This is a technical drawing sheet for wastewater infrastructure detailing the lift station section for the Deva Water and Wastewater System Rehabilitation project at Death Valley National Park. The drawing (Sheet C7.5, Drawing No. 318717) provides elevation views of the lift station wet well and overflow tank configuration, specifying critical design parameters and equipment requirements.

The lift station design requires an Everlast 4000 Series Duplex pump station equipped with Smith & Loveless 4B2D*1 pumps or approved equal, capable of handling 250 gallons per minute at 83 feet of total dynamic head with 15 horsepower, 480-volt, 3-phase motors. The pump must pass solids up to 3 inches in diameter with a 9.125-inch impeller trim. The system incorporates a 6-foot diameter, 13-foot deep precast lift station wet well with a 15,000-gallon precast overflow tank, both requiring compacted backfill per specification section 31 23 33. Critical operational elevations include lead pump on at -184.70, lag pump on at -183.20, pumps off at -187.20, high level alarm at -179.23, and low level alarm/redundant off at -188.20. All internal plumbing for the wet well and valve vault must be epoxy-coated stainless steel, with link-seals installed at all concrete penetrations. The maximum suction lift is specified at 20 feet, and the volume between lead pump on and pumps off must equal or exceed the pumping rate per minute. Additional details reference architectural sheets, plan views, and specification section 33 32 00 for complete equipment requirements.

View the file

Other files

File Type Posted
B09_Amd11_-_B08_Attach3_-_WD_CA20260020_Mod2_0011.pdf PDF
Sol_140P2025R0082_Amd_0011.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_42_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_38_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_40_Jan2026_0010.pdf PDF
B09_Amd10_QR_Tracker_-_DEVA_318717_Final_0010.xlsx XLSX spreadsheet
B09_Amd10_-_QR55_Attach_Drawing_01-C4_39_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_00-C8_27_Jan2026_0010.pdf PDF
B09_Amd10_-_QR86_Attach_Drawing_C1_40_0010.pdf PDF
B09_Amd10_-_Drawing_G1_22_0010.pdf PDF
B09_Amd10_-_QR86_Attach_Drawing_C1_40B_0010.pdf PDF
Sol_140P2025R0082_Amd_0010.pdf PDF
B09_Amd10_-_B08_Attach4_-_DetailedContractPriceSchedule_0010.xlsx XLSX spreadsheet
B09_Amd10_-_Drawing_G1_2_0010.pdf PDF
B09_Amd10_-_Drawing_Coversheet_00_DEVA_318717_Jan2026x_0010.pdf PDF
B09_Amd10_-_Drawing_G1_21_0010.pdf PDF
Sol_140P2025R0082_Amd_0009.pdf PDF
B09_Amd8_-_Drawing_02-C5_29_Jan2026_0008.pdf PDF
B09_Amd8_-_Spec_33_14_19_-_VALVES___HYDRANTS_FOR_WATER_UTILITY_SERVICE_0008.pdf PDF
B09_Amd8_-_Drawing_02-G1_16_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_08_33_22_-_ALUMINUM_ROLLING_OVERHEAD_DOORS_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_29_Jan2026_0008.pdf PDF
B09_Amd8_-_QR22_Attach_Drawing_00-C7_1_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C5_25_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_00-C8_30_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_01-C4_42_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_01-C3_1_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_20_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_32_00_-_WASTEWATER_PUMPING_STATIONS_0008.pdf PDF
B09_Amd8_-_Spec_33_31_11_-_GRAVITY_SEWER_PIPELINE___MANHOLE_INSTALLATION_0008.pdf PDF
B09_Amd8_QR_Tracker_-_DEVA_318717_0008.xlsx XLSX spreadsheet
B09_Amd8_-_Drawing_Coversheet_00_DEVA_318717_Jan2026_0008.pdf PDF
Sol_140P2025R0082_Amd_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_31_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C6_7_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_15_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-G1_2_Jan2026_0008.pdf PDF
B09_Amd8_-_Spec_33_11_13_-_POTABLE_WATER_SUPPLY_WELLS_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_18_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_02-C5_33_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_42_Jan2026_0008.pdf PDF
B09_Amd8_-_QR56_Attach_Drawing_02-C2_20_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_31_05_-_MANHOLE_LINING___REHABILITATION_0008.pdf PDF
B09_Amd8_-_Drawing_01-G1_15_Jan2026_0008.pdf PDF
B09_Amd8_-_QR56_Attach_Drawing_02-C2_18_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_67_Jan2026_0008.pdf PDF
B09_Amd8_-_Spec_46_33_11_-_CHEMICAL_FEED_-_LIQUID_SYSTEMS_0008.pdf PDF
B09_Amd8_-_Drawing_02-C2_22_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-X1_2_Jan2026_0008.pdf PDF
B09_Amd8_-_QR22_Attach_Drawing_02-C5_64_Jan2026_0008.pdf PDF
Show 40 more

Latest 50 of 109 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

/16

/25

:39 K

EL

LY

.K

ER

O F :\7

4.0

5 D

EV

A W

AT

ER

A

ND

W

AS

TE

W

AT

ER

S

YS

TE

M

RE

HA

B\

DR

AW

IN

GS

\D

W G\

CI

VI

L\5 S

HE

ET

P

RO

DU

CT

IO

N\

6_

DE

VA

W

_W W

D

ET

AI

LS

W W

.D W

G

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

178069

318717

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

WASTEWATER DETAILS

LIFT STATION SECTION

178069

311 513

V. NEARY

V. NEARY

C. WEAVER

1.17.2025

DEATH VALLEY

NATIONAL PARK

318717 02-

C7.5

8" SDR 35 PVC INLET

FROM SSMH-CC-101

INVERT ELEV. = -181.67

DISCHARGE

8" HDPE FORCEMAIN

INVERT ELEV. = -182.76

PUMP SUCTION OPENING,

6" INCREASING ELBOW

SLOPE CONCRETE TO

PUMP SUCTION

4" GATE VALVE FOR DRAINING

OVERFLOW TANK INTO WET WELL

15,000-GALLON PRECAST

OVERFLOW TANK

30" DIA. ACCESS RISER

FOR OVERFLOW TANK,

TYP.

6' Ø - 13' DEEP PRECAST

LIFT STATION WET WELL

PROPOSED BUILDING SLAB

PROPOSED BUILDING

FOOTER

WET WELL

ACCESS HATCH

LIFT STATION PUMPS

PUMP MOTORS

LIFT STATION PUMP

CONTROL ROOM

PROPOSED LIFT STATION BUILDING

SEE ARCHITECTURAL SHEETS

FLAPPER VALVE FOR

OVERFLOW LINE

6" SCH 40 PVC WET

WELL OVERFLOW LINE

2% SLOPE MIN.

NTS

A

C7.5

LIFT STATION WET WELL AND OVERFLOW TANK ELEVATION VIEW

FOOTNOTES:

PUMP STATION TO BE EVERLAST 4000 SERIES DUPLEX WITH SMITH & LOVELESS

4B2D*1 PUMPS OR APPROVED EQUAL

· PUMP DESIGN CONDITION: 250 GPM @ 83FT TDH

· PUMP MUST BE CAPABLE OF PASSING SOLIDS 3" IN DIAMETER.

· PUMP MOTOR IS 15 HP - 480V 3-PHASE

· IMPELLER TRIM OF 9.125"

ALL INTERNAL PLUMBING FOR WET WELL AND VALVE VAULT TO BE EPOXY COATED

STAINLESS STEEL.

NOTES:

1. SEE SHEETS C5.6, C8.21 AND C8.22 FOR PLAN VIEW, AND GENERAL ARRANGEMENT

OF STATION. PROFILE VIEW DOES NOT REFLECT ACTUAL OVERFLOW TANK AND WET

WELL ARRANGEMENT.

2. LINK-SEALS ARE TO BE INSTALLED AT ALL PENETRATIONS IN CONCRETE FOR PIPE

AND CONDUIT.

3. VOLUME BETWEEN LEAD PUMP ON AND PUMPS OFF SHOULD BE EQUAL TO, OR

GREATER THAN, THE PUMPING RATE PER MINUTE.

4. MAXIMUM SUCTION LIFT IS 20FT

5. SEE SPECIFICATION SECTION 33 32 00 FOR EQUIPMENT REQUIREMENTS.

6. BACKFILL AROUND WET WELL AND OVERFLOW TANK SHALL BE PER SPECIFICATION

SECTION 31 23 33.

4" SCH 40 PVC DRAIN FROM VALVE

VAULT WITH FLAPPER VALVE

2% SLOPE MIN.

PUMPS OFF ELEV. = -187.20

HIGH LEVEL ALARM ELEV. = -179.23

LOW LEVEL ALARM / REDUNDANT OFF

ELEV. = -188.20

6" EPOXY COATED STAINLESS

STEEL SUCTION PIPING

FLOAT WEIGHT TYP.

LEAD PUMP ON ELEV. = -184.70

6" LINK SEAL, TYP

4" LINK SEAL, TYP

8" LINK SEAL

INVERT ELEV. = -178.73

INVERT ELEV. = -187.66

FINISHED FLOOR

ELEV. = -176.70

WET WELL FLOOR

ELEV. = -189.70

CHECK VALVE

AND PLUG VALVE

ASSMEBLY

STAINLESS STEEL FLOAT BRACKET

LAG PUMP ON ELEV. = -183.20

INVERT ELEV. = -179.61

INVERT ELEV. = -186.78

COMPACTED BASE MATERIAL

SEE NOTE 6