Bid 26-80-1514 Post Road South Widening - SR 9 to Kelly Mill (PI 0006915)

Closed State & local contract opportunity Posted

Solicitation number
PE-65800-NONST-2026-000000108
State
Georgia
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 39
Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

Forsyth County Board of Commissioners is requesting sealed bids for the widening and reconstruction of Post Road from SR 9/S Atlanta Road to CR 5/Kelly Mill Road in Forsyth County, Georgia, with bids due September 24, 2026 at 2:00 p.m. EST through the EUNA Procurement portal. A 10% Disadvantaged Business Enterprise (DBE) goal applies to this project.

The scope encompasses two lanes in each direction with a 16-foot wide raised median; a 19-foot wide urban shoulder on the east side with curb, gutter, and 10-foot wide multi-use path; and a 10-foot wide urban shoulder on the west side with curb, gutter, and 5-foot wide sidewalks. The project also includes drainage structures, storm drain pipes, water lines, asphalt, traffic signals, markings, landscaping, and erosion and sedimentation control measures. Construction completion is 1,825 calendar days following the Notice to Proceed.

Bidders submitting bids exceeding $2 million must be prequalified with the Georgia Department of Transportation (GDOT); bids of $2 million or less require either GDOT prequalification or registration as a GDOT subcontractor. A Bid Bond is required per GDOT Standard Specifications Section 102.08. The successful bidder must furnish a Performance Bond equal to 100% of the contract amount and a Payment Bond equal to 110% of the contract amount. All bids must remain valid for a minimum of 120 calendar days from opening.

A non-mandatory pre-bid conference is scheduled for September 3, 2026 at 10:00 a.m. EST at the Forsyth County Library in Cumming, Georgia. Questions are due September 7, 2026 at 2:00 p.m. EST. Public bid opening and reading will occur at 2:30 p.m. EST on September 24 at the Forsyth County Administration Building. The contract will be awarded to the lowest reliable bidder meeting all prescribed requirements.

Opportunity text

Providing all materials, equipment and labor for construction of the proposed widening and reconstruction of Post Road from SR 9/S Atlanta Road to CR 5/Kelly Mill Road located in Forsyth County. The proposed design includes two lanes in each direction with a 16-foot wide raised median. The proposed outside shoulder will be a 19-foot wide urban shoulder on the east side, containing curb and gutter with a 10-foot wide multi-use path, and on the west side will be a 10-foot wide urban shoulder containing curb and gutter with 5-foot wide sidewalks. The project also includes the installation of drainage structures, storm drainpipes, water lines and appurtenances, asphalt, traffic signals and markings, landscaping, erosion, sedimentation and pollution control measures, and other associated work.

Files

File Type Posted
Advertisement Bid 26_80_1514 Post Rd South Wi.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors