DEVA 318717 - Rehab Furnace & Cow Creeks WTP/WWTP
Solicitation number
140P2025R0082
Issued by

About this file

This is a site plan drawing for the Furnace Creek Wastewater Sewage Lagoon System project at Death Valley National Park. The drawing (Sheet C4.38, Drawing No. 215, dated January 17, 2025) depicts the layout and modifications for a wastewater treatment facility consisting of three lagoon cells with associated infrastructure improvements.

The project scope includes removing 2,855 linear feet of existing fence and installing 3,239 linear feet of new 6-foot chainlink fence to match existing fence material, along with a double swing gate at the headworks area. The work requires grading and installation of riprap, construction of a proposed fence line and headworks structure, and grading of existing Cell #3. The contractor must perform all fill excavation, soil mixing, and stockpiling operations within a designated soil quarry and stockpiling boundary, with stockpiles confined to this area. The design incorporates three pond level gauges (installed at each cell with red dashed outlines shown), a proposed gangway and floating dock system, surface aerators, mooring lines and masts, and connections to existing infrastructure including an 8-inch DIP and 8-inch SDR 35 PVC pipe. Additional work areas include a headworks area (referenced on Sheet C4.39), riprap grading (Sheet C4.42), and identification of potential temporary pit areas and site-generated fill mixing zones. The project is managed under PMIS/PKG No. 143, with technical review by M. Whelehon and design by C. Weaver and V. Neary.

View the file

Other files

File Type Posted
B09_Amd11_-_B08_Attach3_-_WD_CA20260020_Mod2_0011.pdf PDF
Sol_140P2025R0082_Amd_0011.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_42_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_38_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_40_Jan2026_0010.pdf PDF
B09_Amd10_QR_Tracker_-_DEVA_318717_Final_0010.xlsx XLSX spreadsheet
B09_Amd10_-_QR55_Attach_Drawing_01-C4_39_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_00-C8_27_Jan2026_0010.pdf PDF
B09_Amd10_-_QR86_Attach_Drawing_C1_40_0010.pdf PDF
B09_Amd10_-_Drawing_G1_22_0010.pdf PDF
B09_Amd10_-_QR86_Attach_Drawing_C1_40B_0010.pdf PDF
Sol_140P2025R0082_Amd_0010.pdf PDF
B09_Amd10_-_B08_Attach4_-_DetailedContractPriceSchedule_0010.xlsx XLSX spreadsheet
B09_Amd10_-_Drawing_G1_2_0010.pdf PDF
B09_Amd10_-_Drawing_Coversheet_00_DEVA_318717_Jan2026x_0010.pdf PDF
B09_Amd10_-_Drawing_G1_21_0010.pdf PDF
Sol_140P2025R0082_Amd_0009.pdf PDF
B09_Amd8_-_Drawing_02-C5_29_Jan2026_0008.pdf PDF
B09_Amd8_-_Spec_33_14_19_-_VALVES___HYDRANTS_FOR_WATER_UTILITY_SERVICE_0008.pdf PDF
B09_Amd8_-_Drawing_02-G1_16_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_08_33_22_-_ALUMINUM_ROLLING_OVERHEAD_DOORS_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_29_Jan2026_0008.pdf PDF
B09_Amd8_-_QR22_Attach_Drawing_00-C7_1_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C5_25_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_00-C8_30_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_01-C4_42_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_01-C3_1_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_20_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_32_00_-_WASTEWATER_PUMPING_STATIONS_0008.pdf PDF
B09_Amd8_-_Spec_33_31_11_-_GRAVITY_SEWER_PIPELINE___MANHOLE_INSTALLATION_0008.pdf PDF
B09_Amd8_QR_Tracker_-_DEVA_318717_0008.xlsx XLSX spreadsheet
B09_Amd8_-_Drawing_Coversheet_00_DEVA_318717_Jan2026_0008.pdf PDF
Sol_140P2025R0082_Amd_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_31_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C6_7_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_15_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-G1_2_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C7_5_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_11_13_-_POTABLE_WATER_SUPPLY_WELLS_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_18_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_02-C5_33_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_42_Jan2026_0008.pdf PDF
B09_Amd8_-_QR56_Attach_Drawing_02-C2_20_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_31_05_-_MANHOLE_LINING___REHABILITATION_0008.pdf PDF
B09_Amd8_-_Drawing_01-G1_15_Jan2026_0008.pdf PDF
B09_Amd8_-_QR56_Attach_Drawing_02-C2_18_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_67_Jan2026_0008.pdf PDF
B09_Amd8_-_Spec_46_33_11_-_CHEMICAL_FEED_-_LIQUID_SYSTEMS_0008.pdf PDF
B09_Amd8_-_Drawing_02-C2_22_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-X1_2_Jan2026_0008.pdf PDF
Show 40 more

Latest 50 of 109 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

-2

-233

-2

-233

-2

-237

-23

-236

-23

-2

-237

-239

-23

-239

-2

-2

-238

-240

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

S

S

X X X X X X

X

X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X X X X X X X X X X X X X X X X X X X X X X

S

CL

CL

W S

W S

W S

W S

W S

W S

W S

ES(B) ES(B) ES(B) ES(B) ES(B) ES(B) ES(B)

S

ES(D) ES(D) ES(D) ES(D) ES(D) ES(D) ES(D) ES(D) ES(D)

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X

W S

W S

W S

W S

W S

W S

W S

-235

-2

-2

-235 -2

-237

-237 -237

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

FURNACE CREEK WASTEWATER

SEWAGE LAGOON SYSTEM

SITE PLAN

178069

215 513

C. WEAVER

V. NEARY

M. WHELEHON

1.17.2025

DEATH VALLEY

NATIONAL PARK

318717 01-

C4.38

HORIZ.50 0 50 100

SCALE OF FEET

REMOVE AND REPLACE

DIVERSION MANHOLE

EXISTING LAGOON

CELL #1

EXISTING

8-INCH DIP

INSTALL 3239' 6-FT CHAINLINK

FENCE (MATCH EXISTING

FENCE MATERIAL)

EXISTING LAGOON

CELL #2

EXISTING LAGOON

CELL #3

DOUBLE SWING

GATE

PROPOSED SURFACE

AERATORS

PROPOSED SURFACE

AERATORS

DISTURBANCE LIMITS

INSTALL POND

LEVEL GAUGE

8" SDR 35 PVC

PROPOSED GANGWAY

AND FLOATING DOCK

(TYP.)

REMOVE 2855'

EXISTING FENCE

SERVICE ROAD

CONNTECT TO

EXISTING CELL

#1 & #2 PIPES

NOTES:

1. REMOVE ENTIRETY OF EXISTING FENCE

2. CONSTRUCT PROPOSED FENCE LINE AND HEADWORKS.

3. GRADE EXISTING CELL #3.

4. CONTRACTOR SHALL PERFORM FILL EXCAVATION AND MIXING WITHIN SOIL QUARRY AND

STOCKPILING BOUNDARY. STOCKPILES SHALL BE CONFINED TO WITHIN THE SOIL QUARRY

AND STOCKPILING BOUNDARY. SEE SECTION 31 23 00 "EARTHWORK", PARAGRAPH 3.6 FOR

MORE DETAILS.

HEADWORKS AREA

SEE SHEET C4.39

GRADE AND INSTALL RIPRAP

SEE SHEET C4.42

MOORING LINE

AND MAST (TYP.)

A C8.27

A C8.27

D C7.2

D C7.10

SOIL QUARRY AND

STOCKPILE BOUNDARY

POTENTIAL

QUARRY AREA

POTENTIAL SITE GENERATED

FILL MIXING AREA

POTENTIAL TEMPORARY

PIT RUN AND DREDGE FILL

STOCKPILE

A C7.13

A C7.13

INSTALL POND

LEVEL GAUGE

INSTALL POND

LEVEL GAUGE

C C7.7

D C7.7

D C7.7

AutoCAD SHX Text 12/17/25 14:39 LAUREL.OTTEY F:\7194.05 DEVA WATER AND WASTEWATER SYSTEM REHAB\DRAWINGS\DWG\CIVIL\5 SHEET PRODUCTION\4_DEVA FC WW_LAGOON

Kelly.Kero Cloud

Kelly.Kero Text Box

Kelly.Kero PolyLine

Kelly.Kero Cloud

Kelly.Kero PolyLine

Kelly.Kero Text Box

Kelly.Kero Cloud

Kelly.Kero Text Box

Kelly.Kero PolyLine

Sheets and Views
214 TREATMENT AREA SITE PLAN