A154_-_FINISH_SCHEDULE_0009.pdf

PDF 795 KB Posted

Attached to
NAMA 216042 - Lincoln Memorial Rehabilitation
Solicitation number
140P2022R0046
Issued by

About this file

This document is a finish schedule for the Lincoln Memorial Rehabilitation project. It provides specifications for flooring, wall, door, and ceiling finishes for various rooms in the utility level, exhibit level, and chamber level. Key areas include the south and north mechanical rooms, elevator machine rooms, electrical rooms, toilet facilities, exhibit and retail spaces, offices, corridors, stairwells, and the statuary chamber. Finish materials include concrete, terrazzo, polished concrete, wallcoverings, painted gypsum board, and acoustic wall panels. The schedule also references related architectural drawings covering floor plans, reflected ceiling plans, elevations, and details.

The associated federal contract opportunity is a solicitation for the NAMA 216042 Lincoln Memorial Rehabilitation project issued by the National Park Service National Office. The opportunity involves rehabilitation work at the Lincoln Memorial Undercroft. The solicitation number is 140P2022R0046.

View the file

Other files

File Type Posted
Sol_140P2022R0046_Amd_0011.pdf PDF
Sol_140P2022R0046_Amd_0010.pdf PDF
05_7000_-_DECORATIVE_METAL_0009.pdf PDF
28_05_00_01_Common_Results_for_Elect_Sec_Add_3_0009.pdf PDF
A31_-_EXHIBIT_LEVEL_RCP_0009.pdf PDF
M210_-_UTILITY_LEVEL_-_FIRE_PROTECTION_-_NW_PARTIAL_PLAN_0009.pdf PDF
01_2700_-_Contract_Line_Items_0009.pdf PDF
A101_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_SCREENING_0009.pdf PDF
G6_0_(ADDENDUM_3)_0009.pdf PDF
G8_1_(ADDENDUM_3)_0009.pdf PDF
A82_-_INTERIOR_ELEVATIONS_-_ELEVATORS_0009.pdf PDF
01_3591_-_Historic_Preservation_Treatment_0009.pdf PDF
14_2100_Hydraulic_Elevators_0009.pdf PDF
E72_-_PANEL_SCHEDULES_0009.pdf PDF
C16_(ADDENDUM_3)_0009.pdf PDF
A128_-_INTERIOR_ELEVATIONS_-_FAMILY___UNISEX_TOILETS_0009.pdf PDF
E390_-_UTILITY_LEVEL_-_ENLARGED_PLAN__-_Addendum_3_0009.pdf PDF
07_1413_-_HOT_FLUID-APPLIED_RUBBERIZED_ASPHALT_WATERPROOFING_0009.pdf PDF
E45_-_EXHIBIT_LEVEL_-_CEILING_LIGHTING_-_SE_PARTIAL_PLAN_0009.pdf PDF
A100_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_ENTRY_VESTIBULES_0009.pdf PDF
A104_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_SOUTH_EXHIBIT_0009.pdf PDF
A99_-_CHAMBER_LEVEL_-_ENLARGED_PLANS_0009.pdf PDF
G11_-_TEMPORARY_PROTECTION_-_INTERIOR_-_EXHIBIT_LEVEL_0009.pdf PDF
A107_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_TOILET_0009.pdf PDF
E46_-_EXHIBIT_LEVEL_-_CEILING_LIGHTING_-_NE_PARTIAL_PLAN_0009.pdf PDF
Sol_140P2022R0046_Amd_0009.pdf PDF
A30_-_UTILITY_LEVEL_RCP_0009.pdf PDF
A105_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_RETAIL_0009.pdf PDF
A108_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_UNISTRUT_FRAME_0009.pdf PDF
A127_-_INTERIOR_ELEVATIONS_-_WOMEN_S___MEN_S_TOILETS_0009.pdf PDF
E54_-_EXHIBIT_LEVEL_-_WALL-BACK_LIGHTING_-_NE_PARTIAL_PLAN_2_0009.pdf PDF
G10_-_TEMPORARY_PROTECTION_-_INTERIOR_-_UTILITY_LEVEL_0009.pdf PDF
A103_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_CENTRAL_EXHIBIT_0009.pdf PDF
A102_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_NORTH_EXHIBIT_0009.pdf PDF
E14_-_EXHIBIT_LEVEL_-_POWER_-_SE_PARTIAL_PLAN_0009.pdf PDF
M208_-_UTILITY_LEVEL_-_FIRE_PROTECTION_-_NE_PARTIAL_PLAN_0009.pdf PDF
E361_-_SECURITY_DETAILS_-_Addendum_3_0009.pdf PDF
A106_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_NORTH_EXIT_AND_BREAK_ROOM_0009.pdf PDF
A153_-_MATERIAL_SCHEDULE_0009.pdf PDF
A51_-_NORTH___SOUTH_ELEVATIONS_0009.pdf PDF
01_1100_-_Summary_of_Work_0009.pdf PDF
E15_-_EXHIBIT_LEVEL_-_POWER_-_NE_PARTIAL_PLAN_0009.pdf PDF
M201_-_UTILITY_LEVEL_-_FIRE_PROTECTION_PLAN_0009.pdf PDF
E360_-_SECURITY_DETAILS_-_Addendum_3_0009.pdf PDF
E53_-_EXHIBIT_LEVEL_-_WALL-BACK_LIGHTING_-_SE_PARTIAL_PLAN_2_0009.pdf PDF
C31_(ADDENDUM_3)_0009.pdf PDF
Sol_140P2022R0046_Amd_0008.pdf PDF
NAMA_LINC_216042_Bid_Questions_and_Responses_Vol_3_0008.pdf PDF
B08_Solit_Attachment__PriceSched-Rev_070522_0008.xlsx XLSX spreadsheet
Sol_140P2022R0046_Amd_0007.pdf PDF
Show 40 more

Latest 50 of 171 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

TITLE OF SHEET

OF

132917

NAMA-216042

SEAL

B

IM

L in c o ln

M e m o ri a l U n d e rc ro ft L in c o ln

M e m o ri a l_ A rc h U n d e rc ro ft .r v t

QE

QE

A154

FINISH SCHEDULE

LINCOLN MEMORIAL REHABILITATION

NATIONAL MALL AND MEMORIAL PARKS

QE

5/13/2022 187

FINISH SCHEDULE

ROOM NUMBER ROOM NAME

FLOOR

BASE

WALLS DOOR

CEILING COMMENTSFIELD NORTH EAST SOUTH WEST DOOR FRAME

UTILITY LEVEL

001 SOUTH MECHANICAL CONC-2 NONE PT-3 PT-3 PT-3 PT-3 PT-1

003 SOUTH ELEVATOR MACHINE ROOM CONC-2 NONE PT-3 PT-3 PT-3 PT-3 PT-1

005 SOUTH ELEVATOR VESTIBULE CONC-2 NONE PT-3 PT-3 PT-3 PT-3 PT-1

006 MAIN ELECTRICAL CONC-2 NONE PT-3 PT-3 PT-3 PT-3 PT-1

006A LIGHTING INVERTER CONC-2 NONE PT-3 PT-3 PT-3 PT-3 PT-1

007 FIRE PUMP CONC-2 NONE PT-3 PT-3 PT-3 PT-3 PT-1

008 NORTH ELEVATOR VESTIBULE CONC-2 NONE PT-3 PT-3 PT-3 PT-3 PT-1

009 NORTH ELEVATOR MACHINE ROOM CONC-2 NONE PT-3 PT-3 PT-3 PT-3 PT-1

011 NORTH MECHANICAL CONC-2 NONE PT-3 PT-3 PT-3 PT-3 PT-1

013 NPS STORAGE RFT-1 RB-1 PT-3 PT-3 PT-3 PT-3 PT-1

015 NPS / RETAIL IT RFT-1 RB-1 PT-3 PT-3 PT-3 PT-3 PT-1

017 EXHIBIT IT / AV RFT-1 RB-1 PT-3 PT-3 PT-3 PT-3 PT-1

019 IT ROOM RFT-1 RB-1 PT-3 PT-3 PT-3 PT-3 PT-1

020 TELECOM CONC-2 NONE PT-3 PT-3 PT-3 PT-3 PT-1

ST1.0 STAIR 1 CONC-2 NONE PT-3 PT-3 PT-3 PT-3 PT-1

STAIR LANDING 1

301 STORAGE

MEZZANINE

154 BOH ACCESS EXIST / CONC-2 NONE EXIST EXIST PT-5 EXIST EXIST

EXHIBIT LEVEL

100 SOUTH VESTIBULE PCT-1 SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV SEE INT. ELEV. AP-1

101 FIRE CONTROL ROOM CONC-2 NONE PT-3 PT-3 PT-3 PT-3 PT-1

102 SOUTH ELEVATOR LOBBY PCT-1 SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV SEE INT. ELEV. AP-1

104 SOUTH SALLY PORT EXIT PCT-1 SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV SEE INT. ELEV. AP-1

110 SERVICES CORRIDOR PCT-1 SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV SEE INT. ELEV. AP-3

110A VESTIBULE PCT-1 SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV SEE INT. ELEV. AP-1

111 WOMEN'S VESTIBULE CT-1 CT-5 CT-2 CT-2 CT-2 CT-2 PT-1

112 WOMEN'S TOILETS CT-1 SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV SEE INT. ELEV. PT-1

113 JANITOR CT-1 CT-5 CT-2 CT-2 CT-2 CT-2 PT-1

114 MEN'S VESTIBULE CT-1 CT-5 CT-2 CT-2 CT-2 CT-2 PT-1

115 MEN'S RESTROOM CT-1 SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV SEE INT. ELEV. PT-1

116 JANITOR CT-1 CT-5 CT-2 CT-2 CT-2 CT-2 PT-1

117 UNISEX TOILET CT-1 SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV SEE INT. ELEV. PT-1

118 FAMILY TOILET CT-1 CT-5 CT-2 CT-2 CT-2 CT-2 PT-1

119 FAMILY TOILET CT-1 CT-5 CT-2 CT-2 CT-2 CT-2 PT-1

120 EXHIBIT SPINE PCT-1 SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV SEE INT. ELEV. WSC-1

121 NORTH EXHIBIT PCT-1 SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV SEE INT. ELEV. WSC-1

122 IMMERSIVE FORUM PCT-1 SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV SEE INT. ELEV. AP-2 , WSC-1

123 SOUTH EXHIBIT PCT-1 SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV SEE INT. ELEV. WSC-1

130 RETAIL PCT-1 SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV SEE INT. ELEV. AP-2

131 RETAIL STORAGE RFT-1 RB-1 PT-3 PT-3 PT-3 PT-3 ACP -1

132 RETAIL OFFICE RFT-1 RB-1 PT-3 PT-3 PT-3 PT-3 ACP -1

140 NORTH VESTIBULE PCT-1 SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV SEE INT. ELEV. AP-1

141 PRE-SCREENING PCT-1 SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV SEE INT. ELEV. AP-1

142 POST SCREENING PCT-1 SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV SEE INT. ELEV. AP-1

143 EXHIBIT SALLY PORT PCT-1 SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV SEE INT. ELEV. AP-1

144 WORK ROOM RFT-1 RB-1 PT-3 PT-3 PT-3 PT-3 ACP -1 PROVIDE BASE ON NEW WALLS ONLY. DO NOT ADD BASE TO EXISTING CONCRETE COLUMNS.

144A STORAGE RFT-1 RB-1 PT-3 PT-3 PT-3 PT-3 ACP -1 PROVIDE BASE ON NEW WALLS ONLY. DO NOT ADD BASE TO EXISTING CONCRETE COLUMNS.

145 NORTH ELEVATOR LOBBY PCT-1 SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV SEE INT. ELEV. AP-1

146 NORTH SALLY PORT EXIT PCT-1 SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV. SEE INT. ELEV SEE INT. ELEV. AP-1

151 OFFICE RFT-1 RB-1 PT-3 PT-3 PT-3 PT-3 ACP-2

153 CORR RT-1 RB-1 PT-3 PT-3 PT-3 PT-3 GWB-1 PROVIDE BASE ON NEW WALLS ONLY. DO NOT ADD BASE TO EXISTING CONCRETE COLUMNS.

ST1.1 STAIR 1 CONC-2 NONE PT-3 PT-3 PT-3 PT-3 PT-1

CHAMBER

200 STATUARY CHAMBER NIC NIC NIC NIC NIC NIC NIC

201 NPS WORKROOM EXIST STONE EXIST STONE PT-4 PT-4 PT-4 PT-4 PT-5

201A TOILET EXIST STONE EXIST STONE PT-4 PT-4 PT-4 PT-4 PT-5

201B STORAGE

203 USPP EXIST VCT EXIST

PAINTED

PT-4 PT-4 PT-4 PT-4 PT-5

203A TOILET EXIST STONE EXIST STONE PT-4 PT-4 PT-4 PT-4 PT-5

204 NORTH ELEVATOR VESTIBULE ST-1 ST-1 PT-4 PT-4 PT-4 PT-4 PT-5

205 GREEN ROOM ST-1 ST-1 PT-4 PT-4 PT-4 PT-4 PT-5

206 JANITOR'S CLOSET CT-3 CT-3 CT-4 CT-4 CT-4 CT-4 PT-1

207 SOUTH ELEVATOR VESTIBULE EXIST STONE EXIST STONE PT-4 PT-4 PT-4 PT-4 PT-5

B1

B1

B1

B1

B1

B2

NO. REVISION DATE BY

B1 BID ADDENDUM 2 6/24/2022 QE

B2 BID ADDENDUM 3 7/1/2022

B2

B2B2

B2

B2

B2

B2

SEAL

Sheets
A30 - UTILITY LEVEL RCP
A31 - EXHIBIT LEVEL RCP
A51 - NORTH & SOUTH ELEVATIONS
A82 - INTERIOR ELEVATIONS - ELEVATORS
A99 - CHAMBER LEVEL - ENLARGED PLANS
A100 - EXHIBIT LEVEL - ENLARGED RCP - ENTRY VESTIBULES
A101 - EXHIBIT LEVEL - ENLARGED RCP - SCREENING
A102 - EXHIBIT LEVEL - ENLARGED RCP - NORTH EXHIBIT
A103 - EXHIBIT LEVEL - ENLARGED RCP - CENTRAL EXHIBIT
A104 - EXHIBIT LEVEL - ENLARGED RCP - SOUTH EXHIBIT
A105 - EXHIBIT LEVEL - ENLARGED RCP - RETAIL
A106 - EXHIBIT LEVEL - ENLARGED RCP - NORTH EXIT AND BREAK ROOM
A107 - EXHIBIT LEVEL - ENLARGED RCP - TOILET
A108 - EXHIBIT LEVEL - ENLARGED RCP - UNISTRUT FRAME
A127 - INTERIOR ELEVATIONS - WOMEN'S & MEN'S TOILETS
A128 - INTERIOR ELEVATIONS - FAMILY & UNISEX TOILETS
A153 - MATERIAL SCHEDULE
A154 - FINISH SCHEDULE