M201_-_UTILITY_LEVEL_-_FIRE_PROTECTION_PLAN_0009.pdf

PDF 494 KB Posted

Attached to
NAMA 216042 - Lincoln Memorial Rehabilitation
Solicitation number
140P2022R0046
Issued by

About this file

This document package includes fire protection plans and specifications for the Lincoln Memorial Rehabilitation project. The plans provide details on the sprinkler and standpipe systems for the utility level, including pipe sizes, sprinkler locations and remote area calculations to deliver a total of 539.011 GPM and 747.636 GPM of water for Remote Areas 6 and 7 respectively at required pressures of 99.64 PSI and 141.577 PSI. The related solicitation is for the Lincoln Memorial Rehabilitation project under National Park Service contract number NAMA 216042 with an opportunity type of Solicitation.

View the file

Other files

File Type Posted
Sol_140P2022R0046_Amd_0011.pdf PDF
Sol_140P2022R0046_Amd_0010.pdf PDF
05_7000_-_DECORATIVE_METAL_0009.pdf PDF
28_05_00_01_Common_Results_for_Elect_Sec_Add_3_0009.pdf PDF
A31_-_EXHIBIT_LEVEL_RCP_0009.pdf PDF
M210_-_UTILITY_LEVEL_-_FIRE_PROTECTION_-_NW_PARTIAL_PLAN_0009.pdf PDF
A154_-_FINISH_SCHEDULE_0009.pdf PDF
01_2700_-_Contract_Line_Items_0009.pdf PDF
A101_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_SCREENING_0009.pdf PDF
G6_0_(ADDENDUM_3)_0009.pdf PDF
G8_1_(ADDENDUM_3)_0009.pdf PDF
A82_-_INTERIOR_ELEVATIONS_-_ELEVATORS_0009.pdf PDF
01_3591_-_Historic_Preservation_Treatment_0009.pdf PDF
14_2100_Hydraulic_Elevators_0009.pdf PDF
E72_-_PANEL_SCHEDULES_0009.pdf PDF
C16_(ADDENDUM_3)_0009.pdf PDF
A128_-_INTERIOR_ELEVATIONS_-_FAMILY___UNISEX_TOILETS_0009.pdf PDF
E390_-_UTILITY_LEVEL_-_ENLARGED_PLAN__-_Addendum_3_0009.pdf PDF
07_1413_-_HOT_FLUID-APPLIED_RUBBERIZED_ASPHALT_WATERPROOFING_0009.pdf PDF
E45_-_EXHIBIT_LEVEL_-_CEILING_LIGHTING_-_SE_PARTIAL_PLAN_0009.pdf PDF
A100_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_ENTRY_VESTIBULES_0009.pdf PDF
A104_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_SOUTH_EXHIBIT_0009.pdf PDF
A99_-_CHAMBER_LEVEL_-_ENLARGED_PLANS_0009.pdf PDF
G11_-_TEMPORARY_PROTECTION_-_INTERIOR_-_EXHIBIT_LEVEL_0009.pdf PDF
A107_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_TOILET_0009.pdf PDF
E46_-_EXHIBIT_LEVEL_-_CEILING_LIGHTING_-_NE_PARTIAL_PLAN_0009.pdf PDF
Sol_140P2022R0046_Amd_0009.pdf PDF
A30_-_UTILITY_LEVEL_RCP_0009.pdf PDF
A105_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_RETAIL_0009.pdf PDF
A108_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_UNISTRUT_FRAME_0009.pdf PDF
A127_-_INTERIOR_ELEVATIONS_-_WOMEN_S___MEN_S_TOILETS_0009.pdf PDF
E54_-_EXHIBIT_LEVEL_-_WALL-BACK_LIGHTING_-_NE_PARTIAL_PLAN_2_0009.pdf PDF
G10_-_TEMPORARY_PROTECTION_-_INTERIOR_-_UTILITY_LEVEL_0009.pdf PDF
A103_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_CENTRAL_EXHIBIT_0009.pdf PDF
A102_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_NORTH_EXHIBIT_0009.pdf PDF
E14_-_EXHIBIT_LEVEL_-_POWER_-_SE_PARTIAL_PLAN_0009.pdf PDF
M208_-_UTILITY_LEVEL_-_FIRE_PROTECTION_-_NE_PARTIAL_PLAN_0009.pdf PDF
E361_-_SECURITY_DETAILS_-_Addendum_3_0009.pdf PDF
A106_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_NORTH_EXIT_AND_BREAK_ROOM_0009.pdf PDF
A153_-_MATERIAL_SCHEDULE_0009.pdf PDF
A51_-_NORTH___SOUTH_ELEVATIONS_0009.pdf PDF
01_1100_-_Summary_of_Work_0009.pdf PDF
E15_-_EXHIBIT_LEVEL_-_POWER_-_NE_PARTIAL_PLAN_0009.pdf PDF
E360_-_SECURITY_DETAILS_-_Addendum_3_0009.pdf PDF
E53_-_EXHIBIT_LEVEL_-_WALL-BACK_LIGHTING_-_SE_PARTIAL_PLAN_2_0009.pdf PDF
C31_(ADDENDUM_3)_0009.pdf PDF
Sol_140P2022R0046_Amd_0008.pdf PDF
NAMA_LINC_216042_Bid_Questions_and_Responses_Vol_3_0008.pdf PDF
B08_Solit_Attachment__PriceSched-Rev_070522_0008.xlsx XLSX spreadsheet
Sol_140P2022R0046_Amd_0007.pdf PDF
Show 40 more

Latest 50 of 171 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT A

EXHIBIT MAIN

CHAMBER NORTH

EXHIBIT MAIN

EXHIBIT B

CHAMBER SOUTH

Remote area number:

Occupancy classification:

Density:

Area of application:

Total water required (including hose streams):

@ a required system pressure of:

Fire Protection System Demand:

No. of sprinklers calculated:

Inside Hose Streams:

Outside Hose Streams:

ORDINARY HAZARD 1

0.15 Gpm/SqFt

661 SqFt

539.011 GPM

99.64Psi

0 GPM

250 GPM

Remote area number:

Occupancy classification:

Density:

Area of application:

Total water required (including hose streams):

@ a required system pressure of:

Fire Protection System Demand:

No. of sprinklers calculated:

Inside Hose Streams:

Outside Hose Streams:

ORDINARY HAZARD 1

0.15 Gpm/SqFt

1535 SqFt

747.636 GPM

141.577 Psi

0 GPM

250 GPM

199198

217218

1 2 3 4 7 12 14 15 17 18

B

C

D

G

L

M

O

P

A

5 6 8 9 10 11 13

E

F

H

J

K

N

UTILITY SPRINKLER

ZONE

6" INCOMING

WATER SERVICE

TO FDC

TO FIRE PUMP TEST HEADER

REFER

CIVIL

REMOTE HEAD

REMOTE HEAD

4" SPR

2 1/2" SPR 2 1/2" SPR

4" SPR

4" SPR

4" SPR

4" S

PR

4" S

PR

2" S

PR

4" S

PR

2" S

PR

3"

S

PR

2" SPR

4" SPR

6" F

6" F 6"

F

2" SPR

4" SPR

4" SPR

4" SPR

UTILITY

SPRINKLER

ZONE

UTILITY

SPRINKLER

ZONE

TO MAIN DRAIN

REMOTE AREA #7

REMOTE AREA #6

B1

SCALE OF FEET

0'16' 16' 32'

SCALE A

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

TITLE OF SHEET

OF

132917

NAMA-216042

TITLE OF SHEETSEAL

LEGEND

GENERAL NOTES

KEY NOTES

B

IM

L in c o ln

M e m o ri a l U n d e rc ro ft L in c o ln

M e m o ri a l_ P lu m b v .r v t

RAN

RAN

M201ADP

5/13/2022

UTILITY LEVEL - FIRE

PROTECTION PLAN

LINCOLN MEMORIAL REHABILITATION

NATIONAL MALL AND MEMORIAL PARKS 52

SCALE AM201

1 UTILITY LEVEL FIRE PROTECTION

1. THE ROOM SHALL BE PROTECTED BY A CLEAN AGENT SYSTEM.

NO. REVISION DATE BY

B1 BID ADDENDUM 3 7/01/2022 AEI

B1

7/1/2022

Sheets
M201 - UTILITY LEVEL - FIRE PROTECTION PLAN
M208 - UTILITY LEVEL - FIRE PROTECTION - NE PARTIAL PLAN
M210 - UTILITY LEVEL - FIRE PROTECTION - NW PARTIAL PLAN