This document contains an electrical power plan and lighting plan for the exhibit level of the Lincoln Memorial rehabilitation project. Key details include that the project involves refurbishing the undercroft and exhibit level of the Lincoln Memorial, with the solicitation being issued by the National Park Service National Office. The power plan outlines existing electrical infrastructure to remain in service, including facade, colonnade and attic level skylight lighting. It provides notes on proposed work such as refeeding an existing panel from the west busway and installing T-coil equipment for an immersive forum area. Bid addendums provide revisions to the electrical, ceiling lighting and wall lighting plans for the exhibit level.

View the file

Other files

File Type Posted
Sol_140P2022R0046_Amd_0011.pdf PDF
Sol_140P2022R0046_Amd_0010.pdf PDF
05_7000_-_DECORATIVE_METAL_0009.pdf PDF
28_05_00_01_Common_Results_for_Elect_Sec_Add_3_0009.pdf PDF
A31_-_EXHIBIT_LEVEL_RCP_0009.pdf PDF
M210_-_UTILITY_LEVEL_-_FIRE_PROTECTION_-_NW_PARTIAL_PLAN_0009.pdf PDF
A154_-_FINISH_SCHEDULE_0009.pdf PDF
01_2700_-_Contract_Line_Items_0009.pdf PDF
A101_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_SCREENING_0009.pdf PDF
G6_0_(ADDENDUM_3)_0009.pdf PDF
G8_1_(ADDENDUM_3)_0009.pdf PDF
A82_-_INTERIOR_ELEVATIONS_-_ELEVATORS_0009.pdf PDF
01_3591_-_Historic_Preservation_Treatment_0009.pdf PDF
14_2100_Hydraulic_Elevators_0009.pdf PDF
E72_-_PANEL_SCHEDULES_0009.pdf PDF
C16_(ADDENDUM_3)_0009.pdf PDF
A128_-_INTERIOR_ELEVATIONS_-_FAMILY___UNISEX_TOILETS_0009.pdf PDF
E390_-_UTILITY_LEVEL_-_ENLARGED_PLAN__-_Addendum_3_0009.pdf PDF
07_1413_-_HOT_FLUID-APPLIED_RUBBERIZED_ASPHALT_WATERPROOFING_0009.pdf PDF
E45_-_EXHIBIT_LEVEL_-_CEILING_LIGHTING_-_SE_PARTIAL_PLAN_0009.pdf PDF
A100_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_ENTRY_VESTIBULES_0009.pdf PDF
A104_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_SOUTH_EXHIBIT_0009.pdf PDF
A99_-_CHAMBER_LEVEL_-_ENLARGED_PLANS_0009.pdf PDF
G11_-_TEMPORARY_PROTECTION_-_INTERIOR_-_EXHIBIT_LEVEL_0009.pdf PDF
A107_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_TOILET_0009.pdf PDF
E46_-_EXHIBIT_LEVEL_-_CEILING_LIGHTING_-_NE_PARTIAL_PLAN_0009.pdf PDF
Sol_140P2022R0046_Amd_0009.pdf PDF
A30_-_UTILITY_LEVEL_RCP_0009.pdf PDF
A105_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_RETAIL_0009.pdf PDF
A108_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_UNISTRUT_FRAME_0009.pdf PDF
A127_-_INTERIOR_ELEVATIONS_-_WOMEN_S___MEN_S_TOILETS_0009.pdf PDF
E54_-_EXHIBIT_LEVEL_-_WALL-BACK_LIGHTING_-_NE_PARTIAL_PLAN_2_0009.pdf PDF
G10_-_TEMPORARY_PROTECTION_-_INTERIOR_-_UTILITY_LEVEL_0009.pdf PDF
A103_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_CENTRAL_EXHIBIT_0009.pdf PDF
A102_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_NORTH_EXHIBIT_0009.pdf PDF
E14_-_EXHIBIT_LEVEL_-_POWER_-_SE_PARTIAL_PLAN_0009.pdf PDF
M208_-_UTILITY_LEVEL_-_FIRE_PROTECTION_-_NE_PARTIAL_PLAN_0009.pdf PDF
E361_-_SECURITY_DETAILS_-_Addendum_3_0009.pdf PDF
A106_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_NORTH_EXIT_AND_BREAK_ROOM_0009.pdf PDF
A153_-_MATERIAL_SCHEDULE_0009.pdf PDF
A51_-_NORTH___SOUTH_ELEVATIONS_0009.pdf PDF
01_1100_-_Summary_of_Work_0009.pdf PDF
M201_-_UTILITY_LEVEL_-_FIRE_PROTECTION_PLAN_0009.pdf PDF
E360_-_SECURITY_DETAILS_-_Addendum_3_0009.pdf PDF
E53_-_EXHIBIT_LEVEL_-_WALL-BACK_LIGHTING_-_SE_PARTIAL_PLAN_2_0009.pdf PDF
C31_(ADDENDUM_3)_0009.pdf PDF
Sol_140P2022R0046_Amd_0008.pdf PDF
NAMA_LINC_216042_Bid_Questions_and_Responses_Vol_3_0008.pdf PDF
B08_Solit_Attachment__PriceSched-Rev_070522_0008.xlsx XLSX spreadsheet
Sol_140P2022R0046_Amd_0007.pdf PDF
Show 40 more

Latest 50 of 171 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J J

J

J

J

J

W P

,G F

C I

J

J

J

M

M

J

M

1N(X)

MP(N)

FED FROM

HP-5 ON

UTILITY

LEVEL

15 17 18

G

L

M

O

P

F

H

J

K

N

RETAIL OFFICE

NORTH SALLY PORT EXIT

NORTH EXHIBIT

NORTH ELEVATOR LOBBY

ELEVATOR

ELV2

WORK ROOM

BOH ACCESS

STAIR 1

ST1.1

CORR

EXHIBIT SALLY PORT

POST SCREENING

PRE-SCREENING

141NORTH VESTIBULE

/1 E17

E

CR

FTR

FTR

FTR

FTR

FTR

FTR

OFFICE

SF

SF

CUH

1BH(N)-16,18

1BH(N)-19,21,23

1BH(N)-24,26,28

1BH(N)-25,27,29

AC

LPEH-2(N)

PPEH-2(N)

1RT(N)-6

CR

1RT(N)-5

1RT(N)-5

1RT(N)-7

1RT(N)-7

EM(N)-33

PPEH-2(N)-1

PPEH-2(N)-1

PPEH-2(N)-30

PPEH-2(N)-30

PPEH-2(N)-30

PPEH-2(N)-30

PPEH-2(N)-4

PPEH-2(N)-4

PPEH-2(N)-4

PPEH-2(N)-4

PPEH-2(N)-6

PPEH-2(N)-6

PPEH-2(N)-6

PPEH-2(N)-6

GFCI

STORAGE

144A

PPEH-2(N)-3

PPEH-2(N)-3

PPEH-2(N)-3

PPEH-2(N)-3

PPEH-2(N)-3 PPEH-2(N)-3

PPEH-2(N)-5

PPEH-2(N)-5

PPEH-2(N)-5

PPEH-2(N)-5

PPEH-2(N)-5 PPEH-2(N)-5

PPEH-2(N)-8

AV(N)-19 PPEH-2(N)-8

PPEH-2(N)-8

TRACE

DECTOR

PPEH-2(N)-12

PPEH-2(N)-10

PPEH-2(N)-10

AV(N)-22

PPEH-2(N)-10

PPEH-2(N)-14,16

PPEH-2(N)-14,16

PPEH-2(N)-18,20

PPEH-2(N)-18,20PPEH-2(N)-22,24

PPEH-2(N)-22,24PPEH-2(N)-26,28 PPEH-2(N)-26,28

AV(N)-24

AV(N)-21

PPEH-2(N)-7

PPEH-2(N)-7 PPEH-2(N)-7

PPEH-2(N)-7

PPEH-2(N)-7

WH-3 PP-S(N)-16

1BH(N)-20,22

CUH

1BH(N)-31,33,35

(TYP.)

PPEH-2(N)-2

1RT(N)-6

SECURITY

MONITOR

PPEH-2(N)-27

PPEH-2(N)-30

LIGHTING CONTROL PANEL

1BH(N)-46,48

GLASS

HEATER

B1

B2

B2

B2

TCOIL

SYSTEM5

B2

B2

B2

REFER TO "TELECOM," "AUDIO VISUAL," "SECURITY," AND "EXHIBIT SPECIALITY DESIGN" DRAWINGS

FOR EXACT LOCATIONS, QUANTITIES, AND REQUIREMENTS FOR ALL AUDIOVISUAL,

TELECOMMUNICATIONS, SECURITY, INTERPRETIVE, AND SOUND MASKING SYSTEMS DEVICES AND

OUTLETS. DIVISION 26 TO PROVIDE BOXES AND EMPTY CONDUITS WITH PULL STRINGS AS

REQUIRED. COORDINATE REQUIREMENTS WITH THE DIVISION 27 AND 28 REQUIREMENTS AND

COORDINATE FINAL LOCATIONS WITH CONTRACTING OFFICER PRIOR TO INSTALLATION.

SW NW

SE NE

KEY PLAN

SCALE OF FEET

0'8' 8' 16'

SCALE A

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

TITLE OF SHEET

OF

132917

NAMA-216042

TITLE OF SHEETSEAL

LEGEND

GENERAL NOTES

KEY NOTES

B

IM

L in c o ln

M e m o ri a l U n d e rc ro ft L in c o ln

M e m o ri a l_ E le c v .r v t

DT

DT

E15WJR

05/13/2022

EXHIBIT LEVEL - POWER -

NE PARTIAL PLAN

LINCOLN MEMORIAL REHABILITATION

NATIONAL MALL AND MEMORIAL PARKS 89

SCALE AE15

1 EXHIBIT LEVEL - POWER - NE PARTIAL PLAN

1. PATCH ALL EXISTING PENETRATIONS 100 PERCENT

COMPLETE AND DRILL NEW HOLES FOR ALL REQUIRED

PENETRATIONS. ALL MODIFICATIONS TO THE BUILDING

ENVELOPE MUST BE PRESENTED GRAPHICALLY TO THE

CONTRACTING OFFICER'S REPRESENTATIVE (COR) AND

APPROVED IN WRITING BY THE COR PRIOR TO COMMENCING

ANY WORK.

2. ALL DEMO AND NEW WORK SHALL BE PHASED AS REQUIRED

TO MINIMIZE OUTAGES TO THE AFFECTED SYSTEM(S) AND TO

MINIMIZE DISRUPTION TO THE OPERATION OF THE FACILITY.

AREAS OUTSIDE THE AREA OF WORK SHALL REMAIN

UNDISTURBED.

3. ALL FACADE, COLONNADE AND ATTIC LEVEL SKYLIGHT

LIGHTING IS EXISTING TO REMAIN AND SHALL REMAIN IN

SERVICE AT ALL TIMES.

4. REFER TO DRAWING E2 FOR OVERALL VIEW.

POWER CONNECTIONS LABELED FTR REPRESENT

ELECTRICAL FIN TUBE RADIATORS.

1. REFEED EXISTING PANEL FROM WEST BUSWAY.

2. JUNCTION BOX FOR DOOR OPERATOR.

3. CONNECT TYPE 'P2E' FIXTURES IN THE ELEVATOR PIT TO THE

GFI RECEPTACLE CIRCUIT IN PIT. LIGHTS SHOULD BE 120V

AND SHALL CONNECTED TO THE LINE SIDE OF THE GFI

RECEPTACLE. SEE POWER PLAN FOR RECEPTACLE LOCATION.

PROVIDE THREE WAY SWITCH TO CONTROL LIGHT FIXTURES

AT ELEVATOR PIT AND AT TOP OF THE ELEVATOR SHAFT.

4. DISCONNECT SWITCH FOR FINTUBE RADIATOR EQUIPMENT.

POWER CONNECTION FOR FINTUBE RADIATOR SHALL BE

BOTTOM FED (FROM FLOOR BELOW). DISCONNECT SWITCH

SHALL BE LOCKABLE TYPE UNDER OPEN POSITION OR

MARKED AS “OFF” POSITION AS REQUIRED PER NEC 424.19 (A).

5. T-COIL EQUIPMENT FOR IMMERSIVE FORUM AREA, BOD

AMPETRONIC C SERIES DSP PERIMETER AND MULITLOOP

DRIVER SYSTEM. COORDINATE WITH EXHIBIT DESIGN

PACKAGE DRAWINGS FOR LOOP CONFIGURATION AND

SPECIFICATIONS.

NO. REVISION DATE BY

B1 BID ADDENDUM 2 6/24/2022 AEI

B2 BID ADDENDUM 3 7/01/2022 AEI

B2

07/01/2022

Sheets
E14 - EXHIBIT LEVEL - POWER - SE PARTIAL PLAN
E15 - EXHIBIT LEVEL - POWER - NE PARTIAL PLAN
E45 - EXHIBIT LEVEL - CEILING LIGHTING - SE PARTIAL PLAN
E46 - EXHIBIT LEVEL - CEILING LIGHTING - NE PARTIAL PLAN
E53 - EXHIBIT LEVEL - WALL/BACK LIGHTING - SE PARTIAL PLAN 2
E54 - EXHIBIT LEVEL - WALL/BACK LIGHTING - NE PARTIAL PLAN 2
E72 - PANEL SCHEDULES

File details come from the government source that posted it. Updated .