B09_Amd10_-_QR86_Attach_Drawing_C1_40_0010.pdf

PDF 291 KB Posted

Attached to
DEVA 318717 - Rehab Furnace & Cow Creeks WTP/WWTP
Solicitation number
140P2025R0082
Issued by

About this file

This is a technical design drawing for water infrastructure construction at Death Valley National Park. The document presents plan and profile views for the Furnace Creek Water system's south alignment, specifically Sheet C1.40 of the project documentation dated January 17, 2025. The drawing illustrates an 8-inch HDPE water main installation spanning approximately 500 linear feet, with two distinct pipe designations: DR 11 and DR 17 materials used in different sections of the alignment.

The project involves multiple construction methodologies including 484.20 feet of open trench excavation and 15.80 feet of horizontal directional drilling (HDD) to avoid conflicts with existing infrastructure. Key features depicted include gate valves, HDPE tees, water meters, and a transition point between pipe types at Station FW 228+84.55. The design accounts for two existing fiber optic cable crossings that require separation and protection, with minimum 2.50-foot cover specified over the water main. A 40-foot by 20-foot by 6-foot HDD bore pit is shown on the plan, and an existing 3-foot by 3-foot gabion basket must be protected in place. The drawing references related sheets C1.40B and C1.41, with horizontal and vertical scale references provided for construction implementation. The project documentation includes design verification by L. Graef with technical review by M. Whelehon.

View the file

Other files

File Type Posted
B09_Amd11_-_B08_Attach3_-_WD_CA20260020_Mod2_0011.pdf PDF
Sol_140P2025R0082_Amd_0011.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_42_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_38_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_40_Jan2026_0010.pdf PDF
B09_Amd10_QR_Tracker_-_DEVA_318717_Final_0010.xlsx XLSX spreadsheet
B09_Amd10_-_QR55_Attach_Drawing_01-C4_39_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_00-C8_27_Jan2026_0010.pdf PDF
B09_Amd10_-_Drawing_G1_22_0010.pdf PDF
B09_Amd10_-_QR86_Attach_Drawing_C1_40B_0010.pdf PDF
Sol_140P2025R0082_Amd_0010.pdf PDF
B09_Amd10_-_B08_Attach4_-_DetailedContractPriceSchedule_0010.xlsx XLSX spreadsheet
B09_Amd10_-_Drawing_G1_2_0010.pdf PDF
B09_Amd10_-_Drawing_Coversheet_00_DEVA_318717_Jan2026x_0010.pdf PDF
B09_Amd10_-_Drawing_G1_21_0010.pdf PDF
Sol_140P2025R0082_Amd_0009.pdf PDF
B09_Amd8_-_Drawing_02-C5_29_Jan2026_0008.pdf PDF
B09_Amd8_-_Spec_33_14_19_-_VALVES___HYDRANTS_FOR_WATER_UTILITY_SERVICE_0008.pdf PDF
B09_Amd8_-_Drawing_02-G1_16_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_08_33_22_-_ALUMINUM_ROLLING_OVERHEAD_DOORS_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_29_Jan2026_0008.pdf PDF
B09_Amd8_-_QR22_Attach_Drawing_00-C7_1_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C5_25_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_00-C8_30_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_01-C4_42_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_01-C3_1_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_20_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_32_00_-_WASTEWATER_PUMPING_STATIONS_0008.pdf PDF
B09_Amd8_-_Spec_33_31_11_-_GRAVITY_SEWER_PIPELINE___MANHOLE_INSTALLATION_0008.pdf PDF
B09_Amd8_QR_Tracker_-_DEVA_318717_0008.xlsx XLSX spreadsheet
B09_Amd8_-_Drawing_Coversheet_00_DEVA_318717_Jan2026_0008.pdf PDF
Sol_140P2025R0082_Amd_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_31_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C6_7_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_15_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-G1_2_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C7_5_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_11_13_-_POTABLE_WATER_SUPPLY_WELLS_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_18_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_02-C5_33_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_42_Jan2026_0008.pdf PDF
B09_Amd8_-_QR56_Attach_Drawing_02-C2_20_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_31_05_-_MANHOLE_LINING___REHABILITATION_0008.pdf PDF
B09_Amd8_-_Drawing_01-G1_15_Jan2026_0008.pdf PDF
B09_Amd8_-_QR56_Attach_Drawing_02-C2_18_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_67_Jan2026_0008.pdf PDF
B09_Amd8_-_Spec_46_33_11_-_CHEMICAL_FEED_-_LIQUID_SYSTEMS_0008.pdf PDF
B09_Amd8_-_Drawing_02-C2_22_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-X1_2_Jan2026_0008.pdf PDF
B09_Amd8_-_QR22_Attach_Drawing_02-C5_64_Jan2026_0008.pdf PDF
Show 40 more

Latest 50 of 109 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D) FO(D) FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

L=656.20' R=624.75 D=60°10'50"

6 7 8 9

=60°07'31"

APPROXIMATE START LOCATION FOR HDD

STA:FW 229+84.20

W 8''

W 8''

W 8''

W 8''

W 8'' W 8'' W 8''

W 8''

W 8''

W 8''

W 8''

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D) FO(D) FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

W M

W

W

GV GV

G V

FW 225+00

FW 226+00

FW 227+00 FW 228+00

FW 229+00

FW 230+00

EXISTING FIBER

OPTIC CROSSING

STA: FW 229+44.93

EXISTING FIBER

OPTIC CROSSING

STA: FW 227+96.29

END CURVE:

N 2053527.69 E 7193224.02

DR11 TO DR17

TRANSITION

STA: FW 228+84.55

8'' GATE VALVE

STA:FW 227+46.78

8'' HDPE TEE

STA:FW 227+50.01

8'' GATE VALVE

STA:FW 227+53.96

-20

-10

-20

-10

FW 225+00

-1 1.

-1 0.

-5 .2

-9

.8

-4 .8

-9

.3

-3 .9

-8

.7

FW 226+00

-3 .2

-7

.7

-2 .1

-6

.4

-0 .9

-5

.1

0.

-3 .8

1.

-2 .5

FW 227+00

1.

-1 .2

2.

95 0.

4.

1.

5.

2.

6.

3.

FW 228+00

7.

3.

8.

4.

8.

4.

8.

4.

9.

5.

FW 229+00

9.

5.

9.

6.

.1

6.

.4

6.

.9

7.

FW 230+00

.5

7.

HORIZONTAL

DIRECTIONAL

DRILLING 15.80'

OPEN TRENCH EXCAVATION 484.20'

ST

A:

F W

+9 6.

T.

O .P

. E

LE

V:

5.

EX

IS

TI

N

G F

IB

ER

O

PT

IC

C

R O

SS

IN

G

ST

A:

F W

+4 4.

T.

O .P

. E

LE

V:

8.

EX

IS

TI

N

G F

IB

ER

O

PT

IC

C

R O

SS

IN

G

ST

A:

F W

+8 4.

T.

O .P

. E

LE

V:

5.

D R

T

O D

R

TR

AN

SI

TI

O N

ST

A:

FW

+4

6.

T.

O

.P . E

LE

V:

1.

8" G

AT

E

VA

LV

E

ST

A:

FW

+5

0.

T.

O

.P . E

LE

V:

1.

8" H

D

PE

T

EE

ST

A:

FW

+5

3.

T.

O

.P . E

LE

V:

2.

8" G

AT

E

VA

LV

E

FO(D)

FO(D)

FW 502+78

FW 500+00

FW

501+00

FW

502+00

8'' HDPE TEE

STA:FW 500+00.00

8'' GATE VALVE

STA:FW 500+04.17

8" WATER METER

STA:FW 500+08.52

TIE INTO EXISTING VALVE

STA:FW 502+77.58

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

FURNACE CREEK WATER

PLAN & PROFILE

SOUTH ALIGNMENT

178069

65 513

L. GRAEF

L. GRAEF

M. WHELEHON

1.17.2025

DEATH VALLEY

NATIONAL PARK

318717 01-

C1.40

HORIZ.

VERT.

PLAN

PROFILE 20 0 20 40

SCALE OF FEET

10 0 10 20

KEY MAP

NTS

3.00' COVER

(MIN. COVER = 2.50')

DISTURBANCE

LIMIT 50'

SE

E

SH

EE

T C1

.3

SEE SHEET C1.41

D C3.12

EDGE OF PAVEMENT

EXISTING FIBER OPTIC LINE

APPROXIMATE EXISTING

GROUND SURFACE

8'' HDPE DR 11

WATER MAIN

8'' HDPE DR 11

WATER MAIN

8'' HDPE DR 17

WATER MAIN

8'' HDPE DR 17

WATER MAIN

3' MIN. SEPARATION BETWEEN

WATER AND FIBER OPTIC

DEATH VALLEY SCENICBYWAY, CA SR-190

APPROXIMATE LOCATION OF

EXISTING 3'X3' GABION

BASKET (WITH 12" OF COVER).

PROTECT IN PLACE.

40'X20'X6' HDD BORE PIT

SEE SHEET C1.40B

Sheets and Views
P&P - (18)

File details come from the government source that posted it. Updated .