About this file
This document contains an electrical power plan and lighting plan for the exhibit level of the Lincoln Memorial rehabilitation project. Key details include that the project involves refurbishing the undercroft and exhibit level of the Lincoln Memorial, with the solicitation being issued by the National Park Service National Office. The power plan outlines existing electrical infrastructure to remain in service, including facade, colonnade and attic level skylight lighting. It provides notes on proposed work such as refeeding an existing panel from the west busway and installing T-coil equipment for an immersive forum area. Bid addendums provide revisions to the electrical, ceiling lighting and wall lighting plans for the exhibit level.
View the file
Other files
Show 40 more
Latest 50 of 171 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J J
J
J
J
J
W P
,G F
C I
J
J
J
M
M
J
M
1N(X)
MP(N)
FED FROM
HP-5 ON
UTILITY
LEVEL
15 17 18
G
L
M
O
P
F
H
J
K
N
RETAIL OFFICE
NORTH SALLY PORT EXIT
NORTH EXHIBIT
NORTH ELEVATOR LOBBY
ELEVATOR
ELV2
WORK ROOM
BOH ACCESS
STAIR 1
ST1.1
CORR
EXHIBIT SALLY PORT
POST SCREENING
PRE-SCREENING
141NORTH VESTIBULE
/1 E17
E
CR
FTR
FTR
FTR
FTR
FTR
FTR
OFFICE
SF
SF
CUH
1BH(N)-16,18
1BH(N)-19,21,23
1BH(N)-24,26,28
1BH(N)-25,27,29
AC
LPEH-2(N)
PPEH-2(N)
1RT(N)-6
CR
1RT(N)-5
1RT(N)-5
1RT(N)-7
1RT(N)-7
EM(N)-33
PPEH-2(N)-1
PPEH-2(N)-1
PPEH-2(N)-30
PPEH-2(N)-30
PPEH-2(N)-30
PPEH-2(N)-30
PPEH-2(N)-4
PPEH-2(N)-4
PPEH-2(N)-4
PPEH-2(N)-4
PPEH-2(N)-6
PPEH-2(N)-6
PPEH-2(N)-6
PPEH-2(N)-6
GFCI
STORAGE
144A
PPEH-2(N)-3
PPEH-2(N)-3
PPEH-2(N)-3
PPEH-2(N)-3
PPEH-2(N)-3 PPEH-2(N)-3
PPEH-2(N)-5
PPEH-2(N)-5
PPEH-2(N)-5
PPEH-2(N)-5
PPEH-2(N)-5 PPEH-2(N)-5
PPEH-2(N)-8
AV(N)-19 PPEH-2(N)-8
PPEH-2(N)-8
TRACE
DECTOR
PPEH-2(N)-12
PPEH-2(N)-10
PPEH-2(N)-10
AV(N)-22
PPEH-2(N)-10
PPEH-2(N)-14,16
PPEH-2(N)-14,16
PPEH-2(N)-18,20
PPEH-2(N)-18,20PPEH-2(N)-22,24
PPEH-2(N)-22,24PPEH-2(N)-26,28 PPEH-2(N)-26,28
AV(N)-24
AV(N)-21
PPEH-2(N)-7
PPEH-2(N)-7 PPEH-2(N)-7
PPEH-2(N)-7
PPEH-2(N)-7
WH-3 PP-S(N)-16
1BH(N)-20,22
CUH
1BH(N)-31,33,35
(TYP.)
PPEH-2(N)-2
1RT(N)-6
SECURITY
MONITOR
PPEH-2(N)-27
PPEH-2(N)-30
LIGHTING CONTROL PANEL
1BH(N)-46,48
GLASS
HEATER
B1
B2
B2
B2
TCOIL
SYSTEM5
B2
B2
B2
REFER TO "TELECOM," "AUDIO VISUAL," "SECURITY," AND "EXHIBIT SPECIALITY DESIGN" DRAWINGS
FOR EXACT LOCATIONS, QUANTITIES, AND REQUIREMENTS FOR ALL AUDIOVISUAL,
TELECOMMUNICATIONS, SECURITY, INTERPRETIVE, AND SOUND MASKING SYSTEMS DEVICES AND
OUTLETS. DIVISION 26 TO PROVIDE BOXES AND EMPTY CONDUITS WITH PULL STRINGS AS
REQUIRED. COORDINATE REQUIREMENTS WITH THE DIVISION 27 AND 28 REQUIREMENTS AND
COORDINATE FINAL LOCATIONS WITH CONTRACTING OFFICER PRIOR TO INSTALLATION.
SW NW
SE NE
KEY PLAN
SCALE OF FEET
0'8' 8' 16'
SCALE A
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
132917
NAMA-216042
TITLE OF SHEETSEAL
LEGEND
GENERAL NOTES
KEY NOTES
B
IM
L in c o ln
M e m o ri a l U n d e rc ro ft L in c o ln
M e m o ri a l_ E le c v .r v t
DT
DT
E15WJR
05/13/2022
EXHIBIT LEVEL - POWER -
NE PARTIAL PLAN
LINCOLN MEMORIAL REHABILITATION
NATIONAL MALL AND MEMORIAL PARKS 89
SCALE AE15
1 EXHIBIT LEVEL - POWER - NE PARTIAL PLAN
1. PATCH ALL EXISTING PENETRATIONS 100 PERCENT
COMPLETE AND DRILL NEW HOLES FOR ALL REQUIRED
PENETRATIONS. ALL MODIFICATIONS TO THE BUILDING
ENVELOPE MUST BE PRESENTED GRAPHICALLY TO THE
CONTRACTING OFFICER'S REPRESENTATIVE (COR) AND
APPROVED IN WRITING BY THE COR PRIOR TO COMMENCING
ANY WORK.
2. ALL DEMO AND NEW WORK SHALL BE PHASED AS REQUIRED
TO MINIMIZE OUTAGES TO THE AFFECTED SYSTEM(S) AND TO
MINIMIZE DISRUPTION TO THE OPERATION OF THE FACILITY.
AREAS OUTSIDE THE AREA OF WORK SHALL REMAIN
UNDISTURBED.
3. ALL FACADE, COLONNADE AND ATTIC LEVEL SKYLIGHT
LIGHTING IS EXISTING TO REMAIN AND SHALL REMAIN IN
SERVICE AT ALL TIMES.
4. REFER TO DRAWING E2 FOR OVERALL VIEW.
POWER CONNECTIONS LABELED FTR REPRESENT
ELECTRICAL FIN TUBE RADIATORS.
1. REFEED EXISTING PANEL FROM WEST BUSWAY.
2. JUNCTION BOX FOR DOOR OPERATOR.
3. CONNECT TYPE 'P2E' FIXTURES IN THE ELEVATOR PIT TO THE
GFI RECEPTACLE CIRCUIT IN PIT. LIGHTS SHOULD BE 120V
AND SHALL CONNECTED TO THE LINE SIDE OF THE GFI
RECEPTACLE. SEE POWER PLAN FOR RECEPTACLE LOCATION.
PROVIDE THREE WAY SWITCH TO CONTROL LIGHT FIXTURES
AT ELEVATOR PIT AND AT TOP OF THE ELEVATOR SHAFT.
4. DISCONNECT SWITCH FOR FINTUBE RADIATOR EQUIPMENT.
POWER CONNECTION FOR FINTUBE RADIATOR SHALL BE
BOTTOM FED (FROM FLOOR BELOW). DISCONNECT SWITCH
SHALL BE LOCKABLE TYPE UNDER OPEN POSITION OR
MARKED AS “OFF” POSITION AS REQUIRED PER NEC 424.19 (A).
5. T-COIL EQUIPMENT FOR IMMERSIVE FORUM AREA, BOD
AMPETRONIC C SERIES DSP PERIMETER AND MULITLOOP
DRIVER SYSTEM. COORDINATE WITH EXHIBIT DESIGN
PACKAGE DRAWINGS FOR LOOP CONFIGURATION AND
SPECIFICATIONS.
NO. REVISION DATE BY
B1 BID ADDENDUM 2 6/24/2022 AEI
B2 BID ADDENDUM 3 7/01/2022 AEI
B2
07/01/2022
| Sheets |
| E14 - EXHIBIT LEVEL - POWER - SE PARTIAL PLAN |
| E15 - EXHIBIT LEVEL - POWER - NE PARTIAL PLAN |
| E45 - EXHIBIT LEVEL - CEILING LIGHTING - SE PARTIAL PLAN |
| E46 - EXHIBIT LEVEL - CEILING LIGHTING - NE PARTIAL PLAN |
| E53 - EXHIBIT LEVEL - WALL/BACK LIGHTING - SE PARTIAL PLAN 2 |
| E54 - EXHIBIT LEVEL - WALL/BACK LIGHTING - NE PARTIAL PLAN 2 |
| E72 - PANEL SCHEDULES |
File details come from the government source that posted it. Updated .