E54_-_EXHIBIT_LEVEL_-_WALL-BACK_LIGHTING_-_NE_PARTIAL_PLAN_2_0009.pdf
PDF 208 KB Posted
- Attached to
- NAMA 216042 - Lincoln Memorial Rehabilitation
- Solicitation number
- 140P2022R0046
About this file
This document package includes construction drawings and specifications for lighting upgrades at the Lincoln Memorial in Washington, D.C. The drawings show existing and proposed lighting layouts and fixtures for the exhibit level and include notes outlining the scope of work such as phasing requirements and coordination with existing systems. This work is being procured under solicitation number 140P2022R0046 by the National Park Service for the Lincoln Memorial Rehabilitation project numbered NAMA 216042. The solicitation is for lighting installation and related electrical work at the Lincoln Memorial to upgrade the exhibit and chamber levels. The response due date and award information are not provided in this document package.
View the file
Other files
Show 40 more
Latest 50 of 171 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12 14 15 17 18
G
L
M
O
P
F
H
J
K
N
NORTH SALLY PORT EXIT
WORK ROOM
PRE-SCREENING
NORTH ELEVATOR LOBBY
EXHIBIT SALLY PORT
STAIR 1
ST1.1
CORR
E
E
/1 E48
/1 E46
DW1g
DW1f
DW1e
DW1dDW1bDW1a
NORTH VESTIBULE
LPEH-2(N)-4
LPEH-2(N)-5
LPEH-2(N)-5
LPEH-2(N)-5LPEH-2(N)-5LPEH-2(N)-4
SW NW
SE NE
KEY PLAN
SCALE OF FEET
0'8' 8' 16'
SCALE A
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
132917
NAMA-216042
TITLE OF SHEETSEAL
LEGEND
GENERAL NOTES
KEY NOTES
B
IM
L in c o ln
M e m o ri a l U n d e rc ro ft L in c o ln
M e m o ri a l_ E le c v .r v t
DT
DT E54WJR
05/13/2022
EXHIBIT LEVEL -
WALL/BACK LIGHTING -
NE PARTIAL PLAN 2
LINCOLN MEMORIAL REHABILITATION
NATIONAL MALL AND MEMORIAL PARKS 112SCALE AE54
1 EXHIBIT LEVEL - WALL/BACK LIGHTING - NE PARTIAL PLAN 2
1. PATCH ALL EXISTING PENETRATIONS 100 PERCENT
COMPLETE AND DRILL NEW HOLES FOR ALL REQUIRED
PENETRATIONS. ALL MODIFICATIONS TO THE BUILDING
ENVELOPE MUST BE PRESENTED GRAPHICALLY TO THE
CONTRACTING OFFICER'S REPRESENTATIVE (COR) AND
APPROVED IN WRITING BY THE COR PRIOR TO COMMENCING
ANY WORK.
2. ALL DEMO AND NEW WORK SHALL BE PHASED AS REQUIRED
TO MINIMIZE OUTAGES TO THE AFFECTED SYSTEM (S) AND
TO MINIMIZE DISRUPTION TO THE OPERATION OF THE
FACILITY. AREAS OUTSIDE THE AREA OF WORK SHALL
REMAIN UNDISTURBED.
3. ALL FACADE, COLONNADE AND ATTIC LEVEL SKYLIGHT
LIGHTING IS EXISTING TO REMAIN AND SHALL REMAIN IN
SERVICE AT ALL TIMES.
4. REFER TO DRAWING E33 FOR OVERALL VIEW.
5. REFER TO DRAWINGS E140 - E148 FOR EXHIBIT LEVEL
(OVERALL) AND CHAMBER LEVEL (ELEVATOR VESTIBULE)
LIGHTING FIXTURE SCHEDULES.
NO. REVISION DATE BY
B1 BID ADDENDUM 3 7/01/2022 AEI
B1
B1
07/01/2022
| Sheets |
| E14 - EXHIBIT LEVEL - POWER - SE PARTIAL PLAN |
| E15 - EXHIBIT LEVEL - POWER - NE PARTIAL PLAN |
| E45 - EXHIBIT LEVEL - CEILING LIGHTING - SE PARTIAL PLAN |
| E46 - EXHIBIT LEVEL - CEILING LIGHTING - NE PARTIAL PLAN |
| E53 - EXHIBIT LEVEL - WALL/BACK LIGHTING - SE PARTIAL PLAN 2 |
| E54 - EXHIBIT LEVEL - WALL/BACK LIGHTING - NE PARTIAL PLAN 2 |
| E72 - PANEL SCHEDULES |
File details come from the government source that posted it. Updated .