B09_Amd8_-_Drawing_00-C8_30_Dec2025_0008.pdf

PDF 161 KB Posted

Attached to
DEVA 318717 - Rehab Furnace & Cow Creeks WTP/WWTP
Solicitation number
140P2025R0082
Issued by

About this file

This is a technical drawing document for vault toilet details at Death Valley National Park, prepared as part of a Water and Wastewater System Rehabilitation project. The drawing, dated January 17, 2025, provides comprehensive specifications for the installation and construction of a vault toilet facility.

The vault toilet design features specific dimensional requirements including an 11'-6" vault height, 14'-7½" building length, 6'-6" width, and a 60-inch diameter turning circle for accessibility. The facility incorporates a two-piece vent system at specified heights to manage odors, with a building-to-vault connection sealed using butyl tape adhesive sealant. The design includes dimension callouts of 4'-3", 4'-4", 5", 8'-6", and 15'-2¾", indicating precise construction parameters. The critical specification mandates that the vault toilet be manufactured with sufficient ventilation to minimize odors in accordance with Sweet Smelling Technology (SST) design standards. The drawing provides both elevation and plan views showing the toilet building structure, vault chamber, vent placement, and spatial relationships within the site layout. The technical drawings are produced under project reference PMIS/PKG No. 318717, Drawing No. 178069, Sheet C8.30.

View the file

Other files

File Type Posted
B09_Amd11_-_B08_Attach3_-_WD_CA20260020_Mod2_0011.pdf PDF
Sol_140P2025R0082_Amd_0011.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_42_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_38_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_40_Jan2026_0010.pdf PDF
B09_Amd10_QR_Tracker_-_DEVA_318717_Final_0010.xlsx XLSX spreadsheet
B09_Amd10_-_QR55_Attach_Drawing_01-C4_39_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_00-C8_27_Jan2026_0010.pdf PDF
B09_Amd10_-_QR86_Attach_Drawing_C1_40_0010.pdf PDF
B09_Amd10_-_Drawing_G1_22_0010.pdf PDF
B09_Amd10_-_QR86_Attach_Drawing_C1_40B_0010.pdf PDF
Sol_140P2025R0082_Amd_0010.pdf PDF
B09_Amd10_-_B08_Attach4_-_DetailedContractPriceSchedule_0010.xlsx XLSX spreadsheet
B09_Amd10_-_Drawing_G1_2_0010.pdf PDF
B09_Amd10_-_Drawing_Coversheet_00_DEVA_318717_Jan2026x_0010.pdf PDF
B09_Amd10_-_Drawing_G1_21_0010.pdf PDF
Sol_140P2025R0082_Amd_0009.pdf PDF
B09_Amd8_-_Drawing_02-C5_29_Jan2026_0008.pdf PDF
B09_Amd8_-_Spec_33_14_19_-_VALVES___HYDRANTS_FOR_WATER_UTILITY_SERVICE_0008.pdf PDF
B09_Amd8_-_Drawing_02-G1_16_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_08_33_22_-_ALUMINUM_ROLLING_OVERHEAD_DOORS_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_29_Jan2026_0008.pdf PDF
B09_Amd8_-_QR22_Attach_Drawing_00-C7_1_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C5_25_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_01-C4_42_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_01-C3_1_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_20_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_32_00_-_WASTEWATER_PUMPING_STATIONS_0008.pdf PDF
B09_Amd8_-_Spec_33_31_11_-_GRAVITY_SEWER_PIPELINE___MANHOLE_INSTALLATION_0008.pdf PDF
B09_Amd8_QR_Tracker_-_DEVA_318717_0008.xlsx XLSX spreadsheet
B09_Amd8_-_Drawing_Coversheet_00_DEVA_318717_Jan2026_0008.pdf PDF
Sol_140P2025R0082_Amd_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_31_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C6_7_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_15_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-G1_2_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C7_5_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_11_13_-_POTABLE_WATER_SUPPLY_WELLS_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_18_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_02-C5_33_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_42_Jan2026_0008.pdf PDF
B09_Amd8_-_QR56_Attach_Drawing_02-C2_20_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_31_05_-_MANHOLE_LINING___REHABILITATION_0008.pdf PDF
B09_Amd8_-_Drawing_01-G1_15_Jan2026_0008.pdf PDF
B09_Amd8_-_QR56_Attach_Drawing_02-C2_18_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_67_Jan2026_0008.pdf PDF
B09_Amd8_-_Spec_46_33_11_-_CHEMICAL_FEED_-_LIQUID_SYSTEMS_0008.pdf PDF
B09_Amd8_-_Drawing_02-C2_22_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-X1_2_Jan2026_0008.pdf PDF
B09_Amd8_-_QR22_Attach_Drawing_02-C5_64_Jan2026_0008.pdf PDF
Show 40 more

Latest 50 of 109 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

VAULT TOILET

DETAILS

178069

351 513

E. ANDERSON

E. ANDERSON

M. WHELEHON

1.17.2025

DEATH VALLEY

NATIONAL PARK

318717

C8.30 R

O O

F

LI

N E

AB

O

VE

/4/

:38 K

EL

LY

.K

ER

O F :\7

4.0

5 D

EV

A W

AT

ER

A

ND

W

AS

TE

W

AT

ER

S

YS

TE

M

RE

HA

B\

DR

AW

IN

GS

\D

W G\

CI

VI

L\5 S

HE

ET

P

RO

DU

CT

IO

N\

3_

DE

VA

F

C W

_E

RO

SI

ON

C

ON

TR

OL

G

RA

DI

NG

.D W

G

NTS

A

C8.30

VAULT TOILET

14' - 7 12"

5" 4'

4"

6' - 6"

VAULT

BUILDING-TO-VAULT CONNECTION:

BUTYL TAPE ADHESIVE SEALANT

1 2"

14' - 7 12"

15 - 2 34"

8'

6"

6'

6" 60" DIA TURNING CIRCLE

4' - 3"

VAULT

TWO PIECE

VENT HEIGHT

TWO PIECE

VENT HEIGHT

NOTES:

1. VAULT TOILET IS TO BE MANUFACTURED INCLUDING

SUFFICIENT VENTILIATION TO MINIMIZE ODORS IN

ACCORDANCE WITH SWEET SMELLING TECHNOLOGY

(SST) DESIGN.

Sheets and Views
Vault Toilet Detail

File details come from the government source that posted it. Updated .