M208_-_UTILITY_LEVEL_-_FIRE_PROTECTION_-_NE_PARTIAL_PLAN_0009.pdf
PDF 458 KB Posted
- Attached to
- NAMA 216042 - Lincoln Memorial Rehabilitation
- Solicitation number
- 140P2022R0046
About this file
This document package includes plans for a fire protection system and details of a related federal contract opportunity for rehabilitation work at the Lincoln Memorial. The plans show sprinkler and standpipe layouts for the utility level of the memorial, noting room names, pipe sizes, riser locations, and design notes. The solicitation is for contract NAMA 216042 to perform work at the Lincoln Memorial Undercroft and is issued by the National Park Service National Office within the Department of the Interior. The pre-bid documents include specific fire protection drawings to inform contractor responses due by July 1, 2022, with award dates to follow.
View the file
Other files
Show 40 more
Latest 50 of 171 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2" SPR
4" S
PR
M251
IT ROOM
EXHIBIT IT / AV
STAIR 1
ST1.0
NPS / RETAIL IT
NPS STORAGE
NORTH MECHANICAL
NORTH ELEVATOR
MACHINE ROOM
NORTH ELEVATOR
VESTIBULE
12 14 15 17 18
G
L
M
O
P
10 11 13
H
J
K
N
4" SPR
4" SPR
3" S
PR
2"
S
PR
2 1/2" SPR
4" SPR
3" SPR
2" SPR
4" SPR
3" SPR
6" SPR
6" SPR
6" DCW
4" F
6" F
6" F
4" F
FDV
FDV
4" SPR
B1
SW NW
SE NE
KEY PLAN
SCALE OF FEET
0'8' 8' 16'
SCALE A
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
132917
NAMA-216042
TITLE OF SHEETSEAL
LEGEND
GENERAL NOTES
KEY NOTES
B
IM
L in c o ln
M e m o ri a l U n d e rc ro ft L in c o ln
M e m o ri a l_ P lu m b v .r v t
RAN
RAN
M208
ADP
5/13/2022
UTILITY LEVEL - FIRE
PROTECTION - NE
PARTIAL PLAN
LINCOLN MEMORIAL REHABILITATION
NATIONAL MALL AND MEMORIAL PARKS 59
SCALE AM208
1 UTILITY LEVEL - FIRE PROTECTION - NE PARTIAL PLAN
1. THIS ROOM SHALL BE PROTECTED BY CLEAN AGENT SYSTEM.
2. ROUTE 4"SPR FOR EXHIBIT B AND 4"F FOR FDV STACKED HORIZONTALLY.
3. INSTALL 2-1/2" FDV EXPOSED INSIDE STAIR.
4. 6"F UP TO FEED HORIZONTAL STANDPIPE ON EXHIBIT LEVEL.
5. SPRINKLER RISERS UP TO CHAMBER NORTH, EXHIBIT A, AND EXHIBIT MAIN
SPRINKLER ZONES.
6. 4"SPR UP TO FEED EAST SIDE OF EXHIBIT A SPRINKLER ZONE.
7. 2"MAIN DRAIN UP.
1. EXISTING BUILDING ELEMENTS AND DISTRIBUTION, INCLUDING BUT NOT LIMITED TO
WALLS, CEILINGS, LIGHTS, CONDUIT, DUCTS, PIPING, INSULATION, OR OTHER
SYSTEMS THAT ARE DAMAGED OR REMOVED DUE TO CONTRACTOR'S WORK SHALL
BE PATCHED, REPAIRED, OR REPLACED BY THE CONTRACTOR TO THE SATISFACTION
OF THE CONTRACTING OFFICER AND AUTHORITIES HAVING JURISDICTION.
2. REFER TO M200 FOR TYPICAL BRANCH LINE SIZING.
3. INSTALL SPRINKLERS IN SPACES WITH ACOUSTICAL CEILING TILES SO THEY ARE
CENTERED WITHIN THE TILES.
4. REFER TO ARCHITECTURAL DRAWINGS FOR SECTIONS, REFLECTED CEILING PLANS,
BUILDING OCCUPANCY, AND FIRE EXTINGUISHER LOCATIONS.
5. REFER TO ELECTRICAL DRAWINGS FOR FIRE ALARM AND SMOKE DETECTION
SYSTEMS.
NO. REVISION DATE BY
B1 BID ADDENDUM 3 7/01/2022 AEI
B1
7/1/2022
| Sheets |
| M201 - UTILITY LEVEL - FIRE PROTECTION PLAN |
| M208 - UTILITY LEVEL - FIRE PROTECTION - NE PARTIAL PLAN |
| M210 - UTILITY LEVEL - FIRE PROTECTION - NW PARTIAL PLAN |
File details come from the government source that posted it. Updated .