B09_Amd10_-_QR86_Attach_Drawing_C1_40B_0010.pdf

PDF 1 MB Posted

Attached to
DEVA 318717 - Rehab Furnace & Cow Creeks WTP/WWTP
Solicitation number
140P2025R0082
Issued by

About this file

This is a technical drawing set for the Furnace Creek Water Plan & Profile, specifically documenting an additional Xanterra water connection project at Death Valley National Park. The drawing is sheet C1.40B of a larger set (drawing number 01-318717) and was designed by L. Graef with technical review by M. Whelehon, dated August 20, 2026.

The project involves installing an 8-inch HDPE DR 11 water main to provide an additional water connection to Xanterra facilities. Key components shown include: an 8-inch HDPE tee at station FW 500+00.00 with top of pipe elevation of -1.37 feet; an 8-inch gate valve at station FW 500+04.17 with elevation -1.40 feet; an 8-inch water meter at station FW 500+08.52 with elevation -1.44 feet; and a connection tie-in to an existing valve at station FW 502+77.58 with elevation -3.40 feet. The water main spans approximately 502.78 feet and requires a minimum cover of 2.50 feet with an actual cover of 3.31 feet shown. The plan notes requirements to protect an in-place existing backflow preventor, cap and abandon the existing water main, and coordinate with the contracting officer. The drawing includes both plan and profile views with detailed elevation information and references to related sheets C1.40 and C3.18.

View the file

Other files

File Type Posted
B09_Amd10_-_QR55_Attach_Drawing_00-C8_27_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_38_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_42_Jan2026_0010.pdf PDF
Sol_140P2025R0082_Amd_0009.pdf PDF
B09_Amd8_-_Spec_33_14_19_-_VALVES___HYDRANTS_FOR_WATER_UTILITY_SERVICE_0008.pdf PDF
B09_Amd8_-_Drawing_02-C6_15_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_02-G1_16_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-C7_2_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-C8_30_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_01-C3_6_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_01-X1_0_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C3_8_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_02-C5_25_Jan2026_0008.pdf PDF
B09_Amd8_-_QR56_Attach_Drawing_02-C2_18_Dec2025_0008.pdf PDF
B09_Amd8_-_QR35_Attach_Spec015000Addendum_-_TempFacilitiesControls_0008.pdf PDF
B09_Amd8_-_QR22_Attach_Drawing_02-C5_48_Jan2026_0008.pdf PDF
B09_Amd8_-_Spec_33_11_13_-_POTABLE_WATER_SUPPLY_WELLS_0008.pdf PDF
B09_Amd8_-_Spec_08_33_22_-_ALUMINUM_ROLLING_OVERHEAD_DOORS_0008.pdf PDF
B09_Amd8_-_Spec_46_33_11_-_CHEMICAL_FEED_-_LIQUID_SYSTEMS_0008.pdf PDF
B09_Amd8_-_Drawing_02-X1_1_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C7_5_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-C_19_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_15_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_18_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-G1_2_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_22_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_67_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_01-C4_42_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C2_22_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C6_7_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-X1_2_Jan2026_0008.pdf PDF
B09_Amd8_-_QR22_Attach_Drawing_02-C5_64_Jan2026_0008.pdf PDF
B09_Amd7_-_B08_Attach4_-_DetailedContractPriceSchedule_0007.xlsx XLSX spreadsheet
B09_Amd6_-_QR_No36_Attach5_-_DEVA_CCTV_Report_11_03_22_0006.pdf PDF
B09_Amd6_-_QR_No36_Attach1_-_06_05_2023_DEVA_0006.pdf PDF
B09_Amd5_PreProposal_Agenda_DEVA_318717_0005.pdf PDF
B09_Amd4_Spec015000Addendum_-_CO_FieldOffice_DEVA_318717_0004.pdf PDF
Sol_140P2025R0082_Amd_0002.pdf PDF
B09_Amd1_-_Brand_Name_J_A_DEVA_318717_Redacted_0001.pdf PDF
B08_Attach2d_-_Drawings_DEVA_318717_Jan2025.pdf PDF
B08_Attach2e_-_Drawings_DEVA_318717_Jan2025.pdf PDF
B08_Attach4_-_DetailedContractPriceSchedule.xlsx XLSX spreadsheet
B08_Attach5_-_Small_Business_SubPlan.docx DOCX document
B08_Attach6_-_PEQ.docx DOCX document
B08_Attach2a_-_Drawings_DEVA_318717_Jan2025.pdf PDF
B08_Attach3_-_WD_CA20250020_Mod15.pdf PDF
B08_Attach7_-_PPQ.docx DOCX document
B08_Attach8_-_General_References.doc DOC document
B08_Attach2b_-_Drawings_DEVA_318717_Jan2025.pdf PDF
B08_Solicitation_Body_-_v13_Sept2025_Final.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EW(B)

EW(B)W

V

W V

W V

S

EWptbl(D)

EW

ptbl(D

EW

ptbl(D

EW

ptbl(D

EW

ptbl(D

EWnonptbl(D)EWnonptbl(D)EWnonptbl(D)

EW

nonptbl(D

EW

nonptbl(D

EW

nonptbl(D

EW

nonptbl(D

EW

nonptbl(D

EWnonptbl(D) EWnonptbl(D)

EWnonptbl(D)

EW

nonptbl(D)

EW

nonptbl(D)

FO(D)

FO(D)

FO

(D

FO

(D

FO

(D

FO

(D

FO

(D

FO

(D

FO

(D

FO

(D

FO

(D

FO

(D

FO

(D

FO

(D

FO

(D

W

8''

W 8''

W 8''

FO

(D

FO

(D

FO

(D

FO

(D

FO

(D

FO

(D

FO

(D

FO

(D

WM

FW 502+78

FW 500+00

FW 501+00

FW 502+00

W 8'' W 8''

W 8'' W 8''

G V

G V

GV

8'' HDPE TEE

STA:FW 500+00.00

8'' GATE VALVE

STA:FW 500+04.17

8" WATER METER

STA:FW 500+08.52

TIE INTO EXISTING VALVE

STA:FW 502+77.58

-30

-20

-10

-30

-20

-10

500+00

4.

2.

-1 .5

2.

-1 .6

2.

-1 .8

3.

-1 .9

501+00

1.

-2 .1

1.

-2 .2

2.

-2 .4

2.

-2 .5

2.

-2 .6

502+00

2.

-2 .8

2.

-2 .9

3.

-3 .1

3.

-3 .2

502+77.58

4.

-3 .4

ST

A:

FW

+0

0.

T.

O

.P . E

LE

V:

-1 .3

8" H

D

PE

T

EE

ST

A:

FW

+0

4.

T.

O

.P . E

LE

V:

-1 .4

8" G

AT

E

VA

LV

E

ST

A:

FW

+0

8.

T.

O

.P . E

LE

V:

-1 .4

8" W

AT

ER

M

ET

ER

ST

A:

FW

+7

7.

T.

O

.P . E

LE

V:

-3 .4

TI

E

IN

TO

E

XI

ST

IN

G V

AL

VE

EW(B)

EW(B)

EW(B)

EW(B)

EW

(B)

EW

(B)

EW

(B)

EW(B)

EW(B)

EW(B)

EW(B)

EW

(B)

WV

WM

WV

WV

WV

MH

S

ES(D)

ES(D)

ES(D)

ES(D)

ES(D)

ES(D)

ES(D)

ES(D)

ES(D)

ES(D)

ES(D)

ES(D) ES(D)

ICV

ICV

ICV

ICV

ICV

ICV

ICV

T

S

WV

EWptbl(D) EWptbl(D) EWptbl(D)

EW

ptbl(D

EW

ptbl(D

EW

ptbl(D

EWptbl(D)

EW

ptbl(D)

EWptbl(D)

EWptbl(D)

EW

ptbl(D)

EW

ptbl(D

EWptbl(D)

EWptbl(D)

EWptbl(D)

EWptbl(D)

EWptbl(D)

EWnonptbl(D)

EWnonptbl(D)

EWnonptbl(D) EWnonptbl(D)

EWnonptbl(D)

EWnonptbl(D)

EW

nonptbl(D)

EW

nonptbl(D

EW

nonptbl(D

EWnonptbl(D)

EWnonptbl(D) EWnonptbl(D)

EWnonptbl(D) EWnonptbl(D)

EWnonptbl(D)

EWnonptbl(D)

EWnonptbl(D)

EWnonptbl(D)

EWnonptbl(D)

EW

nonptbl(D

EW

nonptbl(D)

EW

nonptbl(D)

EWnonptbl(D)

EWnonptbl(D)

EW

nonptbl(D

EW

nonptbl(D

EW

nonptbl(D

EWnonptbl(D)

EWnonptbl(D)

EWnonptbl(D)

EW

no np tb l(D

EW

no np tb l(D

EIRR

EIRR

EIRR

WM

WM

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D) FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

-2

-2

-2

-2

-2

-24 -23

-20

-15

-10

-22 -21 -19 -18 -17 -16 -14 -13 -12 -11

W 8''

W 8''

W 8''

W 8''GV

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

FO(D) FO(D)

FO(D)

FO(D)

FO(D)

FO(D)

W M

W

GV

GV

G V

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

FURNACE CREEK WATER

PLAN & PROFILE

ADDITIONAL XANTERRA WATER CONNECTION

178069

## 513

L. GRAEF

L. GRAEF

M. WHELEHON

1.28.2026

DEATH VALLEY

NATIONAL PARK

318717 01-

C1.40B

HORIZ.

VERT.

PLAN - ADDITIONAL XANTERRA WATER CONNECTION

PROFILE - ADDITIONAL XANTERRA WATER CONNECTION 20 0 20 40

SCALE OF FEET

10 0 10 20

KEY MAP

NTS

3.31' COVER

(MIN COVER = 2.50')

8'' HDPE DR 11

WATER MAIN

8'' HDPE DR 11

WATER MAIN

APPROXIMATE EXISTING

GROUND SURFACE

PROTECT IN-PLACE

EXISTING BACKFLOW

PREVENTOR

COORDINATE WITH

CONTRACTING OFFICER

SEE SHEET C1.40

XANTERRA ADDITIONAL WATER CONNECTION OVERVIEW

PROTECT IN-PLACE EXISTING

BACKFLOW PREVENTOR

CAP AND ABANDON

EXISTING WATER MAIN

CAP AND ABANDON

EXISTING WATER MAIN

PROTECT IN-PLACE EXISTING

BACKFLOW PREVENTOR

EXISTING WATER MAIN

CA-190

TO TIMBISHA

VILLAGE

SEE PLAN AND

PROFILE, THIS SHEET

PROPOSED WATER MAIN,

SEE SHEETS C1.40-C1.42

B C3.18

A C3.12

File details come from the government source that posted it. Updated .