B09_Amd10_-_B08_Attach4_-_DetailedContractPriceSchedule_0010.xlsx
XLSX spreadsheet 30 KB Posted
- Solicitation number
- 140P2025R0082
About this file
This is a Detailed Contract Price Schedule worksheet for RFP 140P2025R0082, DEVA 318717, detailing pricing for the rehabilitation of Furnace Creek and Cow Creek Water and Wastewater Treatment Systems at Death Valley National Park. The document serves as a pricing template with 27 Contract Line Items (CLINs) organized into 18 base CLINs and 9 optional CLINs, all currently showing $0.00 unit prices and extended totals pending contractor submission.
The base CLINs (1-18) encompass major infrastructure components including reverse osmosis (RO) building construction, pipe vaults, lagoons, headworks, sitework, demolition, water systems, wastewater systems, lift stations, pool filtration, and force mains across both creek locations, plus interconnecting wastewater and drainage infrastructure. Optional CLINs (19-27) cover additional water and wastewater piping extensions to various campgrounds and facilities. The document includes detailed pricing breakouts by labor, equipment, and materials for each CLIN, and supplemental worksheets specifying estimated quantities for piping work (138,981 linear feet total across base and options) and spoils management (excavated material disposal ranging from 136 to 30,114 cubic yards by CLIN). Pricing components include various installation methods such as trenched piping, directional drilling, cured-in-place pipe (CIPP) rehabilitation, appurtenances, and off-site or mixing table disposal of excavated materials. This template requires contractors to populate unit prices and extended totals for all line items as part of their proposal response.
View the file
Other files
Show 40 more
Latest 50 of 109 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section B DEVA 318717 - RFP No. 140P2025R0082 Attachment 4 - Detailed Contract Price Schedule Worksheet
Contract Line Item Number
| (CLIN) | CLIN Description | Quantity | Unit of Measure | Unit Price | Extended Total | |
| 1 | Furnace Creek RO Building | 1 | Lump Sum | $0.00 | ||
| 2 | Furnace Creek Pipe Vault | 1 | Lump Sum | $0.00 | ||
| 3 | Furnace Creek Lagoon & Headworks | 1 | Lump Sum | $0.00 | ||
| 4 | Furnace Creek Sitework | 1 | Lump Sum | $0.00 | ||
| 5 | Furnace Creek Demolition | 1 | Lump Sum | $0.00 | ||
| 6 | Furance Creek - Water Systems | 1 | Lump Sum | $0.00 | ||
| 7 | Furance Creek - Wastewater Systems | 1 | Lump Sum | $0.00 | ||
| 8 | Cow Creek RO Treatment Building | 1 | Lump Sum | $0.00 | ||
| 9 | Cow Creek Lift Station | 1 | Lump Sum | $0.00 | ||
| 10 | Cow Creek Pool Filtration | 1 | Lump Sum | $0.00 | ||
| 11 | Cow Creek Sitework | 1 | Lump Sum | $0.00 | ||
| 12 | Cow Creek Demolition | 1 | Lump Sum | $0.00 | ||
| 13 | Cow Creek - Water Systems | 1 | Lump Sum | $0.00 | ||
| 14 | Cow Creek - Wastewater Systems | 1 | Lump Sum | $0.00 | ||
| 15 | Coyote Loop Wastewater Gravity Line | 1 | Lump Sum | $0.00 | ||
| 16 | Texas Springs Drainage Channel | 1 | Lump Sum | $0.00 | ||
| 17 | Old Ghost Road Wastewater | 1 | Lump Sum | $0.00 | ||
| 18 | Wastewater Force Main from Cow Creek Lift Station to Furnace Creek System at HWY 190 | 1 | Lump Sum | $0.00 | ||
| TOTAL BASE PRICE (CLINS 1-18) | $0.00 | |||||
| 19 | OPTION A - Cow Creek Water Piping Coyote Loop | 1 | Lump Sum | $0.00 | ||
| 20 | OPTION B - Furnace Creek Water Piping at Furnace Creek Camp Ground | 1 | Lump Sum | $0.00 | ||
| 21 | OPTION C - Furnace Creek Water Piping RO to Texas Springs Camp Ground | 1 | Lump Sum | $0.00 | ||
| 22 | OPTION D - Wastewater from Cow Creek RO Building to Upper Housing | 1 | Lump Sum | $0.00 | ||
| 23 | OPTION E - Furnace Creek Wastewater at Sunset Camp Ground | 1 | Lump Sum | $0.00 | ||
| 24 | OPTION F - Furnace Creek Water Piping at Sunset Camp Ground | 1 | Lump Sum | $0.00 | ||
| 25 | OPTION G - Furnace Creek Water Piping from FC Wells to RO Building | 1 | Lump Sum | $0.00 | ||
| 26 | OPTION H - Water Reservoir Improvements | 1 | Lump Sum | $0.00 | ||
| 27 | OPTION I - Cow Creek Wastewater at Cow Creek Administration | 1 | Lump Sum | $0.00 | ||
| TOTAL OPTIONS PRICE (CLINS 19-27) | $0.00 | |||||
| OVERALL TOTAL PRICE (BASE CLINS 1-18 + OPTION CLINS 19-27) | $0.00 |
CLIN Breakout DEVA 318717 - RFP No. 140P2025R0082 Attachment 4 - Detailed Contract Price Schedule Worksheet
Contract Line Item Number
| (CLIN) | CLIN Description | Total Labor | Total Equipment | Total Materials | Extended Total | ||
| 1 | Furnace Creek RO Building | ||||||
| 2 | Furnace Creek Pipe Vault | ||||||
| 3 | Furnace Creek Lagoon & Headworks | ||||||
| 4 | Furnace Creek Sitework | ||||||
| 5 | Furnace Creek Demolition | ||||||
| 6 | Furance Creek - Water Systems | ||||||
| 7 | Furance Creek - Wastewater Systems | ||||||
| 8 | Cow Creek RO Treatment Building | ||||||
| 9 | Cow Creek Lift Station | ||||||
| 10 | Cow Creek Pool Filtration | ||||||
| 11 | Cow Creek Sitework | ||||||
| 12 | Cow Creek Demolition | ||||||
| 13 | Cow Creek - Water Systems | ||||||
| 14 | Cow Creek - Wastewater Systems | ||||||
| 15 | Coyote Loop Wastewater Gravity Line | ||||||
| 16 | Texas Springs Drainage Channel | ||||||
| 17 | Old Ghost Road Wastewater | ||||||
| 18 | Wastewater Force Main from Cow Creek Lift Station to Furnace Creek System at HWY 190 | ||||||
| TOTAL BASE PRICE (CLINS 1-18) | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 19 | OPTION A - Cow Creek Water Piping Coyote Loop | ||||||
| 20 | OPTION B - Furnace Creek Water Piping at Furnace Creek Camp Ground | ||||||
| 21 | OPTION C - Furnace Creek Water Piping RO to Texas Springs Camp Ground | ||||||
| 22 | OPTION D - Wastewater from Cow Creek RO Building to Upper Housing | ||||||
| 23 | OPTION E - Furnace Creek Wastewater at Sunset Camp Ground | ||||||
| 24 | OPTION F - Furnace Creek Water Piping at Sunset Camp Ground | ||||||
| 25 | OPTION G - Furnace Creek Water Piping from FC Wells to RO Building | ||||||
| 26 | OPTION H - Water Reservoir Improvements | ||||||
| 27 | OPTION I - Cow Creek Wastewater at Cow Creek Administration | ||||||
| TOTAL OPTIONS PRICE (CLINS 19-27) | $0.00 | $0.00 | $0.00 | $0.00 | |||
| OVERALL TOTAL PRICE (BASE CLINS 1-18 + OPTION CLINS 19-27) | $0.00 | $0.00 | $0.00 | $0.00 |
Pricing Info - Piping_Amd10 NA
| CLIN | Description | Estimated Quantity | Unit of Measure | Unit Rate | Extended Total | |
| 6 | Furnace Creek Water - Piping in Trenches | 18430 | LF | $0.00 | ||
| Furnace Creek Water - Directional Drilling | 1594 | LF | $0.00 | Updated | ||
| Furnace Creek Water - Appurtenances | 52 | Each | $0.00 | |||
| Furnace Creek Water Piping at CA 190 | 6062 | LF | $0.00 | |||
| 7 | Furnace Creek Wastewater - Piping in Trenches | 9772 | LF | $0.00 | ||
| Furnace Creek Wastewater - CIPP | 2531 | LF | $0.00 | |||
| Furnace Creek Wastewater - Appurtenances | 60 | Each | $0.00 | |||
| Wastewater at Furnace Creek Camp Ground | 3058 | LF | $0.00 | |||
| 13 | Cow Creek Water - Piping in Trenches | 33605 | LF | $0.00 | ||
| Cow Creek Water - Directional Drilling | 38 | LF | $0.00 | Added | ||
| Cow Creek Water - Appurtenances | 96 | Each | $0.00 | |||
| 14 | Cow Creek Wastewater - Piping in Trenches | 2020 | LF | $0.00 | ||
| Cow Creek Wastewater - CIPP | 716 | LF | $0.00 | |||
| Cow Creek Wastewater - Appurtenances | 21 | Each | $0.00 | |||
| 15 | Coyote Loop Wastewater Gravity Line | 1364 | LF | $0.00 | ||
| 16 | Texas Springs Drainage Channel | 2977 | LF | $0.00 | ||
| 17 | Old Ghost Road Wastewater | 7089 | LF | $0.00 | ||
| 18 | Wastewater Force Main from Cow Creek Lift Station to Furnace Creek System at HWY 190 | 15598 | LF | $0.00 | ||
| 19 | OPTION A - Cow Creek Water Piping Coyote Loop | 2268 | LF | $0.00 | ||
| 20 | OPTION B - Furnace Creek Water Piping at Furnace Creek Camp Ground | 6895 | LF | $0.00 | ||
| 21 | OPTION C - Furnace Creek Water Piping RO to Texas Springs Camp Ground | 3878 | LF | $0.00 | ||
| 22 | OPTION D - Wastewater from Cow Creek RO Building to Upper Housing | 3045 | LF | $0.00 | ||
| 23 | OPTION E - Furnace Creek Wastewater at Sunset Camp Ground | 1547 | LF | $0.00 | ||
| 24 | OPTION F - Furnace Creek Water Piping at Sunset Camp Ground | 1611 | LF | $0.00 | ||
| 25 | OPTION G - Furnace Creek Water Piping from FC Wells to RO Building | 7416 | LF | $0.00 | ||
| 27 | OPTION I - Cow Creek Wastewater at Cow Creek Administration | 7467 | LF | $0.00 | ||
| Overall Total Estimated Piping Quantity | 138981 | LF | $0.00 | Updated |
Pricing Info - Spoils_Amd7
| CLIN | Description | Estimated Quantity | Unit of Measure | Notes | |||||
| Base | 3 | Dispose of excavated material off site | 3 | CY | Export Offsite | 136 | CY | ||
| Dispose of excavated material off site | 10 | CY | Export to Mixing Table (Base) | 30114 | CY | 30000 | Quantity assumes 6-foot trench width & 16-inches of soil not put back into the trench. | ||
| Dispose of excavated material at mixing table site | 111 | CY | Export to Mixing Table (Options) | 10682 | CY | ||||
| 6 | Dispose of excavated material at mixing table site | 6307 | CY | ||||||
| 9 | Dispose of excavated material at mixing table site | 3066 | CY | ||||||
| 12 | Dispose of excavated material off site | 7 | CY | Unsuitable for Backfill | 602.28 | CY | |||
| 13 | Dispose of excavated material off site | 2 | CY | Surplus to Trench or Structure Backfill Requirements | 29210.58 | CY | 29400 | (315 ft x 315 ft x 8 ft high area) | |
| Dispose of excavated material off site | 2 | CY | Contaminated or Restricted for Reuse | 301.14 | CY | ||||
| Dispose of excavated material off site | 1 | CY | Vegetation or Brush Requiring Removal | ?? | ?? | ||||
| 17 | Dispose of excavated material at mixing table site | 11492 | CY | ||||||
| 19 | Dispose of excavated material at mixing table site | 633 | CY | ||||||
| 22 | Dispose of excavated material at mixing table site | 319 | CY | Rock Excavation | 700 | CY | 733.3333333333 | ||
| 24 | Dispose of excavated material at mixing table site | 1833 | CY | ||||||
| 25 | Dispose of excavated material at mixing table site | 423 | CY | ||||||
| 26 | Dispose of excavated material at mixing table site | 4448 | CY | ||||||
| 27 | Dispose of excavated material at mixing table site | 1482 | CY | ||||||
| Opt. A | 28 | Dispose of excavated material at mixing table site | 776 | CY | |||||
| Opt. B | 29 | Dispose of excavated material at mixing table site | 2360 | CY | |||||
| Opt. C | 30 | Dispose of excavated material at mixing table site | 1260 | CY | |||||
| Opt. D | 31 | Dispose of excavated material at mixing table site | 372 | CY | |||||
| Opt. E | 32 | Dispose of excavated material at mixing table site | 241 | CY | |||||
| Opt. F | 33 | Dispose of excavated material at mixing table site | 551 | CY | |||||
| Opt. G | 34 | Dispose of excavated material at mixing table site | 2538 | CY | |||||
| Opt. I | 36 | Dispose of excavated material at mixing table site | 2584 | CY |
File details come from the government source that posted it. Updated .