B09_Amd8_-_Drawing_02-X1_1_Jan2026_0008.pdf

PDF 609 KB Posted

Attached to
DEVA 318717 - Rehab Furnace & Cow Creeks WTP/WWTP
Solicitation number
140P2025R0082
Issued by

About this file

This is a Demolition Plan for the Cow Creek project at Death Valley National Park. The plan outlines the removal and restoration of existing infrastructure and structures during construction of new wastewater and water treatment systems. Key demolition activities include: removal of the existing Cow Creek Lift Station building (with concrete pad and valve vault), abandonment of the Coyote Loop Lift Station manhole in place, demolition of the existing RO Treatment Building, removal of above-grade pressure relief valves (PRVs), extraction of the existing air monitoring trailer, removal of two trees, and demolition of the existing pool building. All removed trees and vegetation removal must be coordinated with the NPS Botanist per Specification Section 32 01 01.

The plan specifies that existing lift stations and treatment buildings must remain in service during construction until new systems are operational and service is switched over. The contractor must restore all demolition areas to natural grade and coordinate all removals with the Contracting Officer. The plan permits alternative demolition approaches subject to Contracting Officer approval. Additional requirements include reusing all existing fire hydrants, removing and abandoning water and sewer pipes encountered during installation work, and managing trench disturbance areas through removal and replacement of asphalt, gravel, and topsoil. If the Government specifies plants for replacement due to contractor damage, replanting must occur at a three-to-one ratio, with the contractor providing water and maintenance for a minimum of three weeks following planting.

View the file

Other files

File Type Posted
B09_Amd11_-_B08_Attach3_-_WD_CA20260020_Mod2_0011.pdf PDF
Sol_140P2025R0082_Amd_0011.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_42_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_38_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_40_Jan2026_0010.pdf PDF
B09_Amd10_QR_Tracker_-_DEVA_318717_Final_0010.xlsx XLSX spreadsheet
B09_Amd10_-_QR55_Attach_Drawing_01-C4_39_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_00-C8_27_Jan2026_0010.pdf PDF
B09_Amd10_-_QR86_Attach_Drawing_C1_40_0010.pdf PDF
B09_Amd10_-_Drawing_G1_22_0010.pdf PDF
B09_Amd10_-_QR86_Attach_Drawing_C1_40B_0010.pdf PDF
Sol_140P2025R0082_Amd_0010.pdf PDF
B09_Amd10_-_B08_Attach4_-_DetailedContractPriceSchedule_0010.xlsx XLSX spreadsheet
B09_Amd10_-_Drawing_G1_2_0010.pdf PDF
B09_Amd10_-_Drawing_Coversheet_00_DEVA_318717_Jan2026x_0010.pdf PDF
B09_Amd10_-_Drawing_G1_21_0010.pdf PDF
Sol_140P2025R0082_Amd_0009.pdf PDF
B09_Amd8_-_Drawing_02-C5_29_Jan2026_0008.pdf PDF
B09_Amd8_-_Spec_33_14_19_-_VALVES___HYDRANTS_FOR_WATER_UTILITY_SERVICE_0008.pdf PDF
B09_Amd8_-_Drawing_02-G1_16_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_08_33_22_-_ALUMINUM_ROLLING_OVERHEAD_DOORS_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_29_Jan2026_0008.pdf PDF
B09_Amd8_-_QR22_Attach_Drawing_00-C7_1_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C5_25_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_00-C8_30_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_01-C4_42_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_01-C3_1_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_20_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_32_00_-_WASTEWATER_PUMPING_STATIONS_0008.pdf PDF
B09_Amd8_-_Spec_33_31_11_-_GRAVITY_SEWER_PIPELINE___MANHOLE_INSTALLATION_0008.pdf PDF
B09_Amd8_QR_Tracker_-_DEVA_318717_0008.xlsx XLSX spreadsheet
B09_Amd8_-_Drawing_Coversheet_00_DEVA_318717_Jan2026_0008.pdf PDF
Sol_140P2025R0082_Amd_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_31_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C6_7_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_15_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-G1_2_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C7_5_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_11_13_-_POTABLE_WATER_SUPPLY_WELLS_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_18_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_02-C5_33_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_42_Jan2026_0008.pdf PDF
B09_Amd8_-_QR56_Attach_Drawing_02-C2_20_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_31_05_-_MANHOLE_LINING___REHABILITATION_0008.pdf PDF
B09_Amd8_-_Drawing_01-G1_15_Jan2026_0008.pdf PDF
B09_Amd8_-_QR56_Attach_Drawing_02-C2_18_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_67_Jan2026_0008.pdf PDF
B09_Amd8_-_Spec_46_33_11_-_CHEMICAL_FEED_-_LIQUID_SYSTEMS_0008.pdf PDF
B09_Amd8_-_Drawing_02-C2_22_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-X1_2_Jan2026_0008.pdf PDF
Show 40 more

Latest 50 of 109 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CIP

P

CIPP

SS

SS

S

S

S

S

S

S

CIPP

CIPP

CIPP

CIPP

CIPP

CIPP

CIPP

C

IPP

SS

SS

SSSS

FM

W S

W S

W 8''

W 8''

W 8''

W 8'

W 8''

W S

WS

W S

W

W

W 8'

W 8''

W 8''

W 8'

W 8''

W 8''

W 8''

W 8''

W 8''

W 8''

W

W 6''

W 6''

W 6''

W 6''

W

IR

R

IRR IRR

WS

PRV

WS

WS

ARV

AR

V

ARV

ARV

ARV

ARV

ARV

AR

V

G V

G

V GV

GV

GV

GV

G V

GV

GV

GV

G V

GV GV

GV

GV

GV

GV

GV

G V

G V

GV

GV

GV

GV

GV

BV

ARV

W 8''

GV

GV

GV

GV

GV

GV

GV

GV

G V

GV

GV

GV

GV

GV

G V

G V

GV

GV

G V

GV

G V

GV

GV

GV

GV

GV

GV

GV

PRV

ARV

ARV

G V

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

178069

318717

DEMOLITION PLAN - COW CREEK

COW CREEK

DEMOLITION PLAN 1

178069

23 513

L. GRAEF

L. GRAEF

M. WHELEHON

1.17.2025

DEATH VALLEY

NATIONAL PARK

318717 02- X1.1

POOL

COW CREEK

LIFT STATION

SIMMS CIRCLE

RV AREA

DEATH VALLEY

ELEMENTARY

SCHOOL

DEATH VALLEY

NATURAL HISTORY

ASSOCIATION

SALT PAN VISTA

RV AREA

DEMOLITION FOOTNOTES:

EXISTING COW CREEK LIFT STATION IS TO REMAIN IN SERVICE DURING CONSTRUCTION. AFTER NEW LIFT STATION AND BUILDING ARE INSTALLED, AND SERVICE IS SWITCHED OVER, EXISTING LIFT STATION BUILDING IS TO BE REMOVED. CONCRETE PAD, TOP SECTION OF LIFT STATION

AND VALVE VAULT ARE TO BE REMOVED, AND AREA IS TO BE BROUGHT BACK TO NATURAL

GRADE

EXISTING COYOTE LOOP LIFT STATION IS TO REMAIN IN SERVICE DURING CONSTRUCTION.

AFTER NEW GRAVITY MAIN IS INSTALLED, AND SERVICE IS SWITCHED OVER, EXISTING LIFT

STATION MANHOLE TO BE ABANDONED IN PLACE AND FILLED WITH GRAVEL/SPOIL MATERIAL

REMOVE ABOVE GRADE PRVS AND RESTORE GROUND TO NATURAL CONDITION

REMOVE TREE/VEGETATION, COORDINATE REMOVAL WITH NPS BOTANIST. SEE SPECIFICATION

SECTION 32 01 01

EXISTING COW CREEK RO TREATMENT BUILDING IS TO REMAIN IN SERVICE DURING

CONSTRUCTION. ONCE NEW RO TREATMENT BUILDING IS INSTALLED, AND SERVICE IS

SWITCHED OVER, EXISTING RO TREATMENT BUILDING IS TO BE REMOVED AND AREA IS TO BE

BROUGHT BACK TO NATURAL GRADE

EXISTING AIR MONITORING TRAILER TO BE REMOVED FROM SITE ONCE ALL EQUIPMENT HAS

BEEN TRANSFERED INTO THE PROPOSED RO TREATMENT BUILDING. REMOVAL NOT TO BE

COMPLETED WITHOUT APPROVAL FROM CO

NOTES:

1. ALTERNATIVE DEMOLITION PLANS MAY BE SUBMITTED BY THE CONTRACTOR FOR

APPROVAL BY THE CONTRACTING OFFICER.

2. REMOVALS ARE TO BE COORDINATED WITH THE CONTRACTING OFFICER.

3. FOR MORE INFORMATION REGARDING THE CONTRACTOR'S USE OF THE SITE - SEE

PROJECT SPECIFICATION SECTION 011100, 1.4.

4. REUSE ALL EXISTING FIRE HYDRANTS. REPLACE WATERLINE UP TO HYDRANT SHOE.

5. REMOVE EXISTING WATER AND SEWER PIPE ENCOUNTERED IN TRENCH DURING

WATER/SEWER MAIN INSTALL. ABANDON PIPE OUTSIDE OF TRENCH LIMITS IN

ACCORDANCE WITH PROJECT SPECIFICATIONS.

6. TRENCH DISTURBANCE LIMITS INDICATE AREAS WHERE ASPHALT, GRAVEL AND TOP SOIL

WILL BE REMOVED AND REPLACED. GRAVEL AND TOP SOIL TO BE STOCKPILED AND

REPLACED.

7. GOVERNMENT (COR) TO SPECIFY PLANTS THAT SHALL BE REPLACED IF DAMAGED. IF

PLANTS SPECIFIED BY THE CO/R, ARE DESTROYED BY THE CONTRACTOR, THE PLANTS

SHALL BE REPLANTED AT RATE OF 3 REPLANTED PLANTS TO1 DESTROYED PLANT TO

ENSURE AT LEAST ONE PLANT SURVIVES TO MATURITY. THE CO/R WILL DETERMINE THE

ACCEPTABLE PLANT SPECIES FOR REPLANTING. THE GOVERNMENT WILL NOT SPECIFY

MORE THAN 20 PLANTS FOR REPLACEMENT. THE CONTRACTOR SHALL WATER

REPLACEMENT PLANTS FOR NOT LESS THAN 3 WEEKS AFTER PLANTING ON A SCHEDULE

ACCORDING TO INDUSTRY BEST PRACTICES FOR THE SPECIES AND PROVIDE TRAINING ON

WATERING SCHEDULE TO THE GOVERNMENT.

250 0 250 500

SCALE OF FEET

COYOTE LOOP

HOUSING AREA

COYOTE LOOP

LIFT STATION

RO TREATMENT

BUILDING AND

WATER TANK

EXISTING

ABOVE GRADE

PRV

EXISTING

ABOVE GRADE

PRV

EXISTING AIR

MONITORING

TRAILER

REMOVE TREE 4

REMOVE TREE 4

REMOVE EXISTING

POOL BUILDING

AutoCAD SHX Text 1/12/26 09:14 KELLY.KERO F:\7194.05 DEVA WATER AND WASTEWATER SYSTEM REHAB\DRAWINGS\DWG\CIVIL\5 SHEET PRODUCTION\3_DEVA W_WW REHAB DEMO.DWG

Kelly.Kero Cloud

Kelly.Kero PolyLine

Kelly.Kero Text Box

Sheets and Views
X1.1 Demo CC

File details come from the government source that posted it. Updated .