B09_Amd8_-_Drawing_01-C1_31_Jan2026_0008.pdf

PDF 755 KB Posted

Attached to
DEVA 318717 - Rehab Furnace & Cow Creeks WTP/WWTP
Solicitation number
140P2025R0082
Issued by

About this file

This is a technical plan and profile drawing sheet for the Furnace Creek Water infrastructure project at Death Valley National Park, specifically depicting the South Alignment segment. The drawing is dated January 17, 2025, and was designed by L. Graef with technical review by M. Whelehon (Drawing No. C1.31, Sheet 56 of 513, PMIS/PKG No. 318717).

The project involves installation of 8-inch HDPE DR 11 water main piping along Death Valley Scenic Byway (SR-190) in California, with approximately 360 linear feet of open trench excavation required. Key infrastructure elements include the placement of 8-inch gate valves at stations FW 182+66.92 (top of pipe elevation -157.19) and FW 182+75.08 (top of pipe elevation -157.01), an 8-inch by 6-inch HDPE tee at station FW 182+70.85 (top of pipe elevation -157.10), and a 4-inch pressure reducing valve with RPZ backflow preventer. The plan identifies existing utility crossings including a water main at station FW 182+95.53 and overhead power at station FW 183+55.42. The contractor must verify the size, depth, and material of the existing water main and tie into it at the designated tee location. Additional requirements include a minimum 2.83-foot cover over the water main (minimum required is 2.50 feet) and a 3-foot minimum separation between the water main and existing fiber optic line. The project also involves capping and abandoning an existing water main section and installing a water meter with associated components.

View the file

Other files

File Type Posted
B09_Amd11_-_B08_Attach3_-_WD_CA20260020_Mod2_0011.pdf PDF
Sol_140P2025R0082_Amd_0011.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_42_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_38_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_40_Jan2026_0010.pdf PDF
B09_Amd10_QR_Tracker_-_DEVA_318717_Final_0010.xlsx XLSX spreadsheet
B09_Amd10_-_QR55_Attach_Drawing_01-C4_39_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_00-C8_27_Jan2026_0010.pdf PDF
B09_Amd10_-_QR86_Attach_Drawing_C1_40_0010.pdf PDF
B09_Amd10_-_Drawing_G1_22_0010.pdf PDF
B09_Amd10_-_QR86_Attach_Drawing_C1_40B_0010.pdf PDF
Sol_140P2025R0082_Amd_0010.pdf PDF
B09_Amd10_-_B08_Attach4_-_DetailedContractPriceSchedule_0010.xlsx XLSX spreadsheet
B09_Amd10_-_Drawing_G1_2_0010.pdf PDF
B09_Amd10_-_Drawing_Coversheet_00_DEVA_318717_Jan2026x_0010.pdf PDF
B09_Amd10_-_Drawing_G1_21_0010.pdf PDF
Sol_140P2025R0082_Amd_0009.pdf PDF
B09_Amd8_-_Drawing_02-C5_29_Jan2026_0008.pdf PDF
B09_Amd8_-_Spec_33_14_19_-_VALVES___HYDRANTS_FOR_WATER_UTILITY_SERVICE_0008.pdf PDF
B09_Amd8_-_Drawing_02-G1_16_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_08_33_22_-_ALUMINUM_ROLLING_OVERHEAD_DOORS_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_29_Jan2026_0008.pdf PDF
B09_Amd8_-_QR22_Attach_Drawing_00-C7_1_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C5_25_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_00-C8_30_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_01-C4_42_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_01-C3_1_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_20_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_32_00_-_WASTEWATER_PUMPING_STATIONS_0008.pdf PDF
B09_Amd8_-_Spec_33_31_11_-_GRAVITY_SEWER_PIPELINE___MANHOLE_INSTALLATION_0008.pdf PDF
B09_Amd8_QR_Tracker_-_DEVA_318717_0008.xlsx XLSX spreadsheet
B09_Amd8_-_Drawing_Coversheet_00_DEVA_318717_Jan2026_0008.pdf PDF
Sol_140P2025R0082_Amd_0008.pdf PDF
B09_Amd8_-_Drawing_02-C6_7_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_15_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-G1_2_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C7_5_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_11_13_-_POTABLE_WATER_SUPPLY_WELLS_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_18_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_02-C5_33_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_42_Jan2026_0008.pdf PDF
B09_Amd8_-_QR56_Attach_Drawing_02-C2_20_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_31_05_-_MANHOLE_LINING___REHABILITATION_0008.pdf PDF
B09_Amd8_-_Drawing_01-G1_15_Jan2026_0008.pdf PDF
B09_Amd8_-_QR56_Attach_Drawing_02-C2_18_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_67_Jan2026_0008.pdf PDF
B09_Amd8_-_Spec_46_33_11_-_CHEMICAL_FEED_-_LIQUID_SYSTEMS_0008.pdf PDF
B09_Amd8_-_Drawing_02-C2_22_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-X1_2_Jan2026_0008.pdf PDF
B09_Amd8_-_QR22_Attach_Drawing_02-C5_64_Jan2026_0008.pdf PDF
Show 40 more

Latest 50 of 109 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W

W

EW

(B

EW

(B

EW

(B

EW

(B

EW

(B

EW

(B

EW

(B

EW

(B

EW

(B

EIR

R(D

EIR

R(D

EIR

R(D

EIR

R(D

EIR

R(D

O H

P O

H P

O H

P O

H P

O H

P O

H P

O H

P O

H P

O H

P

W

W

W

W

FO(D)

FO(D)

FO(D) FO(D) FO(D) FO(D) FO(D) FO(D) FO(D) FO(D) FO(D) FO(D) FO(D) FO(D) FO(D) FO(D) FO(D) FO(D) FO(D) FO(D) FO(D) FO(D) FO(D) FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

APPROXIMATE START LOCATION FOR HDD

STA:FW 180+30.00

APPROXIMATE END LOCATION FOR HDD

STA:FW 181+40.00

8'' GATE VALVE

STA:FW 182+75.08

8'' X 6" HDPE TEE

STA:FW 182+70.85

8'' GATE VALVE

STA:FW 182+66.92

-162

-1

-156 -15

-154

-153

-152

-151 -150

-1

-1

-1

-147

-146

EXISTING WATER

MAIN CROSSING

STA: FW 182+95.53

EXISTING OVERHEAD

POWER CROSSING

STA: FW 183+55.42

W 8''

W 8'' W 8''

W 8'' W 8'' W 8'' W 8'' W 8''

W 8''

W 8''

W 8''

W 6''

GV GV

PR

V

FO(D)

FO(D)

FO(D) FO(D) FO(D) FO(D) FO(D) FO(D) FO(D) FO(D) FO(D) FO(D) FO(D) FO(D) FO(D) FO(D) FO(D) FO(D) FO(D) FO(D) FO(D) FO(D) FO(D) FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

W M

FW 180+00

FW 181+00 FW 182+00 FW 183+00

FW 184+00

FW 185+00

L=3120.06' R=2846.26 D=62°48'26"

EXISTING IRRIGATION

LINE CROSSING

STA: FW 180+42.27

-180

-170

-160

-150

-140

-130

-120

-110

-180

-170

-160

-150

-140

-130

-120

-110

FW 180+00

-1

.1

-1

.4

-1

.8

-1

.1

-1

.2

-1

.8

-1

.5

-1

.6

-1

.2

-1

.2

FW 181+00

-1

.0

-1

.7

-1

.3

-1

.3

-1

.4

-1

.9

-1

.3

-1

.4

-1

.3

-1

.0

FW 182+00

-1

.4

-1

.6

-1

.1

-1

.2

-1

.6

-1

.7

-1

.2

-1

.3

-1

.5

-1

.9

FW 183+00

-1

.1

-1

.4

-1

.8

-1

.0

-1

.3

-1

.6

-1

.5

-1

.1

-1

.2

-1

.7

FW 184+00

-1

.6

-1

.3

-1

.5

-1

.8

-1

.9

-1

.4

-1

.2

-1

.0

-1

.1

-1

.6

FW 185+00

-1

.0

-1

.1

ST

A:

F W

+4 2.

T.

O .P

. E

LE

V:

-1

.2

EX

IS

TI

N

G

IR

R

IG

AT

IO

N

LI

N E

C R

O

SS

IN

G

ST

A:

F W

+9 5.

T.

O .P

. E

LE

V:

-1

.7

EX

IS

TI

N

G W

AT

ER

M

AI

N C

R O

SS

IN

G

ST

A:

F W

+6 6.

T.

O .P

. E

LE

V:

-1

.1

8" G

AT

E

VA

LV

E

ST

A:

FW

+7

0.

T.

O

.P . E

LE

V:

-1

.1

8" X

" H

PD

E

TE

E

ST

A:

F W

+7 5.

T.

O .P

. E

LE

V:

-1

.0

8" G

AT

E

VA

LV

E

OPEN TRENCH

EXCAVATION

30.05'

HORIZONTAL DIRECTIONAL DRILLING 109.84' 360.00'OPEN TRENCH EXCAVATION 360.00'

FO(D)

FO(D)

FW

501+00

FW

502+00

TIE INTO EXISTING VALVE

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

FURNACE CREEK WATER

PLAN & PROFILE

SOUTH ALIGNMENT

178069

56 513

L. GRAEF

L. GRAEF

M. WHELEHON

1.17.2025

DEATH VALLEY

NATIONAL PARK

318717 01-

C1.31

HORIZ.

VERT.

PLAN

PROFILE 20 0 20 40

SCALE OF FEET

10 0 10 20

KEY MAP

NTS

APPROXIMATE EXISTING

GROUND SURFACE

INSTALL WATER PIPE

USING HDD BENEATH

WETLAND

EDGE OF

PAVEMENT

2.83' COVER

(MIN COVER = 2.50')

DISTURBANCE

LIMIT 50'

EXISTING WATER MAIN

EXISTING OVERHEAD

POWER

SENSITIVE AREA

(WETLAND)

SE

E

SH

EE

T C

1.

SE

E

SH

EE

T C

1.

D C3.12

63 LF OF 6 HDPE WATER MAIN

DEATH VALLEY SCENIC

BYWAY, CA SR-190 DEATH VALLEY SCENIC

BYWAY, CA SR-190

EXISTING FIBER

OPTIC LINE

8'' HDPE DR 11

WATER MAIN

8'' HDPE DR 11

WATER MAIN

A C3.12

A C3.12

4" PRESSURE

REDUCING VALVE

RPZ BACKFLOW

PREVENTER

3' MIN. SEPARATION BETWEEN

WATER AND FIBER OPTIC

A C3.19

B C3.20

6" 45° BEND

8" X 6" TEE

CONTRACTOR TO TIE INTO

EXISTING WATER MAIN AT TEE.

CONTRACTOR TO VERIFY SIZE,

DEPTH, AND MATERIAL OF

EXISTING WATER MAIN

WATER METER

B

C3.18

CAP AND ABANDON

EXISTING WATER MAIN

AutoCAD SHX Text 1/12/26 16:40 KELLY.KERO F:\7194.05 DEVA WATER AND WASTEWATER SYSTEM REHAB\DRAWINGS\DWG\CIVIL\5 SHEET PRODUCTION\4_DEVA FC W_SOUTH

Kelly.Kero Polygon

Kelly.Kero Polygon

Kelly.Kero Text Box

Kelly.Kero Text Box

Kelly.Kero Cloud

Kelly.Kero Cloud

Kelly.Kero Pen

Kelly.Kero Pen

Kelly.Kero PolyLine

Sheets and Views
56 P&P - (9)

File details come from the government source that posted it. Updated .