B09_Amd8_-_Drawing_01-C1_22_Jan2026_0008.pdf

PDF 429 KB Posted

Attached to
DEVA 318717 - Rehab Furnace & Cow Creeks WTP/WWTP
Solicitation number
140P2025R0082
Issued by

About this file

This is a technical plan and profile drawing for a water main installation project at Death Valley National Park, specifically the Furnace Creek Water system's North Alignment section. The drawing is sheet C1.22 of a larger 513-sheet project package (PMIS/PKG 178069) designed by L. Graef with technical review by M. Whelehon, dated January 17, 2025.

The project involves installation of 8-inch HDPE DR 17 water main pipe along a northern alignment, spanning from station FW 115+00 to FW 119+56.68. Key infrastructure elements shown include an existing 2.0 MG water tank to be protected in place, a pipe vault/storage room requiring architectural coordination, and multiple utility crossings requiring careful coordination: an existing underground telephone line crossing at station FW 118+75.38 (top of pipe elevation 150.39 feet), an existing water main crossing at FW 119+21.84, an existing sewer main crossing at FW 118+98.46, and appurtenances including a 22.55-inch and 45-degree bend at FW 119+39.64, an 8-inch by 8-inch tee at FW 119+56.68, and an 8-inch gate valve at FW 119+53.27. The proposed water main maintains a minimum cover of 2.50 feet with a maximum cover of 3.74 feet and crosses a dirt access road. The profile view indicates approximate existing ground surface conditions with elevations ranging from approximately 120 to 160 feet, and the plan includes fencing and erosion control measures referenced on sheet C8.12.

View the file

Other files

File Type Posted
B09_Amd11_-_B08_Attach3_-_WD_CA20260020_Mod2_0011.pdf PDF
Sol_140P2025R0082_Amd_0011.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_42_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_38_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_40_Jan2026_0010.pdf PDF
B09_Amd10_QR_Tracker_-_DEVA_318717_Final_0010.xlsx XLSX spreadsheet
B09_Amd10_-_QR55_Attach_Drawing_01-C4_39_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_00-C8_27_Jan2026_0010.pdf PDF
B09_Amd10_-_QR86_Attach_Drawing_C1_40_0010.pdf PDF
B09_Amd10_-_Drawing_G1_22_0010.pdf PDF
B09_Amd10_-_QR86_Attach_Drawing_C1_40B_0010.pdf PDF
Sol_140P2025R0082_Amd_0010.pdf PDF
B09_Amd10_-_B08_Attach4_-_DetailedContractPriceSchedule_0010.xlsx XLSX spreadsheet
B09_Amd10_-_Drawing_G1_2_0010.pdf PDF
B09_Amd10_-_Drawing_Coversheet_00_DEVA_318717_Jan2026x_0010.pdf PDF
B09_Amd10_-_Drawing_G1_21_0010.pdf PDF
Sol_140P2025R0082_Amd_0009.pdf PDF
B09_Amd8_-_Drawing_02-C5_29_Jan2026_0008.pdf PDF
B09_Amd8_-_Spec_33_14_19_-_VALVES___HYDRANTS_FOR_WATER_UTILITY_SERVICE_0008.pdf PDF
B09_Amd8_-_Drawing_02-G1_16_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_08_33_22_-_ALUMINUM_ROLLING_OVERHEAD_DOORS_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_29_Jan2026_0008.pdf PDF
B09_Amd8_-_QR22_Attach_Drawing_00-C7_1_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C5_25_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_00-C8_30_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_01-C4_42_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_01-C3_1_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_20_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_32_00_-_WASTEWATER_PUMPING_STATIONS_0008.pdf PDF
B09_Amd8_-_Spec_33_31_11_-_GRAVITY_SEWER_PIPELINE___MANHOLE_INSTALLATION_0008.pdf PDF
B09_Amd8_QR_Tracker_-_DEVA_318717_0008.xlsx XLSX spreadsheet
B09_Amd8_-_Drawing_Coversheet_00_DEVA_318717_Jan2026_0008.pdf PDF
Sol_140P2025R0082_Amd_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_31_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C6_7_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_15_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-G1_2_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C7_5_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_11_13_-_POTABLE_WATER_SUPPLY_WELLS_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_18_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_02-C5_33_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_42_Jan2026_0008.pdf PDF
B09_Amd8_-_QR56_Attach_Drawing_02-C2_20_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_31_05_-_MANHOLE_LINING___REHABILITATION_0008.pdf PDF
B09_Amd8_-_Drawing_01-G1_15_Jan2026_0008.pdf PDF
B09_Amd8_-_QR56_Attach_Drawing_02-C2_18_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_67_Jan2026_0008.pdf PDF
B09_Amd8_-_Spec_46_33_11_-_CHEMICAL_FEED_-_LIQUID_SYSTEMS_0008.pdf PDF
B09_Amd8_-_Drawing_02-C2_22_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-X1_2_Jan2026_0008.pdf PDF
Show 40 more

Latest 50 of 109 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E

EW(B)

EW(B)

EW(B) EW(B) EW(B) EW(B)

EW(B)

EW(B)

EW(B)

EW(B)

EW(B)

EW(B) EW(B)

EW(B)

EW(B)

EW(B)

EW(B)

EW(B)

EW(B)

EW(B)

EW(B)

EW(B)

EW(B) EW(B)

EW(B)

E W

(B

E W

(B

E W

(B

E W

(B

EW(B)

EW(B)

EW(B)

EW(B)

EW(B)

EW(B)

EW(B)

EW(B)

EW(B)

EW(B)

EW(B)

EW(B)

EW(B)

EW(B)

EW(B)

EW(B)

UG

P(D)

UGP(D) UGP(D) UGP(D) UGP(D) UGP(D) UGP(D) UGP(D) UGP(D) UGP(D) UGP(D) UGP(D) UGP(D) UGP(D) UGP(D) UGP(D) UGP(D) UGP(D) UGP(D) UGP(D) UGP(D) UGP(D) UGP(D) UGP(D) UGP(D) UGP(D)

UGT(D)

UGT(D)

UGT(D)

UGP(D) UGP(D) UGP(D) UGP(D) UGP(D) UGP(D) UGP(D) UGP(D) UGP(D)

ES(B)

ES(B)

ES(B)

ES(B)

ES(B)

ES(B)

ES(B)

ES(B)

ES(B)

ES(B)

ES(B)

ES(B)

ES(B) ES(B)

ES(B)

ES(B)

ES(B)

ES(B)

ES(B)

ES(B)

ES(B)

ES(B)

ES(B)

ES(B)

ES(B

ES(B)

ES(B)

ES(B)

ES(B)

ES(B)

MH

MH

S

UGT(D)

UGT(D)

UGT(D)

UGT(D)

UGT(D)

UGT(D)

UGT(D)

UGT(D)

W 8''

W 8''

W 8''

W 8''

W 8''

W 8''

W 8'' W 8''

W 8''

W 8''

X

X

X

X

X

X

X

115+00

116+00

117+00

118+00

119+00

119+57

GV

GV

G V

GV

L=76.93' R=100.00 =44°04'43"

BEGIN CURVE:

N 2055568.24 E 7195038.32

END CURVE:

N 2055569.07 E 7195069.06

L=29.61' R=200.00 D=8°29'02"

FW 115+00

FW 116+00

FW 117+00

FW 118+00

FW 119+00

F W

119+57

UNDERGROUND

TELEPHONE CROSSING

STA:FW 118+75.38

EXISTING WATER

MAIN CROSSING

STA:FW 119+21.84 22.55 & 45 DEG. BEND

STA:FW 119+39.64

8'' X 8'' TEE

STA:FW 119+56.68

8'' GATE VALVE

STA:FW 119+53.27

110 11 0 110110 11

120 12

EXISTING SEWER

MAIN CROSSING

STA:FW 118+98.46

FW 115+00

.7

.2

.7

.7

.4

.2

.4

.7

.0

.8

FW 116+00

.8

.9

.4

.1

.9

.6

.0

.5

.3

.3

FW 117+00

.8

.0

.5

.3

.0

.8

.0

.3

.0

.8

FW 118+00

.0

.3

.0

.8

.7

.3

.4

.7

.7

.2

FW 119+00

.0

.7

.1

.2

.5

.8

FW 119+56.68

S T

A F

W

.3

T

.O .P

E L

E V

.3

E X

IS

T

IN

G

U N

D E

R G

R O

U N

D T

E L

E P

H O

N E

C R

O S

S

IN

G

S T

A F

W

.8

T

.O .P

E

L E

V :1

.1

E X

IS

T

IN

G

W A

T E

R M

A

IN

C R

O S

S

IN

G

S T

A F

W

.6

T .O

.P E

L E

V

.3

X

T

E E

S T

A F

W

.2

T

.O .P

E

L E

V :1

.5

G A

T E

V A

L V

E

S T

A F

W

.4

T

.O .P

E L

E V

.7

E X

IS

T

IN

G

S E

W E

R M

A

IN

C R

O S

S

IN

G

S T

A F

W

.6

T

.O .P

E

L E

V :1

.7

.5

D

E G

B

E N

D

FO(D)

FW 502+78

FW 500+00

F W

501+00

F W

502+00

GV

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

FURNACE CREEK WATER

PLAN & PROFILE

NORTH ALIGNMENT

178069

47 513

L. GRAEF

L. GRAEF

M. WHELEHON

1.17.2025

DEATH VALLEY

NATIONAL PARK

318717 01-

C1.22

20 0 20 40

SCALE OF FEET

10 0 10 20

HORIZ.

VERT.

PLAN

PROFILE

KEY MAP

NTS

SEE SHEET C1.47

EXISTING 2.0 MG WATER TANK

PROTECT IN PLACE

END STATIONING

PIPE VAULT/STORAGE ROOM

SEE ARCHITECTURAL

SHEETS

FENCING AND EROSION

CONTROL SEE SHEET C8.12

EXISTING WATER MAIN

EXISTING WATER MAIN

DISTURBANCE

LIMIT 50'

3.74' COVER

(MIN COVER = 2.50')

EDGE OF

PAVEMENT

D C3.12

S E

E S

H E

E T

C .2

DIRT ACCESS ROAD

EXISTING

UNDERGROUND

POWER LINE

APPROXIMATE EXISTING

GROUND SURFACE

8'' HDPE DR 17

WATER MAIN

8'' HDPE DR 17

WATER MAIN

A C3.12

AutoCAD SHX Text 1/7/26 15:05 LAUREL.OTTEY F:\7194.05 DEVA WATER AND WASTEWATER SYSTEM REHAB\DRAWINGS\DWG\CIVIL\5 SHEET PRODUCTION\4_DEVA FC W_NORTH

Kelly.Kero Cloud

Kelly.Kero PolyLine

Kelly.Kero Text Box

Sheets and Views
47 P&P - (44)

File details come from the government source that posted it. Updated .