This document provides plans and specifications for temporary interior protection during rehabilitation work at the Lincoln Memorial in Washington, D.C. The project involves providing protective measures to historic fabric and surfaces throughout construction, including temporary vertical access, barriers around work areas, and covering or shielding exposed walls, columns, stairways and other features. Contractors must coordinate daily access and limits of work with the owner and Park Police to minimize disturbance. All protective materials must be non-staining and non-friable as specified. Related solicitation number 140P2022R0046 from the Department of the Interior National Park Service concerns the NAMA 216042 Lincoln Memorial Undercroft rehabilitation project and seeks contractors to implement the temporary interior protection plans depicted and ensure public access is maintained throughout.

View the file

Other files

File Type Posted
Sol_140P2022R0046_Amd_0011.pdf PDF
Sol_140P2022R0046_Amd_0010.pdf PDF
05_7000_-_DECORATIVE_METAL_0009.pdf PDF
28_05_00_01_Common_Results_for_Elect_Sec_Add_3_0009.pdf PDF
A31_-_EXHIBIT_LEVEL_RCP_0009.pdf PDF
M210_-_UTILITY_LEVEL_-_FIRE_PROTECTION_-_NW_PARTIAL_PLAN_0009.pdf PDF
A154_-_FINISH_SCHEDULE_0009.pdf PDF
01_2700_-_Contract_Line_Items_0009.pdf PDF
A101_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_SCREENING_0009.pdf PDF
G6_0_(ADDENDUM_3)_0009.pdf PDF
G8_1_(ADDENDUM_3)_0009.pdf PDF
A82_-_INTERIOR_ELEVATIONS_-_ELEVATORS_0009.pdf PDF
01_3591_-_Historic_Preservation_Treatment_0009.pdf PDF
14_2100_Hydraulic_Elevators_0009.pdf PDF
E72_-_PANEL_SCHEDULES_0009.pdf PDF
C16_(ADDENDUM_3)_0009.pdf PDF
A128_-_INTERIOR_ELEVATIONS_-_FAMILY___UNISEX_TOILETS_0009.pdf PDF
E390_-_UTILITY_LEVEL_-_ENLARGED_PLAN__-_Addendum_3_0009.pdf PDF
07_1413_-_HOT_FLUID-APPLIED_RUBBERIZED_ASPHALT_WATERPROOFING_0009.pdf PDF
E45_-_EXHIBIT_LEVEL_-_CEILING_LIGHTING_-_SE_PARTIAL_PLAN_0009.pdf PDF
A100_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_ENTRY_VESTIBULES_0009.pdf PDF
A104_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_SOUTH_EXHIBIT_0009.pdf PDF
A99_-_CHAMBER_LEVEL_-_ENLARGED_PLANS_0009.pdf PDF
A107_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_TOILET_0009.pdf PDF
E46_-_EXHIBIT_LEVEL_-_CEILING_LIGHTING_-_NE_PARTIAL_PLAN_0009.pdf PDF
Sol_140P2022R0046_Amd_0009.pdf PDF
A30_-_UTILITY_LEVEL_RCP_0009.pdf PDF
A105_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_RETAIL_0009.pdf PDF
A108_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_UNISTRUT_FRAME_0009.pdf PDF
A127_-_INTERIOR_ELEVATIONS_-_WOMEN_S___MEN_S_TOILETS_0009.pdf PDF
E54_-_EXHIBIT_LEVEL_-_WALL-BACK_LIGHTING_-_NE_PARTIAL_PLAN_2_0009.pdf PDF
G10_-_TEMPORARY_PROTECTION_-_INTERIOR_-_UTILITY_LEVEL_0009.pdf PDF
A103_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_CENTRAL_EXHIBIT_0009.pdf PDF
A102_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_NORTH_EXHIBIT_0009.pdf PDF
E14_-_EXHIBIT_LEVEL_-_POWER_-_SE_PARTIAL_PLAN_0009.pdf PDF
M208_-_UTILITY_LEVEL_-_FIRE_PROTECTION_-_NE_PARTIAL_PLAN_0009.pdf PDF
E361_-_SECURITY_DETAILS_-_Addendum_3_0009.pdf PDF
A106_-_EXHIBIT_LEVEL_-_ENLARGED_RCP_-_NORTH_EXIT_AND_BREAK_ROOM_0009.pdf PDF
A153_-_MATERIAL_SCHEDULE_0009.pdf PDF
A51_-_NORTH___SOUTH_ELEVATIONS_0009.pdf PDF
01_1100_-_Summary_of_Work_0009.pdf PDF
E15_-_EXHIBIT_LEVEL_-_POWER_-_NE_PARTIAL_PLAN_0009.pdf PDF
M201_-_UTILITY_LEVEL_-_FIRE_PROTECTION_PLAN_0009.pdf PDF
E360_-_SECURITY_DETAILS_-_Addendum_3_0009.pdf PDF
E53_-_EXHIBIT_LEVEL_-_WALL-BACK_LIGHTING_-_SE_PARTIAL_PLAN_2_0009.pdf PDF
C31_(ADDENDUM_3)_0009.pdf PDF
Sol_140P2022R0046_Amd_0008.pdf PDF
NAMA_LINC_216042_Bid_Questions_and_Responses_Vol_3_0008.pdf PDF
B08_Solit_Attachment__PriceSched-Rev_070522_0008.xlsx XLSX spreadsheet
Sol_140P2022R0046_Amd_0007.pdf PDF
Show 40 more

Latest 50 of 171 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 6 7 8 9 10 12 13 14 15 16 17 18

B

C

D

G

H

L

M

E

F

J

K

N

O

P

A

02.72

02.75

02.76 02.76

02.75

:TYP.

02.112

:TYP.

02.112

EXISTING BEAMS BELOW

STAIRS (TYP)

B1

1. PUBLIC ACCESS TO THE MEMORIAL VIA THE MAIN STAIR (MIN.

40'-0" WIDE) AND THE TEMPORARY VERTICAL ACCESS MUST

BE PROVIDED THROUGHOUT THE DURATION OF THE WORK.

CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE OF THE

TEMPORARY LIFT.

2. CONCEPTUAL INITIAL LIMIT OF WORK AREA IS SHOWN.

CONTRACTOR TO MEET WITH THE OWNER AND US PARK

POLICE TO DEFINE AND ADJUST THE LIMITS OF

CONSTRUCTION ACCESS TO THE TERRACE AND MAIN STAIR

AT VARIOUS STAGES OF THE WORK.

3. NO EQUIPMENT, MATERIALS OR OTHER CONSTRUCTION

RELATED ITEMS SHALL BE PLACED OR LEANED AGAINST THE

EXISTING WALLS AND COLUMNS.

4. DAILY CONSTRUCTION ACCESS SHALL BE LIMITED TO THE

PATHWAYS SHOWN TO LIMIT THE AMOUNT OF DISTURBANCE

TO THE EXISTING TERRAIN.

5. TEMPORARY PROTECTION MUST BE PROVIDED AT ALL POINTS

OF CONTACT WITH HISTORIC FABRIC. CONTRACTOR TO USE

NON-STAINING AND NON-FRIABLE MATERIALS FOR

TEMPORARY PROTECTION. SEE SPECIFICATIONS.

OWNER PROVIDED AND INSTALLED

PROTECTION OF HISTORIC GRAFFITI (NIC)

EXTENT OF PROTECTION FOR EXISTING

RAISED TERRACE WALLS AND STYLOBATE.

CONSTRUCTION AREA PATHWAY. AREA TO BE

COVERED WITH GRAVEL & GEO-TEXTILE FABRIC

AREA OF RAISED TERRACE CONSTRUCTION ACCESS

WALL / COLUMN PROTECTION TO A HEIGHT

OF 8'-0" ABOVE GRADE LEVEL

WALL / COLUMN PROTECTION FULL HEIGHT

ABOVE GRADE LEVEL

LEGEND

CHAINLINK FENCE

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

TITLE OF SHEET

OF

GENERAL NOTES

132917

NAMA-216042

SEAL

KEY NOTES

B

IM

L in c o ln

M e m o ri a l U n d e rc ro ft L in c o ln

M e m o ri a l_ A rc h U n d e rc ro ft .r v t

QE

QE

G11

TEMPORARY

PROTECTION - INTERIOR -

EXHIBIT LEVEL

LINCOLN MEMORIAL REHABILITATION

NATIONAL MALL AND MEMORIAL PARKS

QE

5/13/2022 14

SCALE AG11

1 EXHIBIT - INTERIOR PROTECTION PLAN

02.72 EXISTING GRANITE COPING AND WALL. PROVIDE

PROTECTION THROUGH OUT CONSTRUCTION. SEE G

SHEETS

02.75 EXISTING GRANITE STAIR WALL. PROVIDE PROTECTION.

02.76 PROTECTION OF ADJACENT EXISTING GRANITE WALL MUST

REMAIN IN PLACE DURING ENLARGEMENT OF EXISTING

DOOR OPENINGS.

02.112 WALL AND COLUMN PROTECTION. EXTEND FULL HEIGHT

ABOVE GRADE. SEE SPECIFICATIONS.

SCALE OF FEET

16 32160

SCALE A

NO. REVISION DATE BY

B1 BID ADDENDUM 3 7/1/2022

SEAL

Sheets
A30 - UTILITY LEVEL RCP
A31 - EXHIBIT LEVEL RCP
A51 - NORTH & SOUTH ELEVATIONS
A82 - INTERIOR ELEVATIONS - ELEVATORS
A99 - CHAMBER LEVEL - ENLARGED PLANS
A100 - EXHIBIT LEVEL - ENLARGED RCP - ENTRY VESTIBULES
A101 - EXHIBIT LEVEL - ENLARGED RCP - SCREENING
A102 - EXHIBIT LEVEL - ENLARGED RCP - NORTH EXHIBIT
A103 - EXHIBIT LEVEL - ENLARGED RCP - CENTRAL EXHIBIT
A104 - EXHIBIT LEVEL - ENLARGED RCP - SOUTH EXHIBIT
A105 - EXHIBIT LEVEL - ENLARGED RCP - RETAIL
A106 - EXHIBIT LEVEL - ENLARGED RCP - NORTH EXIT AND BREAK ROOM
A107 - EXHIBIT LEVEL - ENLARGED RCP - TOILET
A108 - EXHIBIT LEVEL - ENLARGED RCP - UNISTRUT FRAME
A127 - INTERIOR ELEVATIONS - WOMEN'S & MEN'S TOILETS
A128 - INTERIOR ELEVATIONS - FAMILY & UNISEX TOILETS
A153 - MATERIAL SCHEDULE
A154 - FINISH SCHEDULE
G10 - TEMPORARY PROTECTION - INTERIOR - UTILITY LEVEL
G11 - TEMPORARY PROTECTION - INTERIOR - EXHIBIT LEVEL

File details come from the government source that posted it. Updated .