B09_Amd10_-_B08_Attach4_-_DetailedContractPriceSchedule_0010.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
DEVA 318717 - Rehab Furnace & Cow Creeks WTP/WWTP
Solicitation number
140P2025R0082
Issued by

About this file

This is a Detailed Contract Price Schedule worksheet for RFP 140P2025R0082, DEVA 318717, detailing pricing for the rehabilitation of Furnace Creek and Cow Creek Water and Wastewater Treatment Systems at Death Valley National Park. The document serves as a pricing template with 27 Contract Line Items (CLINs) organized into 18 base CLINs and 9 optional CLINs, all currently showing $0.00 unit prices and extended totals pending contractor submission.

The base CLINs (1-18) encompass major infrastructure components including reverse osmosis (RO) building construction, pipe vaults, lagoons, headworks, sitework, demolition, water systems, wastewater systems, lift stations, pool filtration, and force mains across both creek locations, plus interconnecting wastewater and drainage infrastructure. Optional CLINs (19-27) cover additional water and wastewater piping extensions to various campgrounds and facilities. The document includes detailed pricing breakouts by labor, equipment, and materials for each CLIN, and supplemental worksheets specifying estimated quantities for piping work (138,981 linear feet total across base and options) and spoils management (excavated material disposal ranging from 136 to 30,114 cubic yards by CLIN). Pricing components include various installation methods such as trenched piping, directional drilling, cured-in-place pipe (CIPP) rehabilitation, appurtenances, and off-site or mixing table disposal of excavated materials. This template requires contractors to populate unit prices and extended totals for all line items as part of their proposal response.

View the file

Other files

File Type Posted
B09_Amd11_-_B08_Attach3_-_WD_CA20260020_Mod2_0011.pdf PDF
Sol_140P2025R0082_Amd_0011.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_42_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_38_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_40_Jan2026_0010.pdf PDF
B09_Amd10_QR_Tracker_-_DEVA_318717_Final_0010.xlsx XLSX spreadsheet
B09_Amd10_-_QR55_Attach_Drawing_01-C4_39_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_00-C8_27_Jan2026_0010.pdf PDF
B09_Amd10_-_QR86_Attach_Drawing_C1_40_0010.pdf PDF
B09_Amd10_-_Drawing_G1_22_0010.pdf PDF
B09_Amd10_-_QR86_Attach_Drawing_C1_40B_0010.pdf PDF
Sol_140P2025R0082_Amd_0010.pdf PDF
B09_Amd10_-_Drawing_G1_2_0010.pdf PDF
B09_Amd10_-_Drawing_Coversheet_00_DEVA_318717_Jan2026x_0010.pdf PDF
B09_Amd10_-_Drawing_G1_21_0010.pdf PDF
Sol_140P2025R0082_Amd_0009.pdf PDF
B09_Amd8_-_Drawing_02-C5_29_Jan2026_0008.pdf PDF
B09_Amd8_-_Spec_33_14_19_-_VALVES___HYDRANTS_FOR_WATER_UTILITY_SERVICE_0008.pdf PDF
B09_Amd8_-_Drawing_02-G1_16_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_08_33_22_-_ALUMINUM_ROLLING_OVERHEAD_DOORS_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_29_Jan2026_0008.pdf PDF
B09_Amd8_-_QR22_Attach_Drawing_00-C7_1_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C5_25_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_00-C8_30_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_01-C4_42_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_01-C3_1_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_20_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_32_00_-_WASTEWATER_PUMPING_STATIONS_0008.pdf PDF
B09_Amd8_-_Spec_33_31_11_-_GRAVITY_SEWER_PIPELINE___MANHOLE_INSTALLATION_0008.pdf PDF
B09_Amd8_QR_Tracker_-_DEVA_318717_0008.xlsx XLSX spreadsheet
B09_Amd8_-_Drawing_Coversheet_00_DEVA_318717_Jan2026_0008.pdf PDF
Sol_140P2025R0082_Amd_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_31_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C6_7_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_15_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-G1_2_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C7_5_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_11_13_-_POTABLE_WATER_SUPPLY_WELLS_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_18_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_02-C5_33_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_42_Jan2026_0008.pdf PDF
B09_Amd8_-_QR56_Attach_Drawing_02-C2_20_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_31_05_-_MANHOLE_LINING___REHABILITATION_0008.pdf PDF
B09_Amd8_-_Drawing_01-G1_15_Jan2026_0008.pdf PDF
B09_Amd8_-_QR56_Attach_Drawing_02-C2_18_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_67_Jan2026_0008.pdf PDF
B09_Amd8_-_Spec_46_33_11_-_CHEMICAL_FEED_-_LIQUID_SYSTEMS_0008.pdf PDF
B09_Amd8_-_Drawing_02-C2_22_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-X1_2_Jan2026_0008.pdf PDF
B09_Amd8_-_QR22_Attach_Drawing_02-C5_64_Jan2026_0008.pdf PDF
Show 40 more

Latest 50 of 109 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section B DEVA 318717 - RFP No. 140P2025R0082 Attachment 4 - Detailed Contract Price Schedule Worksheet

Contract Line Item Number

(CLIN)CLIN DescriptionQuantityUnit of MeasureUnit PriceExtended Total
1Furnace Creek RO Building1Lump Sum$0.00
2Furnace Creek Pipe Vault1Lump Sum$0.00
3Furnace Creek Lagoon & Headworks1Lump Sum$0.00
4Furnace Creek Sitework1Lump Sum$0.00
5Furnace Creek Demolition1Lump Sum$0.00
6Furance Creek - Water Systems1Lump Sum$0.00
7Furance Creek - Wastewater Systems1Lump Sum$0.00
8Cow Creek RO Treatment Building1Lump Sum$0.00
9Cow Creek Lift Station1Lump Sum$0.00
10Cow Creek Pool Filtration1Lump Sum$0.00
11Cow Creek Sitework1Lump Sum$0.00
12Cow Creek Demolition1Lump Sum$0.00
13Cow Creek - Water Systems1Lump Sum$0.00
14Cow Creek - Wastewater Systems1Lump Sum$0.00
15Coyote Loop Wastewater Gravity Line1Lump Sum$0.00
16Texas Springs Drainage Channel1Lump Sum$0.00
17Old Ghost Road Wastewater1Lump Sum$0.00
18Wastewater Force Main from Cow Creek Lift Station to Furnace Creek System at HWY 1901Lump Sum$0.00
TOTAL BASE PRICE (CLINS 1-18)$0.00
19OPTION A - Cow Creek Water Piping Coyote Loop1Lump Sum$0.00
20OPTION B - Furnace Creek Water Piping at Furnace Creek Camp Ground1Lump Sum$0.00
21OPTION C - Furnace Creek Water Piping RO to Texas Springs Camp Ground1Lump Sum$0.00
22OPTION D - Wastewater from Cow Creek RO Building to Upper Housing1Lump Sum$0.00
23OPTION E - Furnace Creek Wastewater at Sunset Camp Ground1Lump Sum$0.00
24OPTION F - Furnace Creek Water Piping at Sunset Camp Ground1Lump Sum$0.00
25OPTION G - Furnace Creek Water Piping from FC Wells to RO Building1Lump Sum$0.00
26OPTION H - Water Reservoir Improvements1Lump Sum$0.00
27OPTION I - Cow Creek Wastewater at Cow Creek Administration1Lump Sum$0.00
TOTAL OPTIONS PRICE (CLINS 19-27)$0.00
OVERALL TOTAL PRICE (BASE CLINS 1-18 + OPTION CLINS 19-27)$0.00

CLIN Breakout DEVA 318717 - RFP No. 140P2025R0082 Attachment 4 - Detailed Contract Price Schedule Worksheet

Contract Line Item Number

(CLIN)CLIN DescriptionTotal LaborTotal EquipmentTotal MaterialsExtended Total
1Furnace Creek RO Building
2Furnace Creek Pipe Vault
3Furnace Creek Lagoon & Headworks
4Furnace Creek Sitework
5Furnace Creek Demolition
6Furance Creek - Water Systems
7Furance Creek - Wastewater Systems
8Cow Creek RO Treatment Building
9Cow Creek Lift Station
10Cow Creek Pool Filtration
11Cow Creek Sitework
12Cow Creek Demolition
13Cow Creek - Water Systems
14Cow Creek - Wastewater Systems
15Coyote Loop Wastewater Gravity Line
16Texas Springs Drainage Channel
17Old Ghost Road Wastewater
18Wastewater Force Main from Cow Creek Lift Station to Furnace Creek System at HWY 190
TOTAL BASE PRICE (CLINS 1-18)$0.00$0.00$0.00$0.00
19OPTION A - Cow Creek Water Piping Coyote Loop
20OPTION B - Furnace Creek Water Piping at Furnace Creek Camp Ground
21OPTION C - Furnace Creek Water Piping RO to Texas Springs Camp Ground
22OPTION D - Wastewater from Cow Creek RO Building to Upper Housing
23OPTION E - Furnace Creek Wastewater at Sunset Camp Ground
24OPTION F - Furnace Creek Water Piping at Sunset Camp Ground
25OPTION G - Furnace Creek Water Piping from FC Wells to RO Building
26OPTION H - Water Reservoir Improvements
27OPTION I - Cow Creek Wastewater at Cow Creek Administration
TOTAL OPTIONS PRICE (CLINS 19-27)$0.00$0.00$0.00$0.00
OVERALL TOTAL PRICE (BASE CLINS 1-18 + OPTION CLINS 19-27)$0.00$0.00$0.00$0.00

Pricing Info - Piping_Amd10 NA

CLINDescriptionEstimated QuantityUnit of MeasureUnit RateExtended Total
6Furnace Creek Water - Piping in Trenches18430LF$0.00
Furnace Creek Water - Directional Drilling1594LF$0.00Updated
Furnace Creek Water - Appurtenances52Each$0.00
Furnace Creek Water Piping at CA 1906062LF$0.00
7Furnace Creek Wastewater - Piping in Trenches9772LF$0.00
Furnace Creek Wastewater - CIPP2531LF$0.00
Furnace Creek Wastewater - Appurtenances60Each$0.00
Wastewater at Furnace Creek Camp Ground3058LF$0.00
13Cow Creek Water - Piping in Trenches33605LF$0.00
Cow Creek Water - Directional Drilling38LF$0.00Added
Cow Creek Water - Appurtenances96Each$0.00
14Cow Creek Wastewater - Piping in Trenches2020LF$0.00
Cow Creek Wastewater - CIPP716LF$0.00
Cow Creek Wastewater - Appurtenances21Each$0.00
15Coyote Loop Wastewater Gravity Line1364LF$0.00
16Texas Springs Drainage Channel2977LF$0.00
17Old Ghost Road Wastewater7089LF$0.00
18Wastewater Force Main from Cow Creek Lift Station to Furnace Creek System at HWY 19015598LF$0.00
19OPTION A - Cow Creek Water Piping Coyote Loop2268LF$0.00
20OPTION B - Furnace Creek Water Piping at Furnace Creek Camp Ground6895LF$0.00
21OPTION C - Furnace Creek Water Piping RO to Texas Springs Camp Ground3878LF$0.00
22OPTION D - Wastewater from Cow Creek RO Building to Upper Housing3045LF$0.00
23OPTION E - Furnace Creek Wastewater at Sunset Camp Ground1547LF$0.00
24OPTION F - Furnace Creek Water Piping at Sunset Camp Ground1611LF$0.00
25OPTION G - Furnace Creek Water Piping from FC Wells to RO Building7416LF$0.00
27OPTION I - Cow Creek Wastewater at Cow Creek Administration7467LF$0.00
Overall Total Estimated Piping Quantity138981LF$0.00Updated

Pricing Info - Spoils_Amd7

CLINDescriptionEstimated QuantityUnit of MeasureNotes
Base3Dispose of excavated material off site3CYExport Offsite136CY
Dispose of excavated material off site10CYExport to Mixing Table (Base)30114CY30000Quantity assumes 6-foot trench width & 16-inches of soil not put back into the trench.
Dispose of excavated material at mixing table site111CYExport to Mixing Table (Options)10682CY
6Dispose of excavated material at mixing table site6307CY
9Dispose of excavated material at mixing table site3066CY
12Dispose of excavated material off site7CYUnsuitable for Backfill602.28CY
13Dispose of excavated material off site2CYSurplus to Trench or Structure Backfill Requirements29210.58CY29400(315 ft x 315 ft x 8 ft high area)
Dispose of excavated material off site2CYContaminated or Restricted for Reuse301.14CY
Dispose of excavated material off site1CYVegetation or Brush Requiring Removal????
17Dispose of excavated material at mixing table site11492CY
19Dispose of excavated material at mixing table site633CY
22Dispose of excavated material at mixing table site319CYRock Excavation700CY733.3333333333
24Dispose of excavated material at mixing table site1833CY
25Dispose of excavated material at mixing table site423CY
26Dispose of excavated material at mixing table site4448CY
27Dispose of excavated material at mixing table site1482CY
Opt. A28Dispose of excavated material at mixing table site776CY
Opt. B29Dispose of excavated material at mixing table site2360CY
Opt. C30Dispose of excavated material at mixing table site1260CY
Opt. D31Dispose of excavated material at mixing table site372CY
Opt. E32Dispose of excavated material at mixing table site241CY
Opt. F33Dispose of excavated material at mixing table site551CY
Opt. G34Dispose of excavated material at mixing table site2538CY
Opt. I36Dispose of excavated material at mixing table site2584CY