This amendment modifies a federal design-build contract solicitation to extend the proposal due date, update contract line item numbers and descriptions, increase quantities, add optional contract line items, and incorporate revised drawings and specifications. The solicitation is for design and construction services to remove and replace the pavement and sunshade shelters at the West 388th/419th Fighter Wing Apron at Hill Air Force Base in Utah. The contractor will design and install a new 15-inch thick concrete parking apron and aircraft parking configurations, along with dismantling and replacing sunshade shelters to provide coverage for each parking row. The response due date is extended to August 8, 2022 at 1:00 PM MST. The optional contract line items for additional sunshade shelters are modified to cover different aircraft parking positions and quantities are increased.

View the file

Other files

File Type Posted
Attachment 23 Revised Drawings G 002 and GC 100.pdf PDF
Attachment 5 Price Schedule 20220729.pdf PDF
W9123822R0008 Attachment 5 - Price Schedule - 20220706.pdf PDF
W9123822R0008 Attachment 22 - DoL CWRR UT20220091 - 20220701.pdf PDF
W9123822R0008 Attachment 2 - DoL CWRR UT20220083 - 20220401.pdf PDF
W9123822R0008 Attachment 21 Revised Drawings G-002 GC-100 GC 101 and GC 102.pdf PDF
W9123822R0008-A0012 - 20220706.pdf PDF
W9123822R0008011 Spec 2419 2022-APR-14.pdf PDF
W9123822R0008011 388th Apron Amendment 011.pdf PDF
W9123822R0008 AMENDMENT 0010.pdf PDF
Attachment 19 Revised Drawings.pdf PDF
Attachment 18 SOW VE HAFB W388thApron Design Build design phase 7Apr22.pdf PDF
W9123822R0008-0009 AMENDMENT 0009.pdf PDF
Attachment 16 Revised Drawings AM0009- 4 April 2022.pdf PDF
Attachment 17 Spec 2419 AM0009 (2022-APR-05).pdf PDF
INFORMATION ONLY Hydrant_Fuel_Pit_Detials.pdf PDF
W9123822R0008-0008 AMENDMENT 0008.pdf PDF
Attachment 10 BASE FACILITY DESIGN STANDARD.pdf PDF
Attachment 12 Hill AFB West 388th 419th Apron Preliminary Geotechnical Information.pdf PDF
Attachment 7 2021_Value Study Report Guide.pdf PDF
Attachment 8 Value Engineering Preparing the In Brief Presentation Guidelines.pdf PDF
Attachment 13 PCASE ACC Shoulder .pdf PDF
Attachment 9 Revised Drawing Cut Sheets.pdf PDF
Attachment 1 Spec 2419 (Searchable Hill AFB West 388th Apron).pdf PDF
Attachment 11 Hill AFB Seed Mixture.pdf PDF
Attachment 15 Crew Shelters As-Built Drawings.pdf PDF
Attachment 14 PCASE PCC_4DL_6SUBBASE_TRAFFIC AREA_A.pdf PDF
Phase 2 Attachment 3 Site Visit Map.pdf PDF
West 388th Apron Site Visit Sign In.pdf PDF
West 388th apron site walk photos.pdf PDF
Phase 2 Attachment 2 CWRR Heavy and Building.pdf PDF
Phase 3 Attachment 3 Site Visit Map.pdf PDF
Phase 2 Attachment 4 Drawings.pdf PDF
Phase 2 Attachment 6 Pre-Award Survey .pdf PDF
Phase 2 Attachment 4 CWRR Heavy and Building.pdf PDF
Phase 2 Attachment 2 Drawings.pdf PDF
Phase 2 Attachment 1 Specifications .pdf PDF
1442 W9123822R0008 A0007.pdf PDF
Phase 2 Attachment 5 Price Schedule.pdf PDF
Phase 2 Attachment 3 Supplemental Contract Requirements.pdf PDF
W9123822R0008 Amendment 0006.pdf PDF
28 December 2021 W9123822R0008 Interested Vendors List.docx DOCX document
W9123822R0008 AMENDMENT 0005.pdf PDF
W9123822R0008 AMENDMENT 0004.pdf PDF
Attachment 4 Part 1 BUILDING Wage Determination.pdf PDF
W9123822R0008 AMENDMENT 0003.pdf PDF
Attachment 4 Part 2 HEAVY CONSTRUCTION Wage Determination.pdf PDF
Attachment 5 - PROJECT INFORMATION FORM.pdf PDF
W9123822R0008 AMENDMENT 0002.pdf PDF
W9123822R0008 AMENDMENT 0001.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 0013 is issued to:

1. Extend the proposal due date to 8 August 2022 at 1300 PST.

2. Update the CLIN structure to break out optional w ork, as stated in solicitation section 00 10 00.

3. Update Attachment 5, Price Schedule, to the revised version dated 29 July 2022.

4. Incorportate Attachment 23, Revised Draw ings, G-002 and GC 100.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Aug-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123822R0008

X 9B. DATED (SEE ITEM 11)

29-Nov-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Aug-2022

CODE

USACE SACRAMENTO DISTRICT

ATTN: CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123822R0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 01 10 - TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT

TYPE

DESCRIPTION PAGES DATE

Attachment 1 HAFB W 388th Specification Number 2419

641 03-JAN-2022

Attachment 2 DoL Construction Wage Rate Requirement UT20220083

6 01-APR-2022

Attachment 3 Site Visit Map 2 03-JAN-2022 Attachment 4 HAFB W 388th Plans 55 03-JAN-2022 Attachment 5 Price Schedule 1 06-JUL-2022 Attachment 6 Pre-Award Survey 4 02-MAR-2022 Attachment 7 2021_Value Study Report Guide 25 14-DEC-2020

Attachment 8 Value Engineering Preparing the In Brief Presentation Guidelines

1 29-MAR-2022

Attachment 9 Revised Drawing Cut Sheets 8 29-MAR-2022 Attachment 10 Base Facility Design Standard 106 12-OCT-2020 Attachment 11 Hill AFB Seed Mixture 2 25-FEB-2014

Attachment 12 Hill AFB West 388th & 419th Apron Preliminary Geotechnical Information

47 22-JAN-2020

Attachment 13 PCASE ACC Shoulder 1 14-JUN-2021

Attachment 14

PCASE PCC_4DL_6SUBBASE

_TRAFFIC AREA_A

1 14-JUN-2021

Attachment 15 Crew Shelters As-Built Drawings 39 01-AUG-2010 Attachment 16 Revised Drawing AMD 0009 17 04 -APR-2022

Attachment 17 Revised Specifications 2419 AMD

128 04 -APR-2022

Attachment 18 SOW VE in Design Build Design Phase

5 01-JAN-2011

Attachment 19 Revised Drawings 6 06-APR-2022 Attachment 20 Revised Specification 55 14-APR-2022

Attachment 21 Revised Drawings G-002 & GC-100, 101, and 102

4 01-JUL-2022

Attachment 22 DoL Construction Wage Rate Requirement UT20220091

5 01-JUL-2022

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 A01 HAFB W 388th

Specifications

641 01-JAN-2022

Attachment 10 A10 Base Facility Design Standard

106 29-MAR-2022

Attachment 11 A11 HAFB Seed Mixture 2 29-MAR-2022 Attachment 12 A12 HAFB W388th

Preliminary Geotechnical Info

47 29-MAR-2022

Attachment 13 A13 PCASE ACC Shoulder

1 14-JUN-2021

Attachment 14 A14 PCASE PCC Subbase Traffic Area A

1 14-JUN-2021

Attachment 15 A15 Crew Shelter As- Built Drawings

39 01-AUG-2010

Attachment 16 A16 Revised Drawings

AM0009

17 18-MAR-2022

Attachment 17 A17 Spec 2419 AM0009

(2022-APR-05)

128 21-JUN-2022

Attachment 18 A18 SOW VE HAFB W388th Apron DB Phase

5 01-NOV-2011

Attachment 19 A19 Revised Drawings 6 18-MAR-2022 Attachment 2 A02 DoL WD

UT20220091

11 01-JUL-2022

Attachment 20 A20 Spec 2419 55 18-APR-2022 Attachment 21 A21 Revised Drawings

G-002, GC-100-102

4 01-JUL-2022

Attachment 22 A22 DoL CWRR

UT20220091

5 01-JUL-2022

Attachment 23 A23 Revised Drawings G-002 and GC 100

2 18-JUL-2022

Attachment 3 A03 HAFB Site Visit Map

2 03-JAN-2022

Attachment 4 A04 Drawings 55 18-JAN-2022 Attachment 5 A05 Price Schedule 2 29-JUL-2022 Attachment 6 A06 Pre-Award Survey 4 02-MAR-2022 Attachment 7 A07 2021 Value Study

Report Guide

25 29-MAR-2022

Attachment 8 A08 Value Engineering Presentation Guidelines

1 29-MAR-2022

Attachment 9 A09 Revised Drawing Cut Sheets

8 29-MAR-2022

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 14-Jul-2022 01:00 PM to 08-Aug-

2022 01:00 PM.

CLIN 1003

The CLIN description has changed from SHADE STRUCTURES 19 & 20 to SHADE

STRUCTURES 1 - 7.

The CLIN extended description has changed from:

The Contractor shall provide all materials, equipment, labor, supervision, and perform all other design-build construction services required to provide and install sunshades in aircraft parking positions 19 and 20 at the West 388th Apron at Hill Air Force Base, Utah, in accordance with the terms of the contract, project plans, specifications, and all other attachments.This optional contract line item may be exercised by written notice to the Contractor at any time within the contract period of performance. No extension to the contract period of performance or change in applicable wage determination will be granted for exercising this option, provided that the option is exercised within seven-hundred-thirty (730) calendar days from the date the Contractor receives the Notice to Proceed.

To:

The Contractor shall provide all materials, equipment, labor, supervision, and perform all other design-build construction services required to provide and install sunshades in aircraft parking positions 1 through 7 at the West 388th Apron at Hill Air Force Base, Utah, in accordance with the terms of the contract, project plans, specifications, and all other attachments. This optional contract line item may be exercised by written notice to the Contractor at any time within the contract period of performance. No extension to the contract period of performance or change in applicable wage determination will be granted for exercising this option, provided that the option is exercised within seven-hundred-thirty (730) calendar days from the date the Contractor receives the Notice to Proceed.

The pricing detail quantity has increased by 5.00 from 2.00 to 7.00.

CLIN 1004

The CLIN description has changed from SHADE STRUCTURES 21 & 22 to SHADE

STRUCTURES 8 - 13.

The CLIN extended description has changed from:

The Contractor shall provide all materials, equipment, labor, supervision, and perform all other design-build construction services required to provide and install sunshades in aircraft parking positions 21 and 22 at the West 388th Apron at Hill Air Force Base, Utah, in accordance with the terms of the contract, project plans, specifications, and all other attachments.This optional contract line item may be exercised by written notice to the Contractor at any time within the contract period of performance. No extension to the contract period of performance or change in applicable wage determination will be granted for exercising this option, provided that the option design-build construction services required to provide and install sunshades in aircraft parking positions 8 through 13 at the West 388th Apron at Hill Air Force Base, Utah, in accordance with the terms of the contract, project plans, specifications, and all other attachments. This optional contract line item may be exercised by written notice to the Contractor at any time within the contract period of performance. No extension to the contract period of performance or change in applicable wage determination will be granted for exercising this option, provided that the option is exercised within seven-hundred-thirty (730) calendar days from the date the Contractor receives the Notice to Proceed.

The pricing detail quantity has increased by 4.00 from 2.00 to 6.00.

CLIN 1005

The CLIN description has changed from SHADE STRUCTURES 23 & 24 to SHADE

STRUCTURES 14 - 20.

The CLIN extended description has changed from:

The Contractor shall provide all materials, equipment, labor, supervision, and perform all other design-build construction services required to provide and install sunshades in aircraft parking positions 23 and 24 at the West 388th Apron at Hill Air Force Base, Utah, in accordance with the terms of the contract, project plans, specifications, and all other attachments.This optional contract line item may be exercised by written notice to the Contractor at any time within the contract period of performance. No extension to the contract period of performance or change in applicable wage determination will be granted for exercising this option, provided that the option design-build construction services required to provide and install sunshades in aircraft parking positions 14 through 20 at the West 388th Apron at Hill Air Force Base, Utah, in accordance with the terms of the contract, project plans, specifications, and all other attachments. This optional contract line item may be exercised by written notice to the Contractor at any time within the contract period of performance. No extension to the contract period of performance or change in applicable wage determination will be granted for exercising this option, provided that the option is exercised within seven-hundred-thirty (730) calendar days from the date the Contractor receives the Notice to Proceed.

The pricing detail quantity has increased by 5.00 from 2.00 to 7.00.

CLIN 1006

The CLIN description has changed from SHADE STRUCTURES 25 & 26 to SHADE

STRUCTURES 21 - 23.

The CLIN extended description has changed from:

The Contractor shall provide all materials, equipment, labor, supervision, and perform all other design-build construction services required to provide and install sunshades in aircraft parking positions 25 and 26 at the West 388th Apron at Hill Air Force Base, Utah, in accordance with the terms of the contract, project plans, specifications, and all other attachments.This optional contract line item may be exercised by written notice to the Contractor at any time within the contract period of performance. No extension to the contract period of performance or change in applicable wage determination will be granted for exercising this option, provided that the option design-build construction services required to provide and install sunshades in aircraft parking positions 21 through 23 at the West 388th Apron at Hill Air Force Base, Utah, in accordance with the terms of the contract, project plans, specifications, and all other attachments. This optional contract line item may be exercised by written notice to the Contractor at any time within the contract period of performance. No extension to the contract period of performance or change in applicable wage determination will be granted for exercising this option, provided that the option is exercised within seven-hundred-thirty (730) calendar days from the date the Contractor receives the Notice to Proceed.

The pricing detail quantity has increased by 1.00 from 2.00 to 3.00.

CLIN 1007 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

1007 3 Each

OPTION SHADE STRUCTURES 24 - 26

FFP

The Contractor shall provide all materials, equipment, labor, supervision, and perform all other design-build construction services required to provide and install sunshades in aircraft parking positions 24 through 26 at the West 388th Apron at Hill Air Force Base, Utah, in accordance with the terms of the contract, project plans, specifications, and all other attachments.

This optional contract line item may be exercised by written notice to the Contractor at any time within the contract period of performance. No extension to the contract period of performance or change in applicable wage determination will be granted for exercising this option, provided that the option is exercised within seven-hundred-thirty (730) calendar days from the date the Contractor receives the Notice to Proceed.

FOB: Destination

PSC CD: Z2LA

NET AMT

The following Delivery Schedule item for CLIN 1003 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

730 dys. ANP 2 UTAH AREA OFFICE

7227 6TH STREET (COE) BUILDING 366

HILL AFB UT 84056-5214

W91238

CAGE

730 dys. ANP 7 UTAH AREA OFFICE

7227 6TH STREET (COE) BUILDING 366

HILL AFB UT 84056-5214

The following Delivery Schedule item for CLIN 1004 has been changed from:

CAGE

730 dys. ANP 2 UTAH AREA OFFICE

7227 6TH STREET (COE) BUILDING 366

HILL AFB UT 84056-5214

CAGE

730 dys. ANP 6 UTAH AREA OFFICE

7227 6TH STREET (COE) BUILDING 366

HILL AFB UT 84056-5214

The following Delivery Schedule item for CLIN 1005 has been changed from:

CAGE

730 dys. ANP 2 UTAH AREA OFFICE

7227 6TH STREET (COE) BUILDING 366

HILL AFB UT 84056-5214

CAGE

730 dys. ANP 7 UTAH AREA OFFICE

7227 6TH STREET (COE) BUILDING 366

HILL AFB UT 84056-5214

The following Delivery Schedule item for CLIN 1006 has been changed from:

CAGE

730 dys. ANP 2 UTAH AREA OFFICE

7227 6TH STREET (COE) BUILDING 366

HILL AFB UT 84056-5214

CAGE

730 dys. ANP 3 UTAH AREA OFFICE

7227 6TH STREET (COE) BUILDING 366

HILL AFB UT 84056-5214

The following Delivery Schedule for CLIN 1007 has been added:

CAGE

730 dys. ANP 3 UTAH AREA OFFICE

7227 6TH STREET (COE) BUILDING 366

HILL AFB UT 84056-5214

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following Acceptance/Inspection Schedule was added for CLIN 1007:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

Destination Government Destination Government

(End of Summary of Changes)