This document contains a price schedule and details for a federal design-build contract opportunity. The contract is to remove and replace the West portion of the 388th/419th Fighter Wing F-35 Apron at Hill Air Force Base in Utah. The scope of work includes demolishing the existing 12-inch Portland cement concrete pavement and replacing it with a new 15-inch section. It will also replace approximately 40-year old sunshade shelters with appropriately sized panels, install a stabilized drainage layer and new subbase course material. One additional crew shack will be provided to ensure each parking row has a shack. The apron will be re-marked as part of the project. The price schedule outlines unit pricing for various work items such as mobilization, demolition, concrete and asphalt work. It also includes optional items for unstable soil replacement, asbestos removal and additional sunshade installations. The total proposed cost will include amounts for both the base contract and optional contract line items. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Sacramento.
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9123822R0008 Price Schedule Page 1 of 2
W9123822R0008 Attachment 5 - Price Schedule
West 388th Apron Repair - Hill Air Force Base (HAFB), Utah (UT)
Base Contract Line Item Number (CLIN) 0001: HAFB West 388th Apron Repairs
PRICING
ELEMENT
DESCRIPTION
QTY
UNIT OF
MEASURE
UNIT PRICE
TOTAL PRICE
01 Mobilization and Demobilization 1 Job
02 Demolition 1 Job
Provide and Operate Concrete Batch Plant 1 Job
Install New Portland Cement Concrete Pavement and Markings 1 Job
Demolish Existing Asphalt and Install New Asphalt 34,335 Square Feet
06 Demolish Existing Shade Structures 26 Each
Install Shade Structures - Parking Positions 01 - 18 18 Each
Install Shade Structure Foundations - Parking Positions 01 - 26 26 Each
Electrical Work from Crew Shacks to Sunshades 1 Job
Electrical Work (installation of the crew shack main electrical panels and electrical distribution from the crew shacks to the main power source)
1 Job
11 Communications 1 Job
Remove and Reinstall Existing Crew Shack 1 Job
13 Provide and Install New Crew Shack 1 Job
CLIN 0001 SUBTOTAL
W9123822R0008 Price Schedule Page 2 of 2
Option CLINs 1001 - 1006
CLIN
DESCRIPTION
QTY
UNIT OF
MEASURE
UNIT PRICE
TOTAL PRICE
1001 Unstable Soil Replacement 4,206 Cubic Yards
1002 Asbestos Pipe Removal 500 Linear Feet
Provide and Install Shade Structures - Parking Positions 19 - 20 2 Each
Parking Positions 21 - 22 2 Each
Parking Positions 23 - 24 2 Each
Parking Positions 25 - 26 2 Each
OPTION CLIN SUBTOTAL
TOTAL PROPOSED COST (including base and all options)