Phase 2 Attachment 2 CWRR Heavy and Building.pdf
PDF 3 MB Posted
- Attached to
- West 388th/419th Fighter Wing Apron at Hill AFB
- Solicitation number
- W9123822R0008
About this file
This solicitation is for a design-build contract to remove and replace the West portion of the 388th/419th Fighter Wing F-35 Apron at Hill Air Force Base. The scope of work includes dismantling and removing the existing 12-inch thick Portland cement concrete pavement and sunshades, which will be recycled. The contractor will replace it with a new 15-inch thick PCC apron, stabilized drainage layer, subbase course material, and new sunshades. One additional crew shack will also be provided. The awarded contractor will be responsible for the complete design and construction documents in accordance with the provided design criteria, drawings, supplemental requirements and relevant codes. The Department of the Army Corps of Engineers Engineering District Sacramento is the issuing agency.
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .