B08_Solit_Attachment__PriceSched-Rev_070522_0008.xlsx
XLSX spreadsheet 35 KB Posted
- Attached to
- NAMA 216042 - Lincoln Memorial Rehabilitation
- Solicitation number
- 140P2022R0046
About this file
This document contains three sample contract price schedule templates for federal construction projects procured using design-bid-build, design-build, and firm-fixed price contracting methods.
The templates include line items for base requirements and optional additions with quantities, units of measure, unit prices and total proposed prices. For the Lincoln Memorial rehabilitation project, the base line items cover exhibits, security, structural areas and site work, while the options contemplate additional elevator upgrades, soil remediation and material restoration. Measurement and payment details are in the specifications. The Yosemite visitors center template separates base items for the facility, utilities and excavation from optional geothermal and solar components. The third template structures design and construction of a new structure as separate line items with a photovoltaic option.
View the file
Other files
Show 40 more
Latest 50 of 171 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Template
| Contract Price Schedule Template | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: | 140P2022R0046 | ||||
| PARK - PMIS: | NAMA - 216042 | ||||
| (Project Management Information System) | |||||
| Developed Area: | Lincoln Memorial | ||||
| Project Title: | Lincoln Memorial Undercroft | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Undercroft Exhibit Level and Restrooms | 1 | Lump Sum | $0.00 | |
| 2 | Undercroft Security | 1 | Lump Sum | - 0 | |
| 3 | Chamber Level | 1 | Lump Sum | - 0 | |
| 4 | Utility Level | 1 | Lump Sum | - 0 | |
| 5 | North Elevator | 1 | Lump Sum | - 0 | |
| 6 | Site Utilties and Landscape Elements | 1 | Lump Sum | - 0 | |
| 7 | Abatement of Identified (Confirmed) Contaminated Soil in the Raised Terrace Undercroft | 1 | Lump Sum | - 0 | |
| 8 | Concrete Repair | 1 | Lump Sum | - 0 | |
| 9 | Staging and Site Security | 1 | Lump Sum | - 0 | |
| 10 | Attic and Roof Drains | 1 | Lump Sum | - 0 | |
| 11 | Plaster Repair | 1 | Lump Sum | ||
| 12 | Demolition | 1 | Lump Sum | ||
| 13 | Temporary Protection | 1 | Lump Sum | ||
| TOTAL BASE PRICE (Contract Line Item Number 1 through 13) --------------------------------------------------------------------------------- | $0.00 | ||||
| 14 | OPTION A, (North Elevator, Chamber Level Vestibule and Green Room) | 1 | Lump Sum | - 0 | |
| 15 | OPTION B, (Restoration of the Terrace Grass) | 1 | Lump Sum | - 0 | |
| 16 | OPTION C, (Historic Bronze doors and transoms Repair and Restoration) | 1 | Lump Sum | - 0 | |
| 17 | OPTION D, (Main Stair Tread Flipping) | 1 | Lump Sum | - 0 | |
| 18 | OPTION E, (Abatement of Assumed Contaminated Soil in the Raised Terrace Undercroft) | 1 | Lump Sum | - 0 | |
| 19 | OPTION F, (Abatement of Assumed Contaminated Existing Beams) | 1 | Lump Sum | - 0 | |
| 20 | OPTION G, (Removal of Existing VCT in USPP Room (NW corner) on Chamber Level) | 1 | Lump Sum | - 0 | |
| 21 | OPTION H, (Renovation of NPS Breakroom (SW corner) on Chamber Level) | 1 | Lump Sum | - 0 | |
| 22 | OPTION I, (Repair of the Historic Stone Door Surround on the Chamber Level) | 1 | Lump Sum | - 0 | |
| 23 | OPTION J, (Installation of a Vapor Barrier at the Utility Level – Raised Terrace Undercroft) | 1 | Lump Sum | - 0 | |
| 24 | OPTION K, (Installation of a Vapor Barrier at the Utility Level – Chamber Undercroft) | 1 | Lump Sum | ||
| 25 | OPTION L, Unit Price Concrete Spall Repair at the Undercroft | 1 | SF | ||
| 26 | OPTION M, Unit Price Plaster Repair to Walls on the Chamber Level | 1 | SF | ||
| 27 | OPTION N, Unit Price Concrete Crack Repair at the Undercroft | 1 | LF | - 0 | |
| 28 | OPTION O Unit Price Plaster Crack Repair to Walls on the Chamber Level | 1 | LF | - 0 | |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 12 through 26) ----------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 28) -------------------------- | $0.00 | ||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |
Design-Bid-Build (DBB) Sample
| Contract Price Schedule - Design-Bid-Build (DBB) SAMPLE | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: | N2011080811 | ||||
| PARK - PMIS: | YELL 012345 | ||||
| (Project Management Information System) | |||||
| Developed Area: | Old Faithful | ||||
| Project Title: | Johnstonian Visitors Center | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Visitors Center | 1 | Lump Sum | $0.00 | |
| 2 | Water Line | 400 | Lineal Feet | - 0 | |
| 3 | Sanitary Sewer Line | 200 | Lineal Feet | - 0 | |
| 4 | Rock Excavation | 150 | Cubic Yards | - 0 | |
| TOTAL BASE PRICE (Contract Line Item Number 1 through 4) --------------------------------------------------------------------------------- | $0.00 | ||||
| 5 | OPTION A, Geothermal Wells | 1 | Lump Sum | - 0 | |
| 6 | OPTION B, Photovoltaic System | 1 | Lump Sum | - 0 | |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 5 and 6) ------------------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 6) ---------------------------- | $0.00 | ||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |
Design-Build (DB) Sample
| Contract Price Schedule - Design-Build (DB) SAMPLE | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: | N2011080811 | ||||
| PARK - PMIS: | YELL 012345 | ||||
| (Project Management Information System) | |||||
| Developed Area: | Yosemite Valley | ||||
| Project Title: | Design and Build a New Structure | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Design | 1 | Lump Sum | $0.00 | |
| 2 | Construction | 1 | Lump Sum | - 0 | |
| TOTAL BASE PRICE (Contract Line Item Number 1 and 2) --------------------------------------------------------------------------------------- | $0.00 | ||||
| 3 | OPTION A, Photovoltaic System | 1 | Lump Sum | - 0 | |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 3) ---------------------------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 3) ---------------------------- | $0.00 | ||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |