11_AE113 - REFERENCE PLAN -NINTH FLOOR and ROOF.pdf

PDF 324 KB Posted

Attached to
Y1AZ--Design Build, Construct SICU and Renovate Operating Rooms
Solicitation number
36C10F22R0036
Issued by

View the file

Other files

File Type Posted
Award Notice 36C10F24C0002.pdf PDF
36C10F22R0036 0004.pdf PDF
36C10F22R0036 0003.pdf PDF
36C10F22R0036 0002.pdf PDF
36C10F22R0036 0001.pdf PDF
36C10F22R0036.pdf PDF
45_PL102 - EIGHTH FLOOR -PLUMBING WASTE AND VENT PLAN.pdf PDF
40_PPD101 - SEVENTH FLOOR -PLUMBING DOMESTIC WATER DEMOLITION PLAN.pdf PDF
61_MHP100 - MECHANICAL DUCT and PIPING PLAN -ROOF LEVEL.pdf PDF
17_AF702 - FINISH PLAN -EIGHTH FLOOR.pdf PDF
07_ELEVATOR NARRATIVE.pdf PDF
52_MDH100 - MECHANICAL DUCT DEMOLITION PLAN -SEVENTH FLOOR.pdf PDF
100 percent RFP PLUMBING CALCS.pdf PDF
48_PJ101 - SEVENTH FLOOR -PLUMBING MEDICAL GAS PLAN.pdf PDF
55_MDP100 - MECHANICAL PIPING DEMOLTION PLAN -SEVENTH FLOOR.pdf PDF
44_PL101 - SEVENTH FLOOR -PLUMBING WASTE AND VENT PLAN.pdf PDF
24_QH105 - EQUIPMENT PLAN -EIGHTH FLOOR -AREA 1.pdf PDF
04_FIRE PROTECTION.pdf PDF
OR-SICU 100 percent Digital Material Board.pdf PDF
28_QH109 - INTERIOR EQUIPMENT ELEVATIONS.pdf PDF
27_QH108 - INTERIOR EQUIPMENT ELEVATIONS.pdf PDF
84_EY301 - SEVENTH FLOOR ELECTRICAL LOW VOLTAGE PLAN.pdf PDF
4_GI102 - LIFE SAFETY PLAN -EIGHTH FLOOR.pdf PDF
86_EP401 - ELECTRICAL LIGHTNING PROTECTION PLAN.pdf PDF
21_QH102 - EQUIPMENT PLAN -SEVENTH FLOOR -AREA 2.pdf PDF
13_AE115 - DIMENSION PLAN -EIGHTH FLOOR.pdf PDF
90_EP504 - ELECTRICAL DETAILS.pdf PDF
88_EP502 - SCHEDULES AND DETAILS.pdf PDF
26_QH107 - EQUIPMENT PLAN -EIGHTH FLOOR -AREA 3 and INTERIOR EQUIPMENT ELEVATIONS.pdf PDF
39_PLD102 - EIGHTH FLOOR -PLUMBING WASTE AND VENT DEMOLITION PLAN.pdf PDF
9_AE111 - REFERENCE PLAN -SEVENTH FLOOR.pdf PDF
12_AE114 - DIMENSION PLAN -SEVENTH FLOOR.pdf PDF
14_AE211 - REFLECTED CEILING PLAN -SEVENTH FLOOR.pdf PDF
01_Mold Report.pdf PDF
Floor 7 Inventory OKC VAMC.pdf PDF
71_M-704 - MECHANICAL CONTROLS.pdf PDF
30_FA001 - FIRE ALARM_MASS NOTIFICATION GENERAL NOTES.pdf PDF
56_MDP101 - MECHANICAL PIPING DEMOLTION PLAN -EIGHTH FLOOR.pdf PDF
02_ARCHITECTURAL.pdf PDF
1_GI000 - COVER SHEET.pdf PDF
50_P-600 - PLUMBING SCHEDULES.pdf PDF
82_EL201 - SEVENTH FLOOR ELECTRICAL LIGHTING PLAN.pdf PDF
66_M-502 - MECHANICAL DETAILS.pdf PDF
60_MH103 - MECHANICAL ZONING and CONTROLS PLAN -EIGHTH FLOOR.pdf PDF
06_ELECTRICAL NARRATIVE.pdf PDF
02_STRUCTURAL NARRATIVE.pdf PDF
20_QH101 - EQUIPMENT PLAN -SEVENTH FLOOR -AREA 1.pdf PDF
38_PLD101 - SEVENTH FLOOR -PLUMBING WASTE AND VENT DEMOLITION PLAN.pdf PDF
Floor 8 Inventory OKC VAMC.pdf PDF
63_MP101 - MECHANICAL HVAC PIPING PLAN -EIGHTH FLOOR.pdf PDF
Show 40 more

Latest 50 of 122 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

1 2 3 4 5 6 7 8 9 10 11 11a 12

E

F

G

H

I

J

K

9A

G2

MACHINE ROOM

9F-101

MACHINE ROOM

9F-101

ELEVATOR

MACHINE ROOM

9F-102

ELEVATOR

MACHINE ROOM

9F-102

MECHANICAL

ELECTRICAL

ROOM

9F-104

MECHANICAL

ELECTRICAL

ROOM

9F-104

CORRIDOR

9F-103

CORRIDOR

9F-103

8.03

EXISTING 7TH

FLOOR ROOF

BELOW

EXISTING 7TH

FLOOR ROOF

BELOW

EXISTING 7TH

FLOOR ROOF

BELOW

23.0223.04

23.02

23.02

23.02

23.05

23.04

5.27

EXISTING 8TH

FLOOR ROOF

EXISTING 8TH

FLOOR ROOF

2.58

2.63 2.63

7TH FLOOR ROOF

N

9TH FLOOR

9TH FLOOR KEY PLAN

8TH FLOOR ROOF

1. DESIGN-BUILD CONTRACTOR TO DEVELOP PHASING OF DEMOLITION AND NEW CONSTRUCTION.

COORDINATE ALL REQUIRED PHASING WITH VA AND COR. PROVIDE AT LEAST 1 WEEK NOTICE

PRIOR TO ANY REQUIRED DOWN TIME.

2. DESIGN BUILD TEAM AND A/E OF RECORD MUST FOLLOW ALL CURRENT VA NATIONAL TIL

STANDARDS, INCLUDING VA NATIONAL CAD STANDARDS, THROUGHOUT DESIGN AND

CONSTRUCTION

3. DESIGN BUILD CONTRACTOR TO ASSESS EXISTING EIGHTH FLOOR ROOF AND CORRECT

DEFICIENCIES AS REQUIRED.

4. DESIGN BUILD CONTRACTOR TO PATCH AND REPAIR ROOF AS NEEDED IN CONJUNCTION WITH

INSTALLATION OF NEW ROOFTOP EQUIPMENT.

GENERAL ROOF PLAN NOTES

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing #

VA Office Of Construction & Facilities Management Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

OK ARCH REG. NO. CA02295, EXP. 06/30/2023

OK ENGR REG. NO. CA7127, EXP. 06/30/2023

The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.

FULLY SPRINKLERED

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

STRUCTURAL ENGINEER

H2B, INC.

1225 N. LOOP WEST, SUITE 800

HOUSTON, TX 77008

(713) 864-2900

MECH / ELEC / PLUMB / TECH ENGINEER

FIRE PROTECTION ENGINEER

POOLE FIRE PROTECTION, INC.

19910 WEST 161ST STREET

OLATHE, KANSAS 66062

(913) 829-8690

HEALTHCARE PLANNER

OCULUS INC.

1 S. MEMORIAL DR., SUITE 1500

ST. LOUIS, MO 63102

(314) 367-6100

SPUR PROJECT NUMBER: 1791.08

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

(913) 369-7200

SEE FRONT COVER SHEET

FOR APPROVAL SIGNATURE

VERTICAL TRANSPORTATION

ENVIRONMENTAL HYGIENIST

TEC-AN, INC.

2517 S. PURDUE AVE.

OKLAHOMA CITY, OK 73128

(405) 681-7076

LERCH BATES

2001 BRYAN ST., SUITE 1930

DALLAS, TX 75201

(972) 294-5221

/2

/2

:1 :0

P

M

AE113

REFERENCE PLAN - NINTH FLOOR &

ROOF

ZDL

11 OF 92JNK

100% RFP DOCUMENTS

CONSTRUCT SURGICAL INTENSIVE

CARE UNIT & RENOVATE

OPERATING ROOMS

08/02/2021

635-436

OKLAHOMA CITY VA HEALTHCARE SYSTEM

921 NE 13TH ST, OKLAHOMA CITY, OK 73104

N

1/8" = 1'-0"

NINTH FLOOR REFERENCE PLAN

KEYNOTE LEGEND

2.58 LADDER UP FROM BELOW.

2.63 LADDER UP TO PENTHOUSE ROOF

5.27 EXPANSION JOINT AND COVER TO BE INSTALLED

8.03 NEW ELEVATOR SHAFT LOCATION BELOW.

23.02 MECHANICAL DUCT, SEE MECHANICAL DRAWINGS

23.04 INSTALL NEW HVAC ROOF CURB AS REQUIRED. REFER TO MECHANICAL DWGS.

23.05 INSTALL RAIL MOUNT FOR NEW ROOTOP MECH. EQUIPMENT AS REQUIRED. REFER TO

MECHANICAL DWGS.

No. REVISION DESCRIPTION DATE

File details come from the government source that posted it. Updated .