This is a site plan drawing for the Furnace Creek Wastewater Sewage Lagoon System located at Death Valley National Park. The drawing (Sheet C4.38, dated January 17, 2025) depicts the overall layout of a wastewater treatment facility comprising three lagoon cells, with associated infrastructure and site improvements.
Key project elements include: removal and replacement of approximately 2,855 linear feet of existing fence with 3,239 linear feet of new 6-foot chainlink fence with double swing gate; construction of headworks infrastructure; grading of existing Cell #3; installation of pond level gauges and aerators; grade and riprap work for erosion control; and mooring line and mast installations. The contractor must perform fill excavation, soil mixing, and material stockpiling within designated soil quarry and stockpiling boundaries, with stockpiles confined to the quarry area per Section 31 23 00 "Earthwork," Paragraph 3.6. The site plan identifies potential quarry areas, site-generated fill mixing areas, temporary pit run and dredge fill stockpiles, and a service road connection to existing cells. The project is designed by C. Weaver, with technical review by V. Neary and M. Whelehon, under PMIS/PKG No. 178069 and Drawing No. 01-318717.
View the file
Other files
Show 40 more
Latest 50 of 109 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
-2
-233
-2
-233
-2
-237
-23
-236
-23
-2
-237
-239
-23
-239
-2
-2
-238
-240
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
S
S
X X X X X X
X
X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X X X X X X X X X X X X X X X X X X X X X
S
CL
CL
W S
W S
W S
W S
W S
W S
W S
ES(B) ES(B) ES(B) ES(B) ES(B) ES(B) ES(B)
S
ES(D) ES(D) ES(D) ES(D) ES(D) ES(D) ES(D) ES(D) ES(D)
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X
W S
W S
W S
W S
W S
W S
W S
-235
-2
-2
-235 -2
-237
-237 -237
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
FURNACE CREEK WASTEWATER
SEWAGE LAGOON SYSTEM
SITE PLAN
178069
215 513
C. WEAVER
V. NEARY
M. WHELEHON
1.17.2025
DEATH VALLEY
NATIONAL PARK
318717 01-
C4.38
HORIZ.50 0 50 100
SCALE OF FEET
REMOVE AND REPLACE
DIVERSION MANHOLE
EXISTING LAGOON
CELL #1
EXISTING
8-INCH DIP
INSTALL 3239' 6-FT
CHAINLINK FENCE
EXISTING LAGOON
CELL #2
EXISTING LAGOON
CELL #3
DOUBLE SWING
GATE
PROPOSED SURFACE
AERATORS
PROPOSED SURFACE
AERATORS
DISTURBANCE LIMITS
INSTALL POND
LEVEL GAUGE
8" SDR 35 PVC
PROPOSED GANGWAY
AND FLOATING DOCK
(TYP.)
REMOVE 2855'
EXISTING FENCE
SERVICE ROAD
CONNTECT TO
EXISTING CELL
#1 & #2 PIPES
NOTES:
1. REMOVE ENTIRETY OF EXISTING FENCE
2. CONSTRUCT PROPOSED FENCE LINE AND HEADWORKS.
3. GRADE EXISTING CELL #3.
4. CONTRACTOR SHALL PERFORM FILL EXCAVATION AND MIXING WITHIN SOIL QUARRY AND
STOCKPILING BOUNDARY. STOCKPILES SHALL BE CONFINED TO WITHIN THE SOIL QUARRY
AND STOCKPILING BOUNDARY. SEE SECTION 31 23 00 "EARTHWORK", PARAGRAPH 3.6 FOR
MORE DETAILS.
HEADWORKS AREA
SEE SHEET C4.39
GRADE AND INSTALL RIPRAP
SEE SHEET C4.42
MOORING LINE
AND MAST (TYP.)
A C8.27
A C8.27
D C7.2
D C7.10
SOIL QUARRY AND
STOCKPILE BOUNDARY
POTENTIAL
QUARRY AREA
POTENTIAL SITE GENERATED
FILL MIXING AREA
POTENTIAL TEMPORARY
PIT RUN AND DREDGE FILL
STOCKPILE
A C7.13
A C7.13
INSTALL POND
LEVEL GAUGE
INSTALL POND
LEVEL GAUGE
C C7.7
D C7.7
D C7.7