This document defines contract line items and bid options for the NAMA 216042 Lincoln Memorial Rehabilitation project solicited by the National Park Service. The base contract includes 13 line items covering work on various levels of the memorial such as the exhibit level, chamber level, utility level and site utilities. It also includes security systems, concrete and plaster repair, temporary protections and demolition. The solicitation contains 14 bid options ranging from installation of a new north elevator, terrace grass restoration, door repair and additional soil remediation. Payment will be made using lump sums or unit prices broken down by CSI division.
View the file
Other files
Show 40 more
Latest 50 of 171 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAMA - 216042 01 27 00 - 1
082714 DEFINITION OF CONTRACT LINE ITEMS
SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS
PART 1 - GENERAL
1.1 SUMMARY
A. The intent of this section is to explain, in general, what is and what is not included in a contract line item, and the limits or cut-off points where one item ends, and another begins.
B. If no contract line item exists for a portion of the work, include the costs in a related item.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 LIST OF CONTRACT LINE ITEMS
A. Contract Line Item No. 001: Undercroft Exhibit Level and Restrooms.
1. This item consists of all work occurring on the Exhibit Level, including work to provide the North Exit, waterproofing of the Main Stair, and waterproofing and turf replacement on the Terrace Roof.
2. Payment will be made at the contract lump sum price broken down by CSI division as further described in the schedule of values.
B. Contract Line Item No. 002: Undercroft Security
1. This item consists of all work associated with relocation, replacement, and installation of the security systems for the entire building.
2. Payment will be made at the contract lump sum price broken down by CSI division as further described in the schedule of values.
C. Contract Line Item No. 003: Chamber Level
1. This item consists of all work occurring on the Chamber Level.
2. Payment will be made at the contract lump sum price broken down by CSI division as further described in the schedule of values.
D. Contract Line Item No. 004: Utility Level
1. This item consists of all work occurring on the Utility Level including rough-in for utilities for exhibit lighting (under a different contract) within the unconditioned undercroft.
2. Payment will be made at the contract lump sum price broken down by CSI division as further described in the schedule of values.
E. Contract Line Item No. 005: North Elevator
NAMA - 216042 01 27 00 - 2
1. This item consists of work associated with the installation of the North Elevator shaft.
2. Payment will be made at the contract lump sum price broken down by CSI division as further described in the schedule of values.
3. Payment will be made at the contract lump sum price.
F. Contract Line Item No. 006: Site Utilities and Landscape Elements
1. This item consists of work associated with providing upgrades and new connections of site utilities, fire department connections, re-leveling of the southeast and northeast plaza pavers, and vegetation and tree replacement.
2. Payment will be made at the contract lump sum price broken down by CSI division as further described in the schedule of values.
G. Contract Line Item No. 007: Abatement of Identified (Confirmed) Contaminated Soil in the
Raised Terrace Undercroft
1. This item consists of work associated with measures to remove six inches of soil in confirmed identified contaminated areas as shown on sheet H1.
2. Payment will be made at the contract lump sum price broken down by CSI division as further described in the schedule of values.
H. Contract Line Item No. 008: Concrete Repair
1. This item consists of work associated with measures to repair the existing concrete within the Undercroft as identified in the drawings.
2. Payment will be made using Unit Price No. 1 and Unit Price No. 3 broken down by CSI division as further described in the schedule of values.
I. Contract Line Item No. 009: Staging and Site Security
1. This item consists of work associated with providing site security, fencing, barriers, temporary protection of vegetation and trees, temporary protection of architectural features, temporary signage, and the temporary lift / ramp assembly.
2. Payment will be made at the contract lump sum price broken down by CSI division as further described in the schedule of values.
J. Contract Line Item No. 010: Attic and Roof Drains
1. This item consists of work associated with replacement of the existing roof drain line below the roof, the installation of the new outside air system and the replacement of fans and motors on the Attic Level.
2. Payment will be made at the contract lump sum price broken down by CSI division as further described in the schedule of values.
K. Contract Line Item No. 011: Plaster Repair
1. This item consists of work associated with measures to repair the existing plaster on the
Chamber Level as identified in the drawings.
2. Payment will be made using Unit Price No. 2 and Unit Price No. 4 broken down by CSI division as further described in the schedule of values.
L. Contract Line Item No. 012: Demolition
NAMA - 216042 01 27 00 - 3
1. This item consists of all demolition work in the base contract as identified in the drawings. It does not include demolition required to execute the Bid Options listed below.
2. Payment will be made at the contract lump sum price broken down by CSI division as further described in the schedule of values.
M. Contract Line Item No. 013: Temporary Protection
1. This item consists of work associated with protecting the historic fabric of the Lincoln
Memorial, including protection of the Raised Terrace wall, Stylobate, Tripods, Main
Stair, Chamber Level features, Undercroft columns and walls, and the Undercroft soil.
2. Payment will be made at the contract lump sum price broken down by CSI division as further described in the schedule of values.
3.2 LIST OF BID OPTIONS
A. Bid Option A: North Elevator, Chamber Level Vestibule and Green Room
1. This item consists of all work associated with installation of a new elevator cab, machine works and related systems in the North elevator shaft. This item also includes work associated with providing a new finished Lobby Vestibule and Green Room for the North
Elevator. Construction of the North Elevator shaft is in the base bid.
2. Payment will be made at the contract lump sum price broken down by CSI division as further described in the schedule of values.
B. Bid Option B: Restoration of the Terrace Grass
1. This item consists of work associated with replacement of the waterproofing and grass for the remainder of the Roof Terrace (southwest corner, western side, and northwest corner).
2. Payment will be made at the contract lump sum price broken down by CSI division as further described in the schedule of values.
C. Bid Option C: Historic Bronze doors and transoms Repair and Restoration
1. This item consists of work associated with repair and restoration of the existing bronze doors on the Chamber Level that lead to the four corner rooms.
2. Payment will be made at the contract lump sum price broken down by CSI division as further described in the schedule of values.
D. Bid Option D: Main Stair Tread Flipping
1. This item consists of work associated with flipping specific marble stair treads on the Main
Stair as identified in the drawings.
2. Payment will be made at the contract lump sum price broken down by CSI division as further described in the schedule of values.
E. Bid Option E: Abatement of Assumed Contaminated Soil in the Raised Terrace Undercroft
1. This item consists of work associated with measures to remove six inches of soil in assumed contaminated areas as shown on sheet H1.
2. Payment will be made at the contract lump sum price broken down by CSI division as further described in the schedule of values.
F. Bid Option F: Abatement of Assumed Contaminated Existing Beams
NAMA - 216042 01 27 00 - 4
1. This item consists of work associated with measures to provide abatement of existing beams within the Undercroft.
2. Payment will be made at the contract lump sum price broken down by CSI division as further described in the schedule of values.
G. Bid Option G: Removal of Existing VCT in USPP Room (NW corner) on Chamber Level
1. This item consists of work associated with measures to remove the existing VCT floor tile, and painted base. It also includes work associated with repairing/cleaning the (assumed) historic marble floor and base.
2. Payment will be made at the contract lump sum price broken down by CSI division as further described in the schedule of values.
H. Bid Option H: Renovation of NPS Breakroom (SW corner) on Chamber Level
1. This item consists of work associated with demolition and renovation of the existing Toilet room and NPS Breakroom located in the southwest corner on the Chamber Level.
2. Payment will be made at the contract lump sum price broken down by CSI division as further described in the schedule of values.
I. Bid Option I: Repair of the Historic Stone Door Surround on the Chamber Level
1. This item consists of work associated with repair to the existing stone door surround at the entrance to the USPP Room in the northwest corner of the Chamber Level.
2. Payment will be made at the contract lump sum price broken down by CSI division as further described in the schedule of values.
J. Bid Option J: Installation of a Vapor Barrier at the Utility Level – Raised Terrace Undercroft
1. This item consists of work associated with installation of a 30 mils vapor barrier over the exposed existing soil within the Raised Terrace Undercroft. (Approximately 17,000 SF).
Provide termination bars at all perimeter walls and columns. Cover the vapor barrier with
6” of soil of the same consistency and composition as the existing soil.
2. Payment will be made at the contract lump sum price broken down by CSI division as further described in the schedule of values.
K. Bid Option K: Installation of a Vapor Barrier at the Utility Level – Chamber Undercroft
1. This item consists of work associated with installation of a 30 mils vapor barrier over the exposed existing soil within the Chamber Undercroft. (Approximately 21,500 SF). Provide termination bars at all perimeter walls and columns. Cover the vapor barrier with 6” of soil of the same consistency and composition as the existing soil.
2. Payment will be made at the contract lump sum price broken down by CSI division as further described in the schedule of values.
L. Bid Option L: Unit Price No. 001 Concrete Spall Repair
1. This item consists of work associated with measures to repair the existing concrete within the Undercroft as identified in the drawings.
2. Payment will be made at the Unit Price broken down by CSI division as further described in the schedule of values.
M. Bid Option M: Unit Price No. 002 Plaster Repair
1. This item consists of work associated with measures to repair the existing plaster on the
Chamber Level as identified in the drawings.
2. Payment will be made at the Unit Price broken down by CSI division as further described in the schedule of values.
NAMA - 216042 01 27 00 - 5
N. Bid Option N: Unit Price No. 003 Concrete Crack Repair
1. This item consists of work associated with measures to repair the existing concrete within the Undercroft as identified in the drawings.
2. Payment will be made at the Unit Price broken down by CSI division as further described in the schedule of values.
O. Bid Option O: Unit Price No. 004 Plaster Crack Repair
1. This item consists of work associated with measures to repair the existing plaster on the
Chamber Level as identified in the drawings.
2. Payment will be made at the Unit Price broken down by CSI division as further described in the schedule of values.
END OF SECTION 01 27 00