E46_-_EXHIBIT_LEVEL_-_CEILING_LIGHTING_-_NE_PARTIAL_PLAN_0009.pdf
PDF 253 KB Posted
- Attached to
- NAMA 216042 - Lincoln Memorial Rehabilitation
- Solicitation number
- 140P2022R0046
About this file
This document package includes construction drawings and specifications for lighting upgrades at the Lincoln Memorial as part of solicitation 140P2022R0046 for the Lincoln Memorial Rehabilitation project. The drawings depict the existing lighting layout and fixtures at the Exhibit level of the memorial and provide details on proposed lighting replacements, including fixture types and locations, circuiting and power plans, schedules and notes. Proposed work includes replacing existing ceiling, wall and track lighting in exhibit areas, corridors and utility spaces with new energy efficient fixtures, upgrading circuits and panels, and integrating exit signs. The project will be conducted by the National Park Service to improve lighting quality and efficiency while minimizing disruptions to memorial operations during construction.
View the file
Other files
Show 40 more
Latest 50 of 171 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
S
DT/D
D
S
VDT
S
DT/D
S
DT/D
D D
S
DT/D
WP
3T
J
J
JJ
J
J J
JJ
NORTH VESTIBULE
NORTH SALLY PORT EXIT
WORK ROOM
PRE-SCREENING
NORTH ELEVATOR LOBBY
EXHIBIT SALLY PORT
STAIR 1
ST1.1
CORR
15 17 18
G
L
M
O
P
F
H
J
K
N DG4a
DG4a
DG4a
DG3a DG3a DG3a
DG3b
DG3a
DG3c
DG3c
DG3a
DG3b
DG3b
DG3b
DG4aDG4a
DG4a DG4a
DG4aDG4a
DG4b DG4b
E
/1 E48
DD2a
DD2a DD2a
DD2a
DW3b
DG6eDG6e
DW3b
DG5a
DD2b DD2b
DD2b
DD2bDD2b
DW3b
DD1
DD1
DG6a
DD1 DD1 DD1 DD1 DD1
DD3DD3
DG4a
DG4a
DG4a
DW3b DW3b
DW1g
DW1f
DW1e
DW1dDW1bDW1a
P1E
P1
P1E
P1
X4
X1
X1
X4
X4 DG3d
DW2 DW2
DW2 DW2
P1
BOH ACCESS
X4 X4
X1
X4
P
X1
P1
P1
P1E
P1E P1
P1P1
X1
DG5c
OFFICE
P1E
P1
RETAIL
X4
X4
X2
EM(N)-8
EM(N)-8
EM(N)-8
EM(N)-8
EM(N)-8 EM(N)-8
EM(N)-8
EM(N)-8
EM(N)-8
EM(N)-8
EM(N)-8 EM(N)-8
EM(N)-8
EM(N)-11
EM(N)-11 EM(N)-11
EM(N)-11
EM(N)-11
EM(N)-11
EM(N)-11
EM(N)-11
EM(N)-11 EM(N)-11
EM(N)-11
EM(N)-11
EM(N)-11
LPEH-2(N)-4
LPEH-2(N)-4
EM(N)-11
EM(N)-11
LPEH-2(N)-4
EM(N)-11
EM(N)-11
3BL(N)-4
EM(N)-11
EM(N)-11
EM(N)-11
EM(N)-11
EM(N)-11
EM(N)-11
EM(N)-11
22 22
22 22 22
NORTH EXHIBIT
22 22
44 44 44
44 44
44 44
RETAIL OFFICE
ELEVATOR
ELV2P2E P2E
P
EM(N)-3 EM(N)-31
EM(N)-11
EM(N)-11
3BL(N)-4
3BL(N)-4
EM(N)-11
3BL(N)-4
EM(N)-11
3BL(N)-4 3BL(N)-4
3BL(N)-4 3BL(N)-4
EM(N)-11
X
8 8
DA1
DA1
DA1
STORAGE
144A
X4
B1
X5
X5
EM(N)-7
B1
EM(N)-75
B1
B1
B1
B1
B1
B1
X1
EM(N)-11
B1 a b aa bb b a
P
B1
B1
B1
B1 B1
B1
B1
B1B1 B1
B1
TRACK
LIGHTING
B1
"GB"
LIGHTING
TRACK
LIGHTING
TRACK
LIGHTING
B1
B1
TRACK
LIGHTING
B1
"GA"
LIGHTING
"GB"
LIGHTING
B1 1414 1414
2626 2525
B2
SW NW
SE NE
KEY PLAN
SCALE OF FEET
0'8' 8' 16'
SCALE A
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
132917
NAMA-216042
TITLE OF SHEETSEAL
LEGEND
GENERAL NOTES
KEY NOTES
B
IM
L in c o ln
M e m o ri a l U n d e rc ro ft L in c o ln
M e m o ri a l_ E le c v .r v t
DT
DT E46WJR
05/13/2022
EXHIBIT LEVEL - CEILING
LIGHTING - NE PARTIAL
PLAN
LINCOLN MEMORIAL REHABILITATION
NATIONAL MALL AND MEMORIAL PARKS 104
SCALE AE46
1 EXHIBIT LEVEL - CEILING LIGHTING - NE PARTIAL PLAN
1. PATCH ALL EXISTING PENETRATIONS 100 PERCENT
COMPLETE AND DRILL NEW HOLES FOR ALL REQUIRED
PENETRATIONS. ALL MODIFICATIONS TO THE BUILDING
ENVELOPE MUST BE PRESENTED GRAPHICALLY TO THE
CONTRACTING OFFICER'S REPRESENTATIVE (COR) AND
APPROVED IN WRITING BY THE COR PRIOR TO COMMENCING
ANY WORK.
2. ALL DEMO AND NEW WORK SHALL BE PHASED AS REQUIRED
TO MINIMIZE OUTAGES TO THE AFFECTED SYSTEM (S) AND
TO MINIMIZE DISRUPTION TO THE OPERATION OF THE
FACILITY. AREAS OUTSIDE THE AREA OF WORK SHALL
REMAIN UNDISTURBED.
3. ALL FACADE, COLONNADE AND ATTIC LEVEL SKYLIGHT
LIGHTING IS EXISTING TO REMAIN AND SHALL REMAIN IN
SERVICE AT ALL TIMES.
4. REFER TO DRAWING E32 FOR OVERALL VIEW.
5. REFER TO DRAWINGS E140 - E148 FOR EXHIBIT LEVEL
(OVERALL) AND CHAMBER LEVEL (ELEVATOR VESTIBULE)
LIGHTING FIXTURE SCHEDULES.
1. COORDINATE WITH ELEVATOR CONTRACTOR FOR EXACT
LOCATION OF LIGHT FIXTURE AND TOGGLE CONTROL
SWITCH PRIOR TO INSTALLATION.
2. CONNECT TYPE 'P2E' FIXTURES IN THE ELEVATOR PIT TO
THE GFI RECEPTACLE CIRCUIT IN PIT. LIGHTS SHOULD BE
120V AND SHALL CONNECTED TO THE LINE SIDE OF THE
GFI RECEPTACLE. SEE POWER PLAN FOR RECEPTACLE
LOCATION. PROVIDE THREE WAY SWITCH TO CONTROL
LIGHT FIXTURES AT ELEVATOR PIT AND AT TOP OF THE
ELEVATOR SHAFT.
3. NORMAL LIGHTING IS FED FROM PANEL LPEH-2 LOCATED AT
ROOM 154 EXHIBIT LEVEL.
4. NORMAL LIGHTING IS FED FROM PANEL 1RT(N) LOCATED AT
ROOM 131 EXHIBIT LEVEL.
5. FIXTURE CONTROLLED BY BUILT-IN PHOTOCELL.
6. PROVIDE INTEGRAL CUSTOM EXIT SIGN IN EXHIBIT AREA.
COORDINATE WITH ARCHTECT FOR EXACT SPECIFICATIONS
NO. REVISION DATE BY
B1 BID ADDENDUM 2 6/24/2022 AEI
B2 BID ADDENDUM 3 7/01/2022 AEI
B1
B2
B2
07/01/2022
| Sheets |
| E14 - EXHIBIT LEVEL - POWER - SE PARTIAL PLAN |
| E15 - EXHIBIT LEVEL - POWER - NE PARTIAL PLAN |
| E45 - EXHIBIT LEVEL - CEILING LIGHTING - SE PARTIAL PLAN |
| E46 - EXHIBIT LEVEL - CEILING LIGHTING - NE PARTIAL PLAN |
| E53 - EXHIBIT LEVEL - WALL/BACK LIGHTING - SE PARTIAL PLAN 2 |
| E54 - EXHIBIT LEVEL - WALL/BACK LIGHTING - NE PARTIAL PLAN 2 |
| E72 - PANEL SCHEDULES |
File details come from the government source that posted it. Updated .