M210_-_UTILITY_LEVEL_-_FIRE_PROTECTION_-_NW_PARTIAL_PLAN_0009.pdf
PDF 244 KB Posted
- Attached to
- NAMA 216042 - Lincoln Memorial Rehabilitation
- Solicitation number
- 140P2022R0046
About this file
This document package includes construction drawings and specifications for a federal contract opportunity to rehabilitate the Lincoln Memorial in Washington, D.C. The scope of work includes repairing or replacing any existing building elements that are damaged during construction work, installing sprinklers in spaces with acoustical ceilings, and adding a 2-1/2 inch fire department valve inside the stairwell. Drawings depict the utility level fire protection plan and partial plans for the northwest section. The related solicitation is for NAMA 216042 issued by the National Park Service to rehabilitate the Lincoln Memorial Undercroft including repairs, upgrades and restoration work. The estimated value is unspecified.
View the file
Other files
Show 40 more
Latest 50 of 171 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IT ROOM
EXHIBIT IT / AV
STAIR 1
ST1.0
15 17 18
B
C
D
G
A
10 11 13
E
F
FDV
B1
B1
SW NW
SE NE
KEY PLAN
SCALE OF FEET
0'8' 8' 16'
SCALE A
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
132917
NAMA-216042
TITLE OF SHEETSEAL
LEGEND
GENERAL NOTES
KEY NOTES
B
IM
L in c o ln
M e m o ri a l U n d e rc ro ft L in c o ln
M e m o ri a l_ P lu m b v .r v t
RAN
RAN
M210
ADP
5/13/2022
UTILITY LEVEL - FIRE
PROTECTION - NW
PARTIAL PLAN
LINCOLN MEMORIAL REHABILITATION
NATIONAL MALL AND MEMORIAL PARKS 61
SCALE AM210
1 UTILITY LEVEL - FIRE PROTECTION - NW PARTIAL PLAN
1. EXISTING BUILDING ELEMENTS AND DISTRIBUTION, INCLUDING BUT NOT LIMITED TO
WALLS, CEILINGS, LIGHTS, CONDUIT, DUCTS, PIPING, INSULATION, OR OTHER
SYSTEMS THAT ARE DAMAGED OR REMOVED DUE TO CONTRACTOR'S WORK SHALL
BE PATCHED, REPAIRED, OR REPLACED BY THE CONTRACTOR TO THE SATISFACTION
OF THE CONTRACTING OFFICER AND AUTHORITIES HAVING JURISDICTION.
2. REFER TO M200 FOR TYPICAL BRANCH LINE SIZING.
3. INSTALL SPRINKLERS IN SPACES WITH ACOUSTICAL CEILING TILES SO THEY ARE
CENTERED WITHIN THE TILES.
4. REFER TO ARCHITECTURAL DRAWINGS FOR SECTIONS, REFLECTED CEILING PLANS,
BUILDING OCCUPANCY, AND FIRE EXTINGUISHER LOCATIONS.
5. REFER TO ELECTRICAL DRAWINGS FOR FIRE ALARM AND SMOKE DETECTION
SYSTEMS.
1. THIS ROOM SHALL BE PROTECTED BY CLEAN AGENT SYSTEM.
2. INSTALL 2-1/2" FDV EXPOSED INSIDE STAIR.
NO. REVISION DATE BY
B1 BID ADDENDUM 3 7/01/2022 AEI
B1
7/1/2022
| Sheets |
| M201 - UTILITY LEVEL - FIRE PROTECTION PLAN |
| M208 - UTILITY LEVEL - FIRE PROTECTION - NE PARTIAL PLAN |
| M210 - UTILITY LEVEL - FIRE PROTECTION - NW PARTIAL PLAN |
File details come from the government source that posted it. Updated .