W9123822R0008 Attachment 5 - Price Schedule - 20220706.pdf

PDF 86 KB Posted

Attached to
West 388th/419th Fighter Wing Apron at Hill AFB
Solicitation number
W9123822R0008
Issued by

About this file

This document contains a price schedule and details for a federal design-build contract opportunity. The contract is to remove and replace the West portion of the 388th/419th Fighter Wing F-35 Apron at Hill Air Force Base in Utah. The scope of work includes demolishing the existing 12-inch Portland cement concrete pavement and replacing it with a new 15-inch section. It will also replace approximately 40-year old sunshade shelters with appropriately sized panels, install a stabilized drainage layer and new subbase course material. One additional crew shack will be provided to ensure each parking row has a shack. The apron will be re-marked as part of the project. The price schedule outlines unit pricing for various work items such as mobilization, demolition, concrete and asphalt work. It also includes optional items for unstable soil replacement, asbestos removal and additional sunshade installations. The total proposed cost will include amounts for both the base contract and optional contract line items. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Sacramento.

View the file

Other files

File Type Posted
Attachment 23 Revised Drawings G 002 and GC 100.pdf PDF
W9123822R0008 A0013 20220801.pdf PDF
Attachment 5 Price Schedule 20220729.pdf PDF
W9123822R0008 Attachment 22 - DoL CWRR UT20220091 - 20220701.pdf PDF
W9123822R0008 Attachment 2 - DoL CWRR UT20220083 - 20220401.pdf PDF
W9123822R0008 Attachment 21 Revised Drawings G-002 GC-100 GC 101 and GC 102.pdf PDF
W9123822R0008-A0012 - 20220706.pdf PDF
W9123822R0008011 Spec 2419 2022-APR-14.pdf PDF
W9123822R0008011 388th Apron Amendment 011.pdf PDF
W9123822R0008 AMENDMENT 0010.pdf PDF
Attachment 19 Revised Drawings.pdf PDF
Attachment 18 SOW VE HAFB W388thApron Design Build design phase 7Apr22.pdf PDF
W9123822R0008-0009 AMENDMENT 0009.pdf PDF
Attachment 16 Revised Drawings AM0009- 4 April 2022.pdf PDF
Attachment 17 Spec 2419 AM0009 (2022-APR-05).pdf PDF
INFORMATION ONLY Hydrant_Fuel_Pit_Detials.pdf PDF
W9123822R0008-0008 AMENDMENT 0008.pdf PDF
Attachment 10 BASE FACILITY DESIGN STANDARD.pdf PDF
Attachment 12 Hill AFB West 388th 419th Apron Preliminary Geotechnical Information.pdf PDF
Attachment 7 2021_Value Study Report Guide.pdf PDF
Attachment 8 Value Engineering Preparing the In Brief Presentation Guidelines.pdf PDF
Attachment 13 PCASE ACC Shoulder .pdf PDF
Attachment 9 Revised Drawing Cut Sheets.pdf PDF
Attachment 1 Spec 2419 (Searchable Hill AFB West 388th Apron).pdf PDF
Attachment 11 Hill AFB Seed Mixture.pdf PDF
Attachment 15 Crew Shelters As-Built Drawings.pdf PDF
Attachment 14 PCASE PCC_4DL_6SUBBASE_TRAFFIC AREA_A.pdf PDF
Phase 2 Attachment 3 Site Visit Map.pdf PDF
West 388th Apron Site Visit Sign In.pdf PDF
West 388th apron site walk photos.pdf PDF
Phase 2 Attachment 2 CWRR Heavy and Building.pdf PDF
Phase 3 Attachment 3 Site Visit Map.pdf PDF
Phase 2 Attachment 4 Drawings.pdf PDF
Phase 2 Attachment 6 Pre-Award Survey .pdf PDF
Phase 2 Attachment 4 CWRR Heavy and Building.pdf PDF
Phase 2 Attachment 2 Drawings.pdf PDF
Phase 2 Attachment 1 Specifications .pdf PDF
1442 W9123822R0008 A0007.pdf PDF
Phase 2 Attachment 5 Price Schedule.pdf PDF
Phase 2 Attachment 3 Supplemental Contract Requirements.pdf PDF
W9123822R0008 Amendment 0006.pdf PDF
28 December 2021 W9123822R0008 Interested Vendors List.docx DOCX document
W9123822R0008 AMENDMENT 0005.pdf PDF
W9123822R0008 AMENDMENT 0004.pdf PDF
Attachment 4 Part 1 BUILDING Wage Determination.pdf PDF
W9123822R0008 AMENDMENT 0003.pdf PDF
Attachment 4 Part 2 HEAVY CONSTRUCTION Wage Determination.pdf PDF
Attachment 5 - PROJECT INFORMATION FORM.pdf PDF
W9123822R0008 AMENDMENT 0002.pdf PDF
W9123822R0008 AMENDMENT 0001.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9123822R0008 Price Schedule Page 1 of 2

W9123822R0008 Attachment 5 - Price Schedule

West 388th Apron Repair - Hill Air Force Base (HAFB), Utah (UT)

Base Contract Line Item Number (CLIN) 0001: HAFB West 388th Apron Repairs

PRICING

ELEMENT

DESCRIPTION

QTY

UNIT OF

MEASURE

UNIT PRICE

TOTAL PRICE

01 Mobilization and Demobilization 1 Job

02 Demolition 1 Job

Provide and Operate Concrete Batch Plant 1 Job

Install New Portland Cement Concrete Pavement and Markings 1 Job

Demolish Existing Asphalt and Install New Asphalt 34,335 Square Feet

06 Demolish Existing Shade Structures 26 Each

Install Shade Structures - Parking Positions 01 - 18 18 Each

Install Shade Structure Foundations - Parking Positions 01 - 26 26 Each

Electrical Work from Crew Shacks to Sunshades 1 Job

Electrical Work (installation of the crew shack main electrical panels and electrical distribution from the crew shacks to the main power source)

1 Job

11 Communications 1 Job

Remove and Reinstall Existing Crew Shack 1 Job

13 Provide and Install New Crew Shack 1 Job

CLIN 0001 SUBTOTAL

W9123822R0008 Price Schedule Page 2 of 2

Option CLINs 1001 - 1006

CLIN

DESCRIPTION

QTY

UNIT OF

MEASURE

UNIT PRICE

TOTAL PRICE

1001 Unstable Soil Replacement 4,206 Cubic Yards

1002 Asbestos Pipe Removal 500 Linear Feet

Provide and Install Shade Structures - Parking Positions 19 - 20 2 Each

Parking Positions 21 - 22 2 Each

Parking Positions 23 - 24 2 Each

Parking Positions 25 - 26 2 Each

OPTION CLIN SUBTOTAL