West 388th/419th Fighter Wing Apron at Hill AFB

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W9123822R0008
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Hill AFB, Utah 84056, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks design-build proposals to remove and replace the West portion of the 388th/419th Fighter Wing F-35 Apron at Hill Air Force Base in Utah. The Department of the Army Corps of Engineers Engineering District Sacramento will evaluate proposals using a best value tradeoff process considering technical approach and past performance. The awarded contractor will be responsible for the complete design and construction, including removing the existing 12-inch concrete pavement and replacing it with 15 inches of new concrete incorporating a stabilized drainage layer and subbase. Proposals are due by August 8, 2022.

The opportunity is set aside for total small businesses. The NAICS code is 238110 and PSC code is R499. The project involves replacing approximately 700,000 square feet of pavement and 26 sunshade shelters at an estimated value between $16.5-$39.5 million. Performance is required within 730 calendar days at Hill Air Force Base, Utah. Optional contract line items are provided for additional sunshade shelters, unstable soil replacement, and asbestos removal.

Notice text

4 versions

Update #4 · Latest ·

This is a design-build contract therefore the awarded contractor is required to perform design work prior to construction. The awarded contractor is responsible and liable for the complete design and shall not assume that the provided design criteria and drawings in this solicitation will alleviate him/her from performing any additional design as required to produce a complete set of construction documents.

Scope of Work: This Design Build project will remove and replace the West portion of the 388th/419th Fighter Wing F-35 Apron. The existing sunshade shelters located on the apron will also be removed and replaced. The majority of the pavement is identified in the latest Pavement Evaluation as A17B. The existing pavement is approximately 40 years old and has exceeded its design life. The existing panels are oversized and will be replaced with appropriately sized panels. The project will consist of removing the exiting 12” PCC and replacing with 15” PCC. The new pavement section will incorporate a stabilized drainage layer and new subbase course material. In addition to new PCC parking apron and ACC shoulders, the sunshades will be dismantled, recycled and new sunshades installed. Existing crew shacks will be removed and relocated. One additional crew shack will be provided so that each parking row will have a crew shack. As part of this project, the apron will be re-marked.

The project shall be designed and constructed within the criteria prescribed, as well as other codes and standards specified in the contract.

Update #3 ·

This is a design-build contract therefore the awarded contractor is required to perform design work prior to construction. The awarded contractor is responsible and liable for the complete design and shall not assume that the provided design criteria and drawings in this solicitation will alleviate him/her from performing any additional design as required to produce a complete set of construction documents.

Scope of Work: This Design Build project will remove and replace the West portion of the 388th/419th Fighter Wing F-35 Apron. The existing sunshade shelters located on the apron will also be removed and replaced. The majority of the pavement is identified in the latest Pavement Evaluation as A17B. The existing pavement is approximately 40 years old and has exceeded its design life. The existing panels are oversized and will be replaced with appropriately sized panels. The project will consist of removing the exiting 12” PCC and replacing with 15” PCC. The new pavement section will incorporate a stabilized drainage layer and new subbase course material. In addition to new PCC parking apron and ACC shoulders, the sunshades will be dismantled, recycled and new sunshades installed. Existing crew shacks will be removed and relocated. One additional crew shack will be provided so that each parking row will have a crew shack. As part of this project, the apron will be re-marked.

Contractor shall perform work as stated in Amendment 0007 and: 

Phase 2, Attachment 1- Specifications

Phase 2, Attachment 4 – Drawings

Phase 2, Attachment 5 - Price Schedule

The project shall be designed and constructed within the criteria prescribed, as well as other codes and standards specified in the contract.

Update #2 ·

This is a design-build contract therefore the awarded contractor is required to perform design work prior to construction. The awarded contractor is responsible and liable for the complete design and shall not assume that the provided design criteria and drawings in this solicitation will alleviate him/her from performing any additional design as required to produce a complete set of construction documents.

Scope of Work: This Design Build project will remove and replace the West portion of the 388th/419th Fighter Wing F-35 Apron. The existing sunshade shelters located on the apron will also be removed and replaced. The majority of the pavement is identified in the latest Pavement Evaluation as A17B. The existing pavement is approximately 40 years old and has exceeded its design life. The existing panels are oversized and will be replaced with appropriately sized panels. The project will consist of removing the exiting 12” PCC and replacing with 15” PCC. The new pavement section will incorporate a stabilized drainage layer and new subbase course material. In addition to new PCC parking apron and ACC shoulders, the sunshades will be dismantled, recycled and new sunshades installed. Existing crew shacks will be removed and relocated. One additional crew shack will be provided so that each parking row will have a crew shack. As part of this project, the apron will be re-marked.

Contractor shall perform work as stated in Amendment 0007 and: 

Phase 2, Attachment 1- Specifications

Phase 2, Attachment 2 – Drawings

Phase 2, Attachment 5 - Price Schedule

The project shall be designed and constructed within the criteria prescribed, as well as other codes and standards specified in the contract.

Update #1 ·

This is a design-build contract therefore the awarded contractor is required to perform design work prior to construction. The awarded contractor is responsible and liable for the complete design and shall not assume that the provided design criteria and drawings in this solicitation will alleviate him/her from performing any additional design as required to produce a complete set of construction documents.

Scope of Work: This Design Build project will remove and replace the West portion of the 388th/419th Fighter Wing F-35 Apron. The existing sunshade shelters located on the apron will also be removed and replaced. The majority of the pavement is identified in the latest Pavement Evaluation as A17B. The existing pavement is approximately 40 years old and has exceeded its design life. The existing panels are oversized and will be replaced with appropriately sized panels. The project will consist of removing the exiting 12” PCC and replacing with 15” PCC. The new pavement section will incorporate a stabilized drainage layer and new subbase course material. In addition to new PCC parking apron and ACC shoulders, the sunshades will be dismantled, recycled and new sunshades installed. Existing crew shacks will be removed and relocated. One additional crew shack will be provided so that each parking row will have a crew shack. As part of this project, the apron will be re-marked.

Contractor shall perform work as stated in this Attachment 1 Summary of Work, Attachment 2 –Concept Design Drawings, Attachment 3 Supplemental Contract Requirements. The project shall be designed within the criteria prescribed, as well as other codes and standards specified in the contract.

Files

File Type Posted
W9123822R0008 A0013 20220801.pdf PDF
Attachment 23 Revised Drawings G 002 and GC 100.pdf PDF
Attachment 5 Price Schedule 20220729.pdf PDF
W9123822R0008 Attachment 22 - DoL CWRR UT20220091 - 20220701.pdf PDF
W9123822R0008-A0012 - 20220706.pdf PDF
W9123822R0008 Attachment 21 Revised Drawings G-002 GC-100 GC 101 and GC 102.pdf PDF
W9123822R0008 Attachment 2 - DoL CWRR UT20220083 - 20220401.pdf PDF
W9123822R0008 Attachment 5 - Price Schedule - 20220706.pdf PDF
W9123822R0008011 388th Apron Amendment 011.pdf PDF
W9123822R0008011 Spec 2419 2022-APR-14.pdf PDF
W9123822R0008 AMENDMENT 0010.pdf PDF
Attachment 18 SOW VE HAFB W388thApron Design Build design phase 7Apr22.pdf PDF
Attachment 19 Revised Drawings.pdf PDF
Attachment 17 Spec 2419 AM0009 (2022-APR-05).pdf PDF
Attachment 16 Revised Drawings AM0009- 4 April 2022.pdf PDF
W9123822R0008-0009 AMENDMENT 0009.pdf PDF
INFORMATION ONLY Hydrant_Fuel_Pit_Detials.pdf PDF
Attachment 1 Spec 2419 (Searchable Hill AFB West 388th Apron).pdf PDF
Attachment 10 BASE FACILITY DESIGN STANDARD.pdf PDF
Attachment 7 2021_Value Study Report Guide.pdf PDF
Attachment 14 PCASE PCC_4DL_6SUBBASE_TRAFFIC AREA_A.pdf PDF
Attachment 13 PCASE ACC Shoulder .pdf PDF
Attachment 8 Value Engineering Preparing the In Brief Presentation Guidelines.pdf PDF
Phase 2 Attachment 3 Site Visit Map.pdf PDF
Attachment 9 Revised Drawing Cut Sheets.pdf PDF
W9123822R0008-0008 AMENDMENT 0008.pdf PDF
Attachment 11 Hill AFB Seed Mixture.pdf PDF
Attachment 12 Hill AFB West 388th 419th Apron Preliminary Geotechnical Information.pdf PDF
Attachment 15 Crew Shelters As-Built Drawings.pdf PDF
West 388th Apron Site Visit Sign In.pdf PDF
West 388th apron site walk photos.pdf PDF
Phase 2 Attachment 2 CWRR Heavy and Building.pdf PDF
Phase 2 Attachment 4 Drawings.pdf PDF
Phase 3 Attachment 3 Site Visit Map.pdf PDF
Phase 2 Attachment 3 Supplemental Contract Requirements.pdf PDF
1442 W9123822R0008 A0007.pdf PDF
Phase 2 Attachment 1 Specifications .pdf PDF
Phase 2 Attachment 6 Pre-Award Survey .pdf PDF
Phase 2 Attachment 2 Drawings.pdf PDF
Phase 2 Attachment 5 Price Schedule.pdf PDF
Phase 2 Attachment 4 CWRR Heavy and Building.pdf PDF
W9123822R0008 Amendment 0006.pdf PDF
28 December 2021 W9123822R0008 Interested Vendors List.docx DOCX document
W9123822R0008 AMENDMENT 0005.pdf PDF
W9123822R0008 AMENDMENT 0004.pdf PDF
Attachment 4 Part 1 BUILDING Wage Determination.pdf PDF
Attachment 4 Part 2 HEAVY CONSTRUCTION Wage Determination.pdf PDF
W9123822R0008 AMENDMENT 0003.pdf PDF
Attachment 5 - PROJECT INFORMATION FORM.pdf PDF
W9123822R0008 AMENDMENT 0002.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

Notice history

Notice Type Posted
West 388th/419th Fighter Wing Apron at Hill AFB Award Award Notice
This notice Latest solicitation Solicitation
West 388th/419th Fighter Wing Apron at Hill AFB Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
F-35 Composite Repair and Training Facility / F-35 Maintenance Facility, Hill Air Force Base, Utah Hill Air Force Base, Utah, United States · NAICS 236210 ENDIST Sacramento No set-aside
HAFB Multiple Award Construction Contract V (MACC V) Hill AFB, UT (Davis County) Utah Test and Training Range (Uttr) Little Mountain Test Facility (Lmtf) Utah Air National Guard (Utang) Base Boulder Seismic Site, WY Other: Geographically separated units (GSU) under the responsibility of 75 ABW/CC · NAICS 236220 Air Force Sustainment Center Total Small Business
SABER V Hill AFB NAICS 236220 Air Force Sustainment Center Competitive 8(a)
PKA Relocatable Facility FE Warren AFB, Wyoming 82005, United States · NAICS 332311 Global Strike Command Total Small Business
FY26 project WWXT240800 multi-purpose apron and taxiway, royal australian air force (raaf) base tindal, australia Australia · NAICS 237310 Naval Facilities Engineering Command No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity