.Kero Polygon

Kelly.Kero Text Box

Kelly.Kero Text Box

Kelly.Kero Text Box

COMBINATION AIR RELEASE VALVE

Kelly.Kero Text Box

COMBINATION AIR RELEASE VALVE

Sheets and Views
Sheet - (324)

File details come from the government source that posted it. Updated .