E390_-_UTILITY_LEVEL_-_ENLARGED_PLAN__-_Addendum_3_0009.pdf
PDF 176 KB Posted
- Attached to
- NAMA 216042 - Lincoln Memorial Rehabilitation
- Solicitation number
- 140P2022R0046
About this file
This document contains an architectural plan and details for the Lincoln Memorial Rehabilitation project. The plan shows security systems including a public address system, exhibit audiovisual system, security cameras, access control, and network and server equipment to be installed in the utility level and IT room. Relay integration is specified between the public address and exhibit AV systems to provide shunt control of audio during announcements. Four signal cables are to be run from the public address output module to the exhibit AV equipment room with a 20-foot service loop. Related federal contract opportunity 140P2022R0046 solicits proposals for the Lincoln Memorial Rehabilitation project with the National Park Service as the contracting agency.
View the file
Other files
Show 40 more
Latest 50 of 171 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLC
PS 24
PS 24
B C
P B
C P
B C
P B
C P
UPS
VMS
VM
PLCS
IDS
INS
IPS PACS
EL
DP R
REX
DGP
SPARE
RACK
PS 24
DGP
CARD READER
WITH KEYPAD
IT ROOM
SERVER
RACK
VMS
RACK
PACS
RACK
POE
POE
POE
POE
POE
POE
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
LEGEND
GENERAL NOTES
132917
NAMA-216042
SEAL
Signature: Date: 05/10/22B
IM
L in c o ln
M e m o ri a l/ L in c o ln
M e m o ri a l_ S e c u r_ v .r v t
M2H
M2H E390
UTILITY LEVEL -
ENLARGED PLAN
LINCOLN MEMORIAL REHABILITATION
NATIONAL MALL AND MEMORIAL PARKS
M2H
5/13/2022
1/4" = 1'-0"
UTILITY LEVEL - SECURITY ENLARGED
PLAN
1. REFER TO TELECOM PLANS FOR TELECOM RELATED SYSTEMS DETAILS
INCLUDING EQUIPMENT RACKS, CABLE TRAY AND GROUNDING SYSTEMS.
1. EXHIBIT AV SYSTEM INTEGRATION
A. THE PUBLIC ADDRESS (PA) SYSTEM WILL PROVIDE SHUNT
CONTROL FUNCTION TO THE EXHIBIT AV SYSTEM.
B. SEQUENCE OF OPERATION:
a. WHILE THE PA SYSTEMS IS ACTIVE, A RELAY OUTPUT
FROM THE PA SYSTEM WILL TRIGGER A
MOMEMENTARY SHUNT FUNCTION OF THE EXHIBIT AV
PROGRAM.
b. WHEN THE PA SYSTEM IS NOT ACTIVE, THE RELAY
OUTPUT WILL CHANGE STATE ALLOWING EXHIBIT AV
SYSTEM TO RESTORE EXIBIT PROGRAM.
C. TO SUPPORT THIS FUNCTION, PROVIDE FOUR (4) 22/4 AWG
SHIELDING CABLES FROM THE PA SYSTEM OUTPUT MODULE
TO THE EXHIBIT AV EQUIPMENT ROOM. PROVIDE A 20' SERVICE
LOOP TO THE DESTINATED AV SYSTEM.
DETAIL NOTES
173162
SCALE IN FEET
1/4" = 1'-0"
4 0 4 8
NE
NW
SE
SW
KEY PLAN
NO. REVISION DATE BY
B3 Revision 3 7/1/2022 M2H
B3
| Sheets |
| E360 - SECURITY DETAILS |
| E361 - SECURITY DETAILS |
| E390 - UTILITY LEVEL - ENLARGED PLAN |