B09_Amd10_-_QR55_Attach_Drawing_01-C4_39_Jan2026_0010.pdf
PDF 607 KB Posted
- Solicitation number
- 140P2025R0082
About this file
This is a site plan and headworks design drawing for the Furnace Creek Wastewater Sewage Lagoon System located at Death Valley National Park. The drawing, dated January 17, 2025, was designed by C. Weaver, technically reviewed by V. Neary, and approved by M. Whelehon.
The site plan depicts a comprehensive wastewater treatment facility layout that includes mechanical screening equipment with removable grating housed in a concrete in-channel screen structure, a 3-phase 1 HP 230V spiral screen with shade structure, an RFP2 traffic-rated flume-based metering manhole with ultrasonic flow sensor (SSMH-103), a concrete pad with davit crane, a lagoon shed for power and control panels, a yard hydrant, and a dump station. The plan specifies installation of 3,239 linear feet of 6-foot chainlink fence around the facility perimeter. The horizontal scale indicates various structural dimensions, ranging from approximately 3.69 feet to 34 feet in length. The site also identifies a limit of grading disturbance area and indicates removal of 2,865 linear feet of existing fence. The drawing references additional detail sheets (01-4A.101 and 01-4S.101) for lagoon shed specifications and screening equipment shade structure details. The project is identified as drawing number C4.39, sheet 216 of 513, with PMIS/PKG number 318717 and package number 178069.
View the file
Other files
Show 40 more
Latest 50 of 109 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
-237
-237
SSSSSS
X
X
X
X
X
X
X
SSSSSS
CL CL CL
CL
CL
CL
CLCLCLCL
CL
CL
CL
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS
W S
-237
-237
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
FURNACE CREEK WASTEWATER
SEWAGE LAGOON SYSTEM
SITE PLAN & HEADWORKS
178069
216 513
C. WEAVER
V. NEARY
M. WHELEHON
1.17.2025
DEATH VALLEY
NATIONAL PARK
318717 01-
C4.39
SCALE
A C4.39
LAGOON HEADWORKS - MECHANICAL SCREENING, FLOW METER AND CONCRETE PAD DETAIL
1" = 8'
3PH 1 HP 230V
MECHANICAL
SCREENING
EQUIPMENT
REMOVABLE
GRATING
CONCRETE IN-CHANNEL
SCREEN STRUCTURE
YARD HYDRANT
LAGOON SHED FOR POWER
AND CONTROL PANELS SEE
SHEET 01-4A.101 FOR
DETAILS
60"Ø TRAFFIC RATED FLUME BASED
METERING MANHOLE WITH
ULTRASONIC FLOW SENSOR
FC SSMH-103
CONCRETE
PAD
DAVIT
CRANE
FC SSMH-102
H Y D
LIMIT OF
GRADING
DISTURBANCE
HORIZ.8 0 8 16
SCALE OF FEET
28'
12.30'
13.39'
3.69'
20'
13'
10.00'
18.38' 7.29'
14'
34'
DUMP
STATION
SPIRAL SCREEN
SHADE STRUCTURE
SEE SHEET 01-4S.101
FOR DETAILS
21.50'
12.60'
5.61' 20'
14.1'
8.38'
SERVICE ROAD
DISTURBANCE
LIMITS
INSTALL 3239' 6-FT
CHAINLINK FENCE
REMOVE 2855'
EXISTING FENCE
A C8.27
B C7.7
A C7.4
A C7.3
| Sheets and Views |
| 215 HEADWORKS AREA SITE PLAN |
File details come from the government source that posted it. Updated .