This is a technical grading plan drawing for the Furnace Creek Wastewater Sewage Lagoon System, Cell #3, located within Death Valley National Park. The drawing, dated January 17, 2025, was designed and reviewed by V. Neary and M. Whelehon and is identified as drawing C4.42 within PMIS package 178069.

The plan specifies construction requirements for an unsealed pond lagoon cell with a pond bottom elevation of -246.10 feet, high water surface level at -242.10 feet, and dike top elevations at -238.10 feet. Key features include a 6-foot chainlink fence replacement, protection of an existing 8-inch ductile iron overflow pipe with an invert elevation of -240.38 feet, installation of a pond level gauge, riprap armoring around the dike perimeter, a 14-foot wide equipment entry area, an aerator with mooring mast, a walkway/gangway and floating dock system, and a proposed gravel edge. Construction requirements mandate scarification of the pond bottom to 12 inches depth for infiltration improvement, uniform grading with low-permeability fill in accordance with Section 31.23.00 Earthwork specifications, riprap armor installation per Section 31.37.00, and completion of work during dry pond conditions typically in summer or early fall. The plan includes detailed cross-sectional views showing slope ratios of 4:1, existing grade transitions, and water surface elevations that vary based on operational conditions.

View the file

Other files

File Type Posted
B09_Amd11_-_B08_Attach3_-_WD_CA20260020_Mod2_0011.pdf PDF
Sol_140P2025R0082_Amd_0011.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_42_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_38_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_40_Jan2026_0010.pdf PDF
B09_Amd10_QR_Tracker_-_DEVA_318717_Final_0010.xlsx XLSX spreadsheet
B09_Amd10_-_QR55_Attach_Drawing_01-C4_39_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_00-C8_27_Jan2026_0010.pdf PDF
B09_Amd10_-_QR86_Attach_Drawing_C1_40_0010.pdf PDF
B09_Amd10_-_Drawing_G1_22_0010.pdf PDF
B09_Amd10_-_QR86_Attach_Drawing_C1_40B_0010.pdf PDF
Sol_140P2025R0082_Amd_0010.pdf PDF
B09_Amd10_-_B08_Attach4_-_DetailedContractPriceSchedule_0010.xlsx XLSX spreadsheet
B09_Amd10_-_Drawing_G1_2_0010.pdf PDF
B09_Amd10_-_Drawing_Coversheet_00_DEVA_318717_Jan2026x_0010.pdf PDF
B09_Amd10_-_Drawing_G1_21_0010.pdf PDF
Sol_140P2025R0082_Amd_0009.pdf PDF
B09_Amd8_-_Drawing_02-C5_29_Jan2026_0008.pdf PDF
B09_Amd8_-_Spec_33_14_19_-_VALVES___HYDRANTS_FOR_WATER_UTILITY_SERVICE_0008.pdf PDF
B09_Amd8_-_Drawing_02-G1_16_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_08_33_22_-_ALUMINUM_ROLLING_OVERHEAD_DOORS_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_29_Jan2026_0008.pdf PDF
B09_Amd8_-_QR22_Attach_Drawing_00-C7_1_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C5_25_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_00-C8_30_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_01-C3_1_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_20_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_32_00_-_WASTEWATER_PUMPING_STATIONS_0008.pdf PDF
B09_Amd8_-_Spec_33_31_11_-_GRAVITY_SEWER_PIPELINE___MANHOLE_INSTALLATION_0008.pdf PDF
B09_Amd8_QR_Tracker_-_DEVA_318717_0008.xlsx XLSX spreadsheet
B09_Amd8_-_Drawing_Coversheet_00_DEVA_318717_Jan2026_0008.pdf PDF
Sol_140P2025R0082_Amd_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_31_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C6_7_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_15_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-G1_2_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C7_5_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_11_13_-_POTABLE_WATER_SUPPLY_WELLS_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_18_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_02-C5_33_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_42_Jan2026_0008.pdf PDF
B09_Amd8_-_QR56_Attach_Drawing_02-C2_20_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_31_05_-_MANHOLE_LINING___REHABILITATION_0008.pdf PDF
B09_Amd8_-_Drawing_01-G1_15_Jan2026_0008.pdf PDF
B09_Amd8_-_QR56_Attach_Drawing_02-C2_18_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_67_Jan2026_0008.pdf PDF
B09_Amd8_-_Spec_46_33_11_-_CHEMICAL_FEED_-_LIQUID_SYSTEMS_0008.pdf PDF
B09_Amd8_-_Drawing_02-C2_22_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-X1_2_Jan2026_0008.pdf PDF
B09_Amd8_-_QR22_Attach_Drawing_02-C5_64_Jan2026_0008.pdf PDF
Show 40 more

Latest 50 of 109 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

-242 -240

-238

-2 .0

-2 .0

% -2 .0

-0 .7

-2 5.

0%

-1.0%

-1.1%

-1.2%

-0.9%

-1.2%

-1.0%

-245 -244

-243

-241 -240

-239

-239

-240

-2

-246 -245

-244 -243

-242 -241

-2

-2

-2

-2

-2

-240 -239

-239

-239 -241

-240

-239 -240

-242

-2

-2

-25.0%

-243

-244

-239

-2

-2

-238

-2 .0

-25.0% -25.0%

-2 .0

-25.0%

-2 .0

-1 .0

-1.0%

-239

-2

-240 -239

-240-241

-241

-2

-2

-250

-240

-230

-250

-240

-230

1+20 1+40 1+60 1+80 2+00 2+20 2+40 2+60 2+80 3+00 3+20 3+40 3+60 3+80 4+00 4+20 4+40 4+60 4+80 5+00 5+20 5+40 5+60 5+80 6+00 6+20 6+40 6+606+70

-250

-240

-230

-250

-240

-230

1+20 1+40 1+60 1+80 2+00 2+20 2+40 2+60 2+80 3+00 3+20 3+40 3+603+70

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

FURNACE CREEK WASTEWATER

SEWAGE LAGOON SYSTEM

CELL #3 GRADING PLAN

178069

219 513

V. NEARY

V. NEARY

M. WHELEHON

1.17.2025

DEATH VALLEY

NATIONAL PARK

318717 01-

C4.42

HORIZ.

VERT.

20 0 20 40

SCALE OF FEET

50 0 10 20

EXISTING LAGOON CELL #3 REHABILITATION NOTES

1. SCARIFY POND BOTTOM TO A DEPTH OF 12" TO IMPROVE INFILTRATION.

2. REGRADE CELL TO PROVIDE A UNIFORMLY GRADED SLOPE WITH LOW PERMEABILITY FILL IN ACCORDANCE WITH SECTION 31 23 00 "EARTHWORK", PARAGRAPH 3.6.

3. PROVIDE RIPRAP ARMORING FROM TOE TO TOP OF DIKE AROUND ENTIRETY OF CELL. SEE DETAIL E/C7.7 AND SECTION 31 37 00 "LAGOON RIPRAP"

4. SLOPE AROUND ENTIRETY OF CELL FRONT SLOPE AND BACK SLOPE OF ACCESS ROAD SHALL BE 4:1.

5. WORK SHALL OCCUR WHEN POND IS DRY, TYPICALLY DURING SUMMER OR EARLY FALL.

6. PUMPING WATER FROM CELL #3 TO OTHER CELLS IS ALLOWED TO INCREASE THE EVAPORATION OF CELL #3. FILL SHALL BE MIXED AND PLACED IN ACCORDANCE WITH SECTION 31 23 00 "EARTHWORK", PARAGRAPH 3.6

7. SEE SHEET C4.38 FOR SOIL QUARRY AND STOCKPILE BOUNDARIES.

LAGOON CELL #3 PLAN

LAGOON CELL #3 - UNSEALED

POND BOTTOM

ELEV: -246.10

HIGH WATER SURFACE LEVEL

ELEV: -242.10

TOP BACK OF DIKE

ELEV: -238.10

TOP FRONT OF DIKE

ELEV: -238.10

REMOVE AND REPLACE

6-FT CHAINLINK FENCE

EXISTING 8-INCH DUCTILE IRON OVERFLOW

PIPE PROTECT IN PLACE

INSTALL POND LEVEL GAUGE

POND BOTTOM: -246.10'

WATER SURFACE

ELEV: VARIES

TOP BACK OF DIKE

ELEV: VARIESTOP FRONT OF DIKE

ELEV: -238.10

TOP OF DIKE

MIN. 12' WIDTH

EXISTING GRADE

FINISH GRADE

EXISTING EDGE OF ROAD

4:1 SLOPE

4:1 SLOPE

SECTION A-A'

A'A

SECTION B-B'

WATER SURFACE

ELEV: VARIES

POND BOTTOM: -246.10'

TOP OF DIKE

MIN. 12' WIDTH, TYP.

EXISTING GRADE4:1 SLOPE

TOP BACK OF DIKE

ELEV: VARIES TOP FRONT OF DIKE

ELEV: -238.10

FINISH GRADE

4:1 SLOPE

EXISTING 8-INCH DUCTILE IRON

OVERFLOW PIPE PROTECT IN PLACE

RIPRAP ARMOR

RIPRAP ARMOR, TYP.

B'

B

LAGOON DISTURBANCE

LIMITS

EXISTING OVERFLOW PIPE

INVERT ELEV: -240.38

WALKWAY, GANGWAY

AND FLOATING DOCK

C C7.7

C C7.13

E C7.7

PROPOSED EDGE

OF GRAVEL

EDGE OF DIKE

BACK SLOPE FILL

14' WIDE EQUIPMENT ENTRY AREA

DO NOT INSTALL RIP RAP

E C7.7

AERATOR MOORING MAST, TYP. D

C7.2

AutoCAD SHX Text 1/8/25 15:46 TYLER.FRANCIS F:\7194.05 DEVA WATER AND WASTEWATER SYSTEM REHAB\DRAWINGS\DWG\CIVIL\5 SHEET PRODUCTION\4_DEVA FC WW_GRADING

Kelly.Kero PolyLine

Kelly.Kero Cloud

Kelly.Kero Text Box

Sheets and Views
219 Lagoon Cell 3 Grading Plan