E14_-_EXHIBIT_LEVEL_-_POWER_-_SE_PARTIAL_PLAN_0009.pdf
PDF 306 KB Posted
- Attached to
- NAMA 216042 - Lincoln Memorial Rehabilitation
- Solicitation number
- 140P2022R0046
About this file
This document contains plans and specifications for electrical work at the Lincoln Memorial as part of solicitation number 140P2022R0046 from the National Park Service. The plans show the location of power outlets, lighting, equipment connections, and other electrical details for renovations to the exhibit level in the southeast and northeast areas. Key aspects of the electrical work include installing ground fault circuit interrupters, junction boxes for automatic flush valves and door operators, and power connections for fin tube radiators and exhibit audiovisual equipment. The plans provide information necessary for contractors to understand the scope of electrical renovations and prepare responses to the solicitation.
View the file
Other files
Show 40 more
Latest 50 of 171 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JJ
J
J
J J
J
J J J
J
J J
J
J
W P
,G F
C I
J
J
J
J
J
J
J
J
J
J J
J
J
J J J
J J J
J J
J J
J
J J
M M M M M
1S(X)
REMOTE FIRE ALARM
ANNUNCIATOR PANEL
1BH(N)
HAND DRYER +
SOAP DISPENSER
(TYP.)
P1(N)
1 2 3 4 7
G
L
M
O
P
5 6 8 9 10 11
F
H
J
K
N 1RT(N)
MEN'S RESTROOM
JANITOR
MEN'S VESTIBULE
UNISEX TOILET
FAMILY TOILET
FAMILY TOILET
FIRE CONTROL ROOM
VESTIBULE
110A
SERVICES CORRIDOR
WOMEN'S VESTIBULE
JANITOR
WOMEN'S TOILETS
546 SF
SOUTH EXHIBIT
ELEVATOR
ELV1
SOUTH ELEVATOR LOBBY
SOUTH VESTIBULE
SOUTH SALLY PORT EXIT
IMMERSIVE FORUM
EXHIBIT SPINE
RETAIL STORAGE
192 SF
RETAIL
/1 E16
E
GFCI
GFCI
GFCI
ADULT
CHANGING
STATION
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
SF
SF
1BH(N)-1,3,51BH(N)-2,4,6
1BH(N)-7,9
1BH(N)-8,10 1BH(N)-11,13
1BH(N)-12,14 1BH(N)-15,17
1RT(N)-3
1RT(N)-3
1RT(N)-3
1RT(N)-3
1RT(N)-4 1RT(N)-4
1RT(N)-4
1RT(N)-4
1RT(N)-8 1RT(N)-6
1RT(N)-6
CR
1RT(N)-5
GFCI
EM(N)-1
23 25 27 29 3133 P1(N)-13
P1(N)-13
P1(N)-13 P1(N)-13
P1(N)-13
P1(N)-13
1 3 5 7 9 11
1012 1416
18 20 22 24
P1(N)-13
P1(N)-13
P1(N)-13
P1(N)-2 P1(N)-2
P1(N)-32
P1(N)-32
P1(N)-32
P1(N)-32
P1(N)-15
P1(N)-15
P1(N)-15 P1(N)-15
P1(N)-15 P1(N)-4
P1(N)-4
P1(N)-4
P1(N)-6
P1(N)-6
P1(N)-6
P1(N)-6
P1(N)-21
P1(N)-21
PPEH-2(N)-2 PPEH-2(N)-2
PPEH-2(N)-2
P1(N)-17
P1(N)-17
P1(N)-17 P1(N)-17
AV(N)-4
AV(N)-7
AV(N)-2 AV(N)-6
AV(N)-5
AV(N)-10
AV(N)-11
AV(N)-8
AV(N)-13
AV(N)-16
AV(N)-20
AV(N)-12
AV(N)-15
AV(N)-17
GFI
P1(N)-19
P1(N)-8 P1(N)-8
AV(N)-1
PPEH-2(N)-9
PPEH-2(N)-9
PPEH-2(N)-11
PPEH-2(N)-11
PPEH-2(N)-11
PPEH-2(N)-13
PPEH-2(N)-13
AV(N)-9
PPEH-2(N)-15 PPEH-2(N)-19 PPEH-2(N)-23
AV(N)-3
AV(N)-14
AV(N)-18
GFCI
GFCI
GFCIGFCI
P1(N)-26 P1(N)-26 P1(N)-26
P1(N)-26 P1(N)-26 P1(N)-26
P1(N)-28 P1(N)-28
P1(N)-28 P1(N)-28
P1(N)-28
P1(N)-28 P1(N)-28
1BH(N)-32,34,36
FTR
CUH
GFCI
(TYP.)
PPEH-2(N)-25PPEH-2(N)-21
PPEH-2(N)-2
PPEH-2(N)-17
P1(N)-21
P1(N)-21
1RT(N)-4 1RT(N)-8
1RT(N)-8
1RT(N)-8
1RT(N)-6
1RT(N)-61RT(N)-61RT(N)-41RT(N)-4
1BH(N)-37,39
GLASS
HEATER
GLASS
HEATER
1BH(N)-38,40
1BH(N)-41,43
GLASS
HEATER
GLASS
HEATER
1BH(N)-42,44
GLASS
HEATER
1BH(N)-45,47
1BH(N)-49
B1
B1
B1
B1
B1
GLASS HEATER
CONTROL PANEL
B2
B2 B2
B2
B2 B2 B2
B2
B2
B2B2
B2B2
B2
B2
TCOIL
SYSTEM 28
REFER TO "TELECOM," "AUDIO VISUAL," "SECURITY," AND "EXHIBIT SPECIALITY DESIGN" DRAWINGS
FOR EXACT LOCATIONS, QUANTITIES, AND REQUIREMENTS FOR ALL AUDIOVISUAL,
TELECOMMUNICATIONS, SECURITY, INTERPRETIVE, AND SOUND MASKING SYSTEMS DEVICES AND
OUTLETS. DIVISION 26 TO PROVIDE BOXES AND EMPTY CONDUITS WITH PULL STRINGS AS
REQUIRED. COORDINATE REQUIREMENTS WITH THE DIVISION 27 AND 28 REQUIREMENTS AND
COORDINATE FINAL LOCATIONS WITH CONTRACTING OFFICER PRIOR TO INSTALLATION.
SW NW
SE NE
KEY PLAN
SCALE OF FEET
0'8' 8' 16'
SCALE A
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
132917
NAMA-216042
TITLE OF SHEETSEAL
LEGEND
GENERAL NOTES
KEY NOTES
B
IM
L in c o ln
M e m o ri a l U n d e rc ro ft L in c o ln
M e m o ri a l_ E le c v .r v t
DT
DT
E14WJR
05/13/2022
EXHIBIT LEVEL - POWER -
SE PARTIAL PLAN
LINCOLN MEMORIAL REHABILITATION
NATIONAL MALL AND MEMORIAL PARKS 88
SCALE AE14
1 EXHIBIT LEVEL - POWER - SE PARTIAL PLAN
1. PATCH ALL EXISTING PENETRATIONS 100 PERCENT
COMPLETE AND DRILL NEW HOLES FOR ALL REQUIRED
PENETRATIONS. ALL MODIFICATIONS TO THE BUILDING
ENVELOPE MUST BE PRESENTED GRAPHICALLY TO THE
CONTRACTING OFFICER'S REPRESENTATIVE (COR) AND
APPROVED IN WRITING BY THE COR PRIOR TO COMMENCING
ANY WORK.
2. ALL DEMO AND NEW WORK SHALL BE PHASED AS REQUIRED
TO MINIMIZE OUTAGES TO THE AFFECTED SYSTEM(S) AND
TO MINIMIZE DISRUPTION TO THE OPERATION OF THE
FACILITY. AREAS OUTSIDE THE AREA OF WORK SHALL
REMAIN UNDISTURBED.
3. ALL FACADE, COLONNADE AND ATTIC LEVEL SKYLIGHT
LIGHTING IS EXISTING TO REMAIN AND SHALL REMAIN IN
SERVICE AT ALL TIMES.
4. REFER TO DRAWING E2 FOR OVERALL VIEW.
5. POWER CONNECTIONS LABELED FTR REPRESENT
ELECTRICAL FIN TUBE RADIATORS.
1. ALL OF THESE RECEPTACLES ARE TO BE GFCI TYPE AND FEED
FROM PANEL P1(N).
2. REFEED EXISTING PANEL FROM WEST BUSWAY.
3. JUNCTION BOX FOR AUTOMATIC FLUSH VALVES. PROVIDE 120V
AC/24 V AC TRANSFORMER FOR SENSOR ACTIVATED
FLUSHOMETER. CONNECT UP TO 8 WATER CLOSET OR URINAL
FLUSHOMETERS. SEE PLUMBING SCHEDULE FOR
SPECIFICATIONS.
4. JUNCTION BOX FOR DOOR OPERATOR.
5. CONNECT TYPE 'P2E' FIXTURES IN THE ELEVATOR PIT TO THE
GFI RECEPTACLE CIRCUIT IN PIT.
6. PROVIDE ROUGH-IN FOR ADULT CHANGING TABLE (PRESSALIT
CARE 1000 #R8402/R8403). PROVIDE EMPTY CONDUIT WITH
PULL STRING FROM PANEL (P1) FOR FUTURE CONNECTION.
7. DISCONNECT SWITCH FOR FINTUBE RADIATOR EQUIPMENT.
POWER CONNECTION FOR FINTUBE RADIATOR SHALL BE
BOTTOM FED (FROM FLOOR BELOW). DISCONNECT SWITCH
SHALL BE LOCKABLE TYPE UNDER OPEN POSITION MARKED AS
“OFF” POSITION AS REQUIRED PER NEC 424.19 (A).
NO. REVISION DATE BY
B1 BID ADDENDUM 2 6/24/2022 AEI
B2 BID ADDENDUM 3 7/01/2022 AEI
8. T-COIL EQUIPMENT FOR IMMERSIVE FORUM AREA, BOD
AMPETRONIC C SERIES DSP PERIMETER AND MULITLOOP
DRIVER SYSTEM. COORDINATE WITH EXHIBIT DESIGN PACKAGE
DRAWINGS FOR LOOP CONFIGURATION AND SPECIFICATIONS.
B2
07/01/2022
| Sheets |
| E14 - EXHIBIT LEVEL - POWER - SE PARTIAL PLAN |
| E15 - EXHIBIT LEVEL - POWER - NE PARTIAL PLAN |
| E45 - EXHIBIT LEVEL - CEILING LIGHTING - SE PARTIAL PLAN |
| E46 - EXHIBIT LEVEL - CEILING LIGHTING - NE PARTIAL PLAN |
| E53 - EXHIBIT LEVEL - WALL/BACK LIGHTING - SE PARTIAL PLAN 2 |
| E54 - EXHIBIT LEVEL - WALL/BACK LIGHTING - NE PARTIAL PLAN 2 |
| E72 - PANEL SCHEDULES |
File details come from the government source that posted it. Updated .