B09_Amd8_-_Drawing_01-G1_15_Jan2026_0008.pdf
PDF 1 MB Posted
- Solicitation number
- 140P2025R0082
About this file
This is a technical drawing sheet depicting a Temporary Water Plan for the Furnace Creek Water System at Death Valley National Park. The drawing shows the existing water infrastructure and proposed temporary water piping layout across the Furnace Creek area, including connections to multiple facilities: Furnace Creek Campground, Sunset Campground, Texas Springs Campground, Furnace Creek Inn, Furnace Creek Visitor Center, Timbisha Shoshone Village, The Ranch at Death Valley, and the Furnace Creek Airport.
The contractor is required to maintain water service to all buildings during construction by installing temporary water piping and appurtenances as needed, with short interruptions permitted only for tie-in connections as specified in Section 01 11 00. Key requirements include: supply wells must be shut off prior to making tie-in connections; the system will temporarily utilize water stored in existing storage tanks for distribution; approximately 2,100 linear feet of bypass piping must be provided in areas where the proposed water main is closer than 3 feet to existing infrastructure; excess trench spoil must be hauled on-site to the Cow Creek Administrative Area mixing table; connections to existing water mains require coordination with the Contracting Officer; and the contractor must maintain access to all areas while notifying the Contracting Officer before any temporary road shutdowns. Alternative temporary water plans may be submitted by the contractor for Contracting Officer approval. Materials and equipment must be stored within designated storage and staging areas identified on Sheet G1.14.
View the file
Other files
Show 40 more
Latest 50 of 109 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HQ ACCESS ROAD
TEXAS SPRINGS
CAMPGROUND ROAD
DEATH VALLEY SCENIC
BYWAY, CA SR-190
GREENLAND
BLVD
DE
AT
H
VA
LL
EY
S
CE
NI
C
BY
W
AY
, C
A
SR
-1
FURNACE CREEK
CAM
PG
RO
UND RO
AD
SUNSET
CAMPGROUND
ROAD
FURNACE CREEK
CAM
PGROUND ROAD
FURNACE CREEK
CAMPGROUND ROAD
WS
W 8''
W 8''
FRONTAGE ROAD
WS
WS
WS WS W
S
WS
WS
WS
WS
FO(D)
FO(D)
FO(D)
FO(D)
FO(D) FO(D)
F O(D
F O
(D
H Y
D
WM
WM
FW 502+78
FW 500+00
FW
501+00
FW
502+00
WM
WS
WS
WS WS W
S
WS
WS
WS
WS
FM
FM
ARV
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
178069
318717
TEMPORARY
WATER PLAN FOR
FURNACE CREEK WATER
178069
16 513
L. GRAEF
L. GRAEF
M. WHELEHON
1.17.2025
DEATH VALLEY
NATIONAL PARK
318717 01-
G1.15TEMPORARY WATER PLAN
FURNACE CREEK WATER SYSTEM
SHEET NOTES:
1. ALTERNATIVE TEMPORARY WATER PLANS MAY BE SUBMITTED BY THE
CONTRACTOR FOR APPROVAL BY THE CONTRACTING OFFICER.
2. CONNECTIONS TO EXISTING WATER MAINS ARE ARE TO BE COORDINATED WITH
THE CONTRACTING OFFICER.
3. THE CONTRACTOR MUST MAINTAIN ACCESS TO ALL AREAS. CONTRACTOR TO
NOTIFY CONTRACTING OFFICER, OR HIS/HER REPRESENTATIVE, BEFORE
TEMPORARY ROAD SHUT-DOWNS.
4. STORAGE/STAGING AREAS: STORE MATERIALS AND EQUIPMENT WITHIN
DESIGNATED STORAGE/STAGING AREAS. SEE SHEET G1.14. FOR APPROVED
STORAGE/STAGING AREAS.
WASTEWATER
TREATMENT
LAGOONS FURNACE CREEK
CAMPGROUND
SUNSET
CAMPGROUND
TEXAS SPRINGS
CAMPGROUND
FURNACE CREEK
INN
FURNACE CREEK
WELLS
THE RANCH AT
DEATH VALLEY
TIMBISHA
SHOSHONE
VILLAGE
RO TREATMENT BUILDING
AND WATER TANK
AIRSTRIP
FURNACE
CREEK
AIRPORT
FURNACE CREEK
VISITOR CENTER
700 0 700 1400
SCALE OF FEET
MAINTAIN WATER SERVICE TO ALL BUILDINGS DURING CONSTRUCTION. INSTALL
TEMPORARY WATER PIPING AND APPURTENANCES AS NEEDED. SHORT
INTERRUPTIONS FOR TIE-IN ARE ALLOWED, AS SPECIFIED IN SECTION 01 11 00
"SUMMARY OF WORK".
SUPPLY WELLS SHALL BE OFF PRIOR TO MAKING TIE-IN CONNECTIONS. TEMPORARILY,
THE SYSTEM WILL UTILIZE WATER IN THE STORAGE TANKS FOR DISTRIBUTION.
ON-SITE HAUL AND STOCKPILE: EXCESS TRENCH SPOIL WILL BE HAULED
ON-SITE TO THE MIXING TABLE SOUTH OF THE COW CREEK ADMINISTRATIVE AREA.
SEE SHEET G1.12.
TEMPORARY WATER SYSTEM FOOTNOTES:
TO THE COW CREEK
ADMINISTRATIVE AREA
TIE INTO EXISTING
RO TREATMENT
BUILDING
TIE INTO EXISTING
BUNKER
EXISTING SUPPLY PIPE BETWEEN THE
WELLS AND THE RO TREATMENT BUILDING
TO REMAIN ACTIVE UNTIL THE CONTRACTOR
IS READY TO TIE-IN THE NEW SYSTEM.
CONTRACTOR TO PROVIDE ~2,100 LF OF
BYPASS PIPING IN AREAS WHERE
PROPOSED WATER MAIN IS CLOSER THAN 3'
OF EXISTING.
TIE INTO EXISTING WATER
DISTRIBUTION MAIN TO
TIMBISHA SHOSHONE VILLAGE
1 TIE INTO EXISTING
METER VAULT TO
XANTERRA INN
EXISTING DISTRIBUTION PIPE TO REMAIN
ACTIVE UNTIL THE CONTRACTOR IS READY
TO TIE-IN THE NEW SYSTEM
EXISTING DISTRIBUTION
PIPE TO REMAIN ACTIVE
UNTIL THE CONTRACTOR
IS READY TO TIE-IN THE
NEW SYSTEM
EXISTING DISTRIBUTION PIPE TO REMAIN
ACTIVE TO PROVIDE SERVICE TO THE
VISITOR CENTER UNTIL THE CONTRACTOR
IS READY TO TIE IN THE NEW SYSTEM
AutoCAD SHX Text 12/5/25 08:52 LAUREL.OTTEY F:\7194.05 DEVA WATER AND WASTEWATER SYSTEM REHAB\DRAWINGS\DWG\CIVIL\5 SHEET PRODUCTION\2_DEVA W_WW REHAB GENERAL_CON SEQ BID OP.DWG
Kelly.Kero Cloud
Kelly.Kero PolyLine
Kelly.Kero Text Box
| Sheets and Views |
| Const seq - FC W |
File details come from the government source that posted it. Updated .