West 388th/419th Fighter Wing Apron at Hill AFB
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W9123822R0008
- Agency
-
ENDIST Sacramento
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Hill AFB, Utah 84056, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks design-build proposals to remove and replace the West portion of the 388th/419th Fighter Wing F-35 Apron at Hill Air Force Base in Utah. The Department of the Army Corps of Engineers Engineering District Sacramento will evaluate proposals using a best value tradeoff process considering technical approach and past performance. The awarded contractor will be responsible for the complete design and construction, including removing the existing 12-inch concrete pavement and replacing it with 15 inches of new concrete incorporating a stabilized drainage layer and subbase. Proposals are due by August 8, 2022.
The opportunity is set aside for total small businesses. The NAICS code is 238110 and PSC code is R499. The project involves replacing approximately 700,000 square feet of pavement and 26 sunshade shelters at an estimated value between $16.5-$39.5 million. Performance is required within 730 calendar days at Hill Air Force Base, Utah. Optional contract line items are provided for additional sunshade shelters, unstable soil replacement, and asbestos removal.
Notice text
4 versions
Update #4 · Latest ·
This is a design-build contract therefore the awarded contractor is required to perform design work prior to construction. The awarded contractor is responsible and liable for the complete design and shall not assume that the provided design criteria and drawings in this solicitation will alleviate him/her from performing any additional design as required to produce a complete set of construction documents.
Scope of Work: This Design Build project will remove and replace the West portion of the 388th/419th Fighter Wing F-35 Apron. The existing sunshade shelters located on the apron will also be removed and replaced. The majority of the pavement is identified in the latest Pavement Evaluation as A17B. The existing pavement is approximately 40 years old and has exceeded its design life. The existing panels are oversized and will be replaced with appropriately sized panels. The project will consist of removing the exiting 12” PCC and replacing with 15” PCC. The new pavement section will incorporate a stabilized drainage layer and new subbase course material. In addition to new PCC parking apron and ACC shoulders, the sunshades will be dismantled, recycled and new sunshades installed. Existing crew shacks will be removed and relocated. One additional crew shack will be provided so that each parking row will have a crew shack. As part of this project, the apron will be re-marked.
The project shall be designed and constructed within the criteria prescribed, as well as other codes and standards specified in the contract.
Update #3 ·
This is a design-build contract therefore the awarded contractor is required to perform design work prior to construction. The awarded contractor is responsible and liable for the complete design and shall not assume that the provided design criteria and drawings in this solicitation will alleviate him/her from performing any additional design as required to produce a complete set of construction documents.
Scope of Work: This Design Build project will remove and replace the West portion of the 388th/419th Fighter Wing F-35 Apron. The existing sunshade shelters located on the apron will also be removed and replaced. The majority of the pavement is identified in the latest Pavement Evaluation as A17B. The existing pavement is approximately 40 years old and has exceeded its design life. The existing panels are oversized and will be replaced with appropriately sized panels. The project will consist of removing the exiting 12” PCC and replacing with 15” PCC. The new pavement section will incorporate a stabilized drainage layer and new subbase course material. In addition to new PCC parking apron and ACC shoulders, the sunshades will be dismantled, recycled and new sunshades installed. Existing crew shacks will be removed and relocated. One additional crew shack will be provided so that each parking row will have a crew shack. As part of this project, the apron will be re-marked.
Contractor shall perform work as stated in Amendment 0007 and:
Phase 2, Attachment 1- Specifications
Phase 2, Attachment 4 – Drawings
Phase 2, Attachment 5 - Price Schedule
The project shall be designed and constructed within the criteria prescribed, as well as other codes and standards specified in the contract.
Update #2 ·
This is a design-build contract therefore the awarded contractor is required to perform design work prior to construction. The awarded contractor is responsible and liable for the complete design and shall not assume that the provided design criteria and drawings in this solicitation will alleviate him/her from performing any additional design as required to produce a complete set of construction documents.
Scope of Work: This Design Build project will remove and replace the West portion of the 388th/419th Fighter Wing F-35 Apron. The existing sunshade shelters located on the apron will also be removed and replaced. The majority of the pavement is identified in the latest Pavement Evaluation as A17B. The existing pavement is approximately 40 years old and has exceeded its design life. The existing panels are oversized and will be replaced with appropriately sized panels. The project will consist of removing the exiting 12” PCC and replacing with 15” PCC. The new pavement section will incorporate a stabilized drainage layer and new subbase course material. In addition to new PCC parking apron and ACC shoulders, the sunshades will be dismantled, recycled and new sunshades installed. Existing crew shacks will be removed and relocated. One additional crew shack will be provided so that each parking row will have a crew shack. As part of this project, the apron will be re-marked.
Contractor shall perform work as stated in Amendment 0007 and:
Phase 2, Attachment 1- Specifications
Phase 2, Attachment 2 – Drawings
Phase 2, Attachment 5 - Price Schedule
The project shall be designed and constructed within the criteria prescribed, as well as other codes and standards specified in the contract.
Update #1 ·
This is a design-build contract therefore the awarded contractor is required to perform design work prior to construction. The awarded contractor is responsible and liable for the complete design and shall not assume that the provided design criteria and drawings in this solicitation will alleviate him/her from performing any additional design as required to produce a complete set of construction documents.
Scope of Work: This Design Build project will remove and replace the West portion of the 388th/419th Fighter Wing F-35 Apron. The existing sunshade shelters located on the apron will also be removed and replaced. The majority of the pavement is identified in the latest Pavement Evaluation as A17B. The existing pavement is approximately 40 years old and has exceeded its design life. The existing panels are oversized and will be replaced with appropriately sized panels. The project will consist of removing the exiting 12” PCC and replacing with 15” PCC. The new pavement section will incorporate a stabilized drainage layer and new subbase course material. In addition to new PCC parking apron and ACC shoulders, the sunshades will be dismantled, recycled and new sunshades installed. Existing crew shacks will be removed and relocated. One additional crew shack will be provided so that each parking row will have a crew shack. As part of this project, the apron will be re-marked.
Contractor shall perform work as stated in this Attachment 1 Summary of Work, Attachment 2 –Concept Design Drawings, Attachment 3 Supplemental Contract Requirements. The project shall be designed within the criteria prescribed, as well as other codes and standards specified in the contract.
Files
Show 40 more
50 files listed here. See the rest on GovTribe.
Notice history
| Notice | Type | Posted |
|---|---|---|
| West 388th/419th Fighter Wing Apron at Hill AFB | Award Notice | |
| This notice | Solicitation | |
| West 388th/419th Fighter Wing Apron at Hill AFB | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| F-35 Composite Repair and Training Facility / F-35 Maintenance Facility, Hill Air Force Base, Utah | ENDIST Sacramento | No set-aside | |
| HAFB Multiple Award Construction Contract V (MACC V) | Air Force Sustainment Center | Total Small Business | |
| SABER V Hill AFB | Air Force Sustainment Center | Competitive 8(a) | |
| PKA Relocatable Facility | Global Strike Command | Total Small Business | |
| FY26 project WWXT240800 multi-purpose apron and taxiway, royal australian air force (raaf) base tindal, australia | Naval Facilities Engineering Command | No set-aside |