This is a Demolition Plan for the Cow Creek facility located in Death Valley National Park. The plan outlines two primary demolition activities: the removal of an existing concrete irrigation valve vault and the eventual demolition of the existing Cow Creek Reverse Osmosis (RO) treatment building and water tank once a new RO treatment building is installed and service is switched over. Following demolition, the affected area is to be restored to natural grade.

The plan identifies specific construction requirements and coordination procedures for the contractor, including the reuse of all existing fire hydrants, removal and abandonment of existing water and sewer pipes encountered during water and sewer main installation, and the management of trench disturbance areas where asphalt, gravel, and topsoil will be removed and stockpiled. The contractor is permitted to submit alternative demolition plans for approval by the Contracting Officer, and all removals must be coordinated with the Contracting Officer. The existing RO treatment building must remain in service during construction to ensure continuity of operations. Additional details regarding contractor site use are referenced in Project Specification Section 011100, 1.4.

View the file

Other files

File Type Posted
B09_Amd11_-_B08_Attach3_-_WD_CA20260020_Mod2_0011.pdf PDF
Sol_140P2025R0082_Amd_0011.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_42_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_38_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_40_Jan2026_0010.pdf PDF
B09_Amd10_QR_Tracker_-_DEVA_318717_Final_0010.xlsx XLSX spreadsheet
B09_Amd10_-_QR55_Attach_Drawing_01-C4_39_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_00-C8_27_Jan2026_0010.pdf PDF
B09_Amd10_-_QR86_Attach_Drawing_C1_40_0010.pdf PDF
B09_Amd10_-_Drawing_G1_22_0010.pdf PDF
B09_Amd10_-_QR86_Attach_Drawing_C1_40B_0010.pdf PDF
Sol_140P2025R0082_Amd_0010.pdf PDF
B09_Amd10_-_B08_Attach4_-_DetailedContractPriceSchedule_0010.xlsx XLSX spreadsheet
B09_Amd10_-_Drawing_G1_2_0010.pdf PDF
B09_Amd10_-_Drawing_Coversheet_00_DEVA_318717_Jan2026x_0010.pdf PDF
B09_Amd10_-_Drawing_G1_21_0010.pdf PDF
Sol_140P2025R0082_Amd_0009.pdf PDF
B09_Amd8_-_Drawing_02-C5_29_Jan2026_0008.pdf PDF
B09_Amd8_-_Spec_33_14_19_-_VALVES___HYDRANTS_FOR_WATER_UTILITY_SERVICE_0008.pdf PDF
B09_Amd8_-_Drawing_02-G1_16_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_08_33_22_-_ALUMINUM_ROLLING_OVERHEAD_DOORS_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_29_Jan2026_0008.pdf PDF
B09_Amd8_-_QR22_Attach_Drawing_00-C7_1_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C5_25_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_00-C8_30_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_01-C4_42_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_01-C3_1_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_20_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_32_00_-_WASTEWATER_PUMPING_STATIONS_0008.pdf PDF
B09_Amd8_-_Spec_33_31_11_-_GRAVITY_SEWER_PIPELINE___MANHOLE_INSTALLATION_0008.pdf PDF
B09_Amd8_QR_Tracker_-_DEVA_318717_0008.xlsx XLSX spreadsheet
B09_Amd8_-_Drawing_Coversheet_00_DEVA_318717_Jan2026_0008.pdf PDF
Sol_140P2025R0082_Amd_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_31_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C6_7_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_15_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-G1_2_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C7_5_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_11_13_-_POTABLE_WATER_SUPPLY_WELLS_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_18_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_02-C5_33_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_42_Jan2026_0008.pdf PDF
B09_Amd8_-_QR56_Attach_Drawing_02-C2_20_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_31_05_-_MANHOLE_LINING___REHABILITATION_0008.pdf PDF
B09_Amd8_-_Drawing_01-G1_15_Jan2026_0008.pdf PDF
B09_Amd8_-_QR56_Attach_Drawing_02-C2_18_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_67_Jan2026_0008.pdf PDF
B09_Amd8_-_Spec_46_33_11_-_CHEMICAL_FEED_-_LIQUID_SYSTEMS_0008.pdf PDF
B09_Amd8_-_Drawing_02-C2_22_Jan2026_0008.pdf PDF
B09_Amd8_-_QR22_Attach_Drawing_02-C5_64_Jan2026_0008.pdf PDF
Show 40 more

Latest 50 of 109 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W 8''

ARV

ARV

ARV

A R

V

ARV

A R

V

W

W 8''

W 8''

W 8''

W 8''

W 8''

W 8''

W 8''

W

W 8''

W 8''

W 8''

W

GV

GV

GV

GV

GV

GV

GV

G V

PRV

P R

V

ARV

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

178069

318717

DEMOLITION PLAN - COW CREEK

COW CREEK

DEMOLITION PLAN 2

178069

24 513

L. GRAEF

L. GRAEF

M. WHELEHON

1.17.2025

DEATH VALLEY

NATIONAL PARK

318717 02- X1.2

TIMBINDINA'A (NEVARES) SPRINGS

AND WELL AREA

RO TREATMENT

BUILDING AND

WATER TANK

CONCRETE IRRIGATION

VALVE VAULT TO BE

DEMOLISHED

DEMOLITION FOOTNOTES:

EXISTING CONCRETE IRRIGATION VALVE VAULT TO BE DEMOLISHED

EXISTING COW CREEK RO TREATMENT BUILDING IS TO REMAIN IN SERVICE DURING

CONSTRUCTION. ONCE NEW RO TREATMENT BUILDING IS INSTALLED, AND SERVICE IS

SWITCHED OVER, EXISTING RO TREATMENT BUILDING IS TO BE REMOVED AND AREA IS TO BE

BROUGHT BACK TO NATURAL GRADE.

NOTES:

1. ALTERNATIVE DEMOLITION PLANS MAY BE SUBMITTED BY THE CONTRACTOR FOR

APPROVAL BY THE CONTRACTING OFFICER.

2. REMOVALS ARE TO BE COORDINATED WITH THE CONTRACTING OFFICER.

3. FOR MORE INFORMATION REGARDING THE CONTRACTOR'S USE OF THE SITE - SEE

PROJECT SPECIFICATION SECTION 011100, 1.4.

4. REUSE ALL EXISTING FIRE HYDRANTS.

5. REMOVE EXISTING WATER AND SEWER PIPE ENCOUNTERED IN TRENCH DURING

WATER/SEWER MAIN INSTALL. ABANDON PIPE OUTSIDE OF TRENCH LIMITS IN

ACCORDANCE WITH PROJECT SPECIFICATIONS.

6. REMOVE EXISTING SEWER PIPE ENCOUNTERED IN TRENCH DURING WATER/SEWER MAIN

INSTALL. CUT AND CAP PIPE AT TRENCH WALL.

7. TRENCH DISTURBANCE LIMITS INDICATE AREAS WHERE ASPHALT, GRAVEL AND TOP SOIL

WILL BE REMOVED. GRAVEL AND TOP SOIL TO BE STOCKPILED.

250 0 250 500

SCALE OF FEET

AutoCAD SHX Text 12/19/25 08:23 LAUREL.OTTEY F:\7194.05 DEVA WATER AND WASTEWATER SYSTEM REHAB\DRAWINGS\DWG\CIVIL\5 SHEET PRODUCTION\3_DEVA W_WW REHAB DEMO.DWG

Kelly.Kero Text Box

Kelly.Kero PolyLine

Kelly.Kero Cloud

Sheets and Views
X1.2 Demo CC (2)

File details come from the government source that posted it. Updated .